n..
A 8-o,'n -
UNITED STATES NUCLEAR REGULATORY COMMISSION h
WASHINGTON, D. C. 20555 4,.....,8 PACIFIC GAS AND ELECTRIC COMPANY DIABLO CANYON NUCLEAR POWER PLANT, UNIT 1 DOCKET NO. 50-275 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 40 License No. DPR-80 1.
The Nuclear Regulatory Commission (the Commission) has found that:
1 A.
The application for amendment by Pacific Gas & Electric Company (thelicensee),datedDecember 19, 1988 complies with the standards and requ hements of the Atomic Energy Act of 1954, as amended (the Act),.and tne Commission's regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and 1
E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
g61%$k [
[
,p l
P ty t-
C
' 2.
Accordingly, the license is amended by changes to the Technical.
Specifications as indicated in the attachment to this. license amendment, and paragraph 2.C.(2) of Facility Operating License No.
DPR-80 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment-No. 40, are hereby incorporated in the license.
Pacific Gas & Electric Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.
3.
This license amendment becomes effective at the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION g/
George W Knighton, ector Project Directorate V-Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Cate of-Issuance: June 7, 1989
. _ _ -,. - _ _ _ = _ _ _ _ _.
pn ug g'o,,
UNITED STATES 8
NUCLEAR REGULATORY COMMISSION o
' 7,,
- E WASHINGTON, D. C. 20555
%, <....,o PACIFIC GAS AND ELECTRIC COMPANY l
DIABLO CANYON NUCLEAR POWER PLANT, UNIT 2 DOCKET NO. 50-323, AMENDMENT TO FACILITY OPERATING LICENSE L
Amendment No. 39 License No. DPR-82 L
l 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application ~for amendment by Pacific Gas & Electric Company
-(the licensee), dated December 19, 1988 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and.the Commission's regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission; C..
Thereisreasonableassurance(i)thattheactivitiesauthorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety.of the public; and E.
The issuance of this amendment is in accordance with 10.CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
=
- _ - _ _ _ _ _ = _ - _ - _ _ _ _ _
1 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-82 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A and the
~
Environmental Protection Plan contained in Appendix B, as revised through Amendment'No. 39, are hereby incorporated in the license.
Pacific Gas & Electric Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.
3.
This license amendment becomes effective at the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION a
01 George n, Dir - or Project Directorate V Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: June 7, 1989 l'
L
4 ATTACHMENT TO LICENSE AMENDMENT NOS. 40 AND 39 FACILITY OPERATING LICENSE NOS. DPR-80 and DPR-82 DOCKET NOS.-50-275 AND 50-323 Replace the following pages of the Appendix "A" Technical Specifications with the attached pages.
The. revised pages are identified by Amendment number and contain vertical lines indicating the areas of change. Overleaf pages are also included, as appropriate.
Remove Page Insert Page 3/4 1-21 3/4 1-21 3/4 1-23 3/4 1-23 3/4 1-24 3/4 1-24
________.-____.__i______..______
~
R'EACTIVITY CONTROL SYSTEMS
.at:
SHUTDOWN ROD INSERTION LIMIT LIMITING CONDITION FOR OPERATION.
3.1.3.5 All shutdown rods shall be withdrawn to at least 225 steps.
APPLICABILITY: MODES 1* and 2*#.
ACTION:
With a maximum of one shutdown rod withdrawn to less than 225 steps, except for surveillance testing pursuant to Specification 4.1.3.1.2, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> either:
a.
Withdraw the rod to at least 225 steps, or b.
Declare the rod to be inoperable and apply Specification 3.1.3.1.
SURVEILLANCE REQUIREMENTS 4.1.3.5 Each shutdown roa shall be determined to be withdrawn to at least 225 steps l
a.
Within 15 minutes prior to withdrawal of any. rods in Control Banks A, B, C or D during an approach to reactor criticality, and At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter.
u.
i "See Special Test Exceptions Specifications 3.10.2 and 3.10.3.
- With K,ff greater than or equal to 1.
DIABLO CANYON - UNITS 1 & 2 3/4 1-21 Amendment Nos.40 and 39 l
L._ _
f REACTIVITY CONTROL SYSTEMS CONTROL ROD INSERTION LIMITS LIMITING CONDITION FOR OPERATION 3.1.3.6 - The control banks shall be limited in physical insertion as shown in Figure 3.1-la for Unit 1 and Figure 3.1-lb for Unit 2.
APPLICABILITY:
MODES la and 2*#.
ACTION:
-With the control banks inserted beyond the above insertion limits, except for surveillance testing pursuant to Specification 4.1.3.1.2:
Restore the control banks to within the limits within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, or a.
b.
Reduce THERMAL POWER within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to less than or equal to that fraction of RATED THERMAL POWER which 'Is allowed by the group position using the above figures, or c.
Be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
SURVEILLANCE REQUIREMENTS 4.1.3.6 The position of each control bank shall be determined to be within the insertion limits at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> except during time intervals when'the rod insertion limit monitor is inoperable, then verify the individual rod positions at least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
I I
l l
- See Special Test Exceptions Specifications 3.10.2 and 3.10.3.
- With K,ff greater than or equal to 1.
1 DIABLO CANYON - UNITS 1 & 2 3/4 1-22 J
l l
)
l (Fully withdrawn.1225 steps)
BANK A BANK A & B B ANKS A.B. & C
/ <o.1s.22s>
f<o.es. 22s>
f
(
j BANK B j
200 I
.183) 180 f
f (1.0.177) t f
f r}
}
aANK c r
a.
f f
Y
)
)
m'
{'
BANKD m
80 O
OE 60 g(0.55) g 40
(
/
Ilds"s E9"atWiirn ^
I 20
[(o.28.o>
l IN!?dw"eVa!I#s" "
l l
l l
2 o
l 0
10 20 30 40 50 60 70 80 90 100 PERCENT OF RATED THERMAL POWER FIGURE 3.1-la ROD BANK INSERTION LIMITS VERSUS THERMAL POWER (UNIT 1)
DIABLO CANYON - UNITS 1 & 2 3/4 1-23 Amendment Nos.40 and 39
(Fully withe
'n.1225 steps)
BANK A & B B ANKS A,B, & C 220 f(o.s1.228) i 200 g
(1.0,188)
O 1so E
[
'8
)
BANK C 140
)!
h 120 c --
w g
'00 'gg, g, gg)
BANK D m
80 o
O E
80 40 g
0 T LRMAL POWER LIMITED TO A f
(
"he%nst' L'1*R e'uiaR8u
)
j FLUX POWER RANGE TRIP t
f(o.14.0) l l
l l
0 10 20 30 40 50 60 70 80 90 100 PERCENT OF RATED THERMAL POWER FIGURE 3.1-lb R0D BANK INSERTION LIMITS VERSUS THERMAL POWER (UNIT 2) l DIABLO CANYGN - UNITS 1 & 2 3/4 1-24 Amendment Nos. 40 and 39
- _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ - _ _ _ _ _