ML20244B481
| ML20244B481 | |
| Person / Time | |
|---|---|
| Issue date: | 01/19/1989 |
| From: | Jordan E Committee To Review Generic Requirements |
| To: | Bernero R NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| References | |
| NUDOCS 8906130133 | |
| Download: ML20244B481 (2) | |
Text
__ ___
>F REGog e
o UNITED STATES
$3 NUCLEAR REGULATORY COMMISSION g
RELEASED TO THE PDR g
nj WASHINGTON. D. C. 20555 0,
8 January 19, 1989 MEMORANDUM FOR:
Robert M. Bernero, NMSS Jack R. Goldberg, OGC Carl J. Paperiello, RIII Denwood F. Ross, RES James H. Sniezek, NRR FROM:
Edward L. Jordan, Chairman Committee to Review Generic Requirements
SUBJECT:
CRGR MEETING NO. 156 The Committee'to Review Generic Requirements (CRGR) will meet on Wednesday, January 25, 1989 in Room MNBB-6110 from 1 p.m. to 3 p.m.
The agenda'is as follows:
1 p.m.
B. Grimes (NRR) will present for CRGR review a proposed rule regarding vehicle bomb contingency planning.
(A copy of the review was sent to you separately.
This contains safeguards material.)
In addition, the Committee will consider the following topics and determine whether CRGR review is required.
1.
A draft final rule extending the implementation period for certain provi-sions of the Property Insurance Rule (50.54(w)(5)(i)).
The staff has requested a waiver of CRGR, but the Committee may want to vote without a staff presentation.
(The submittal package is enclosed.)
2.
A draft safety evaluation report for topical report BAW 10163P, " Core Operating Limit Methodology for Westinghouse Design PWRs." (The submittal package is enclosed.)
If a CRGR member cannot attend the meeting, it is his responsibility to assure that an alternate, who is approved by the CRGR Chairman, attends the meeting.
Persons making presentations to the CRGR are responsible for (1) assuring that l
the information required for CRGR review is provided to the Committee (CRGR Charter - IV.B), (2) coordinating and presenting views of other offices, (3) as appropriate, assuring that other offices are represented during the presentation, and (4) assuring that agenda modifications are coordinated with the CRGR contact (C. Sakenas, x24148) and others involved with the presentation.
Division Directors or higher management should attend the meetings addressing agenda items under their purview.
If
}
']/
-.:y w
6 g
na62'us MS-MEETING 156
d J
-2'
{
.In accordance with the ED0's March 29, 1984 memorand'um to"the Commission con--
l cerning " Forwarding of CRGR Document 5 to the Public Document Room (PDR)," the
.i review packages for items. scheduled at this meeting,'which contain predecisional:
information, will not be released to the PDR'until.the NRC has' considered (in a public forum) or decided the matter addressed by the-information.
Driginal Sished ID f
E.D3dhe 1
Edward L. Jordan, Chairman Committee to Reviev Generic 1
Requirements.
j
- -(
1
Enclosures:
As stated cc/w enclosure:
SECY V. Stello, Jr.
Distribution:
u E. Jordan J. Heltemes J. Conran CICSCSakinA57 R. Fraley E. Rossi (w/o enc.)
C. Berlinger (w/o enc.)
P. Kadambi (w/o enc.)
B. Grimes (w/o enc.)-
CRGR SF 1
S. Treby (w/o enc.-)
J. Blaha (w/o enc.)
M. Taylor, DEDO PDR (NRC/CRGR) (w/o enc.)
Central File I
i
.l l
i 4
0FC.
- CRGR: AE0D..:DD: AE00
- C:CRGR:AEOD :
L i
- NAME :CSakenas.
- C ltemes :ELJordan
-DATE.$1/ /89:jr $1/l8l/89 1/li/89 l
1 i
- 0FFICIAL RECORD COPY I
,-