l OPERATING DATA REPORT DOCKET NO.
50-336 DATE 03/09/89 COMPLETED BY J. Gibson
' TELEPHONE (203)447-1791 Extension 4431 OPERATING STATUS r_
11.
~ Unit Name: Millstone Unit 2 Notes: Items 21 and 22 2'
. Reporting Period: February 1989 cumulative are weighted 3.
Licensed Thermal Power (MWt) : 2700 averages. Unit operated 4.
Nameplate Rating (Gross MWe): 909 at 2560 MW Thermal prior 5.
Design ~ Electrical Rating (Net MWe) : 870 to its uprating to the
'6.
Maximum Dependable Capacity (Gross Mhe) :893.88 current 2700 MWTH power 7.
Maximum Dependable Capacity (Net MWe): 862.88 level.
8.
If Changes Occur in Capacity Ratings.
(Items Number 3 Through 7)
Since Last Report, Give Reasons: N/A 9.
Power Level to Which. Restricted, If Any (Net MWe) : N/A
.10. Reasons For Restrictions, If Any: N/A This Month Year to Date Cumulative
.11. Hours In Reporting Period 672 1416 115536
- 12. Number Of Hours Reactor Was Critical 82.1 826.1 85159.5 E13. Reactor Reserve Shutdown Hours 0
0 2205.5 14.-Hours. General On-Line 76.3 820.3 80885.7
- 15. Unit Reserve Shutdown Hours 0
0 468.2
- 10. Gross Thermal Energy Generated (MWH) 201767.0 2210234.0 224861514.0
- 17. Gross Elec. ' Energy Generated (MWH) 65611.5 721026.0 67551546.5
- 18. Net Electrical Energy Generated (MWH) 60484.5 692960.0 64802106.5 c
- 19. Unit Service Factor 11.4 57.9 70.0 20.. Unit Availability Factor 11.4 57.9 70.4
- 21. Unit Capacity Factor (Using MDC Net) 10.4 56.7 66.1
- 22. Unit Capacity Factor (Using DER Net) 10.3 56.3 65.1
- 23. Unit Forced Outage Rate 0.0 0.0 14.6
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
. Currently in refueling shutdown.
- 25. If Shutdown at End of Report Period, Estimated Date of Startup:
lApproximately April 1, 1989
- 26. Units in Test Status (Prior to Commercial Operation):
Forcast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A hDO g6 R