Revised Monthly Operating Rept for Feb 1989 for Millstone Unit 2
ML20244C598
Person / Time
Site: Millstone 
Issue date: 02/28/1989
From: Gibson J
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20244C594 List:
References
NUDOCS 8904200293
Download: ML20244C598 (1)


Text

-____ _ _ _

[

m'*..

?

a< .

l OPERATING DATA REPORT DOCKET NO.

50-336 DATE 03/09/89 COMPLETED BY J. Gibson

' TELEPHONE (203)447-1791 Extension 4431 OPERATING STATUS r_

11.

~ Unit Name: Millstone Unit 2 Notes: Items 21 and 22 2'

. Reporting Period: February 1989 cumulative are weighted 3.

Licensed Thermal Power (MWt) : 2700 averages. Unit operated 4.

Nameplate Rating (Gross MWe): 909 at 2560 MW Thermal prior 5.

Design ~ Electrical Rating (Net MWe) : 870 to its uprating to the

'6.

Maximum Dependable Capacity (Gross Mhe) :893.88 current 2700 MWTH power 7.

Maximum Dependable Capacity (Net MWe): 862.88 level.

8.

If Changes Occur in Capacity Ratings.

(Items Number 3 Through 7)

Since Last Report, Give Reasons: N/A 9.

Power Level to Which. Restricted, If Any (Net MWe) : N/A

.10. Reasons For Restrictions, If Any: N/A This Month Year to Date Cumulative

.11. Hours In Reporting Period 672 1416 115536

12. Number Of Hours Reactor Was Critical 82.1 826.1 85159.5 E13. Reactor Reserve Shutdown Hours 0

0 2205.5 14.-Hours. General On-Line 76.3 820.3 80885.7

15. Unit Reserve Shutdown Hours 0

0 468.2

10. Gross Thermal Energy Generated (MWH) 201767.0 2210234.0 224861514.0
17. Gross Elec. ' Energy Generated (MWH) 65611.5 721026.0 67551546.5
18. Net Electrical Energy Generated (MWH) 60484.5 692960.0 64802106.5 c
19. Unit Service Factor 11.4 57.9 70.0 20.. Unit Availability Factor 11.4 57.9 70.4
21. Unit Capacity Factor (Using MDC Net) 10.4 56.7 66.1
22. Unit Capacity Factor (Using DER Net) 10.3 56.3 65.1
23. Unit Forced Outage Rate 0.0 0.0 14.6
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

. Currently in refueling shutdown.

25. If Shutdown at End of Report Period, Estimated Date of Startup:

lApproximately April 1, 1989

26. Units in Test Status (Prior to Commercial Operation):

Forcast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A hDO g6 R