Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20211A4361999-08-18018 August 1999 Notification of Significant Licensee Meeting 99-47 with Entergy Nuclear,Inc on 990831 to Discuss Results of NRC Plant Performance Review of Pilgrim Nuclear Power Station Issued on 990409 ML20212H7621999-06-22022 June 1999 Notification of 990701 Meeting with NEI & Entergy in Rockville,Md to Discuss Price-Anderson Issues Re Transfer of Pilgrim License from Beco to Entergy ML20205L0301999-04-0909 April 1999 Notification of 990413 Meeting with Boston Edison Co & Entergy Nuclear Generation Co in Rockville,Md to Discuss Sale & Transfer of Pilgrim Station from Boston Edison Co to Entergy Nuclear Generation Co ML20196J5801998-12-0707 December 1998 Notification of 981209 Meeting with Representatives of Beco & Entergy in Rockville,Md to Discuss Sale of Pilgrim Plant ML20196F3461998-12-0202 December 1998 Forwards Info Re Operator Licensing Exam Administered on 981016-23 at Pilgrim Station,For Distribution Under Rids Code IE42 ML20196F5611998-12-0202 December 1998 Forwards Info Re OL Exam Administered on 981016-23 at Pilgrim Station,For Distribution Under Rids A070 ML20154D5091998-10-0202 October 1998 Notification of Meeting W/Beco on 981008 in Rockville,Md to Discuss Core Spray Piping Integrity ML20154G5141998-10-0202 October 1998 Notification of 981008 Meeting W/Beco in Rockville,Md to Discuss Core Spray Piping Integrity.Meeting Has Been Rescheduled to 981015 ML20247G2441998-04-15015 April 1998 Notification of Significant Licensee Meeting 98-34 W/Util on 980427 to Discuss Weaknesses in Licensee Alarm Assessment Program (EA 98-191) ML20203E2781998-02-19019 February 1998 Notification of Significant Licensee Meeting 98-18 W/Util in King of Prussia,Pa on 980310 Re Plant Design Basis Project Discussion ML20199C7581997-10-31031 October 1997 Notification of Significant Licensee Meeting 97-112 W/Util on 971113 to Discuss NRC SALP ML20212D6201997-10-28028 October 1997 Notification of Licensee Meeting on 971121 W/Util in King of Prussia,Pa to Discuss Apparent Violations Identified During NRC Insp 50-293/97-05 ML20140F6151997-06-11011 June 1997 Notification of 970612 Meeting W/Util in Rockville,Md to Discuss Net Positive Suction Head for ECCS Pumps ML20137Q9761997-03-31031 March 1997 Informs That as-found LOCA & Life Testing & Analysis Does Not Provide Acceptable Approach for Demonstrating Qualification at Accident Temp Higher than 340F,per 970110 TAR ML20137B4781997-03-14014 March 1997 Undated Memo Discussing Beco Reorganization ML20141A7361997-03-12012 March 1997 Rcommends That Key RES Staff Attend Subcommittee Meetings to Address Any Questions,Arise in Discussions Among Members & to Answer Any Key Questions Posed in Advance by Subcommittee Chairmen ML20149M3291996-11-12012 November 1996 Forwards Input Re TIA on Plant Licensing Basis & Subsequent Mod Under 10CFR50.59 for Two Safety Significant Problems ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20129D8331996-09-19019 September 1996 Notification of 961003 Predecisional Enforcement Conference 96-98 W/Util to Discuss Containment Penetration Protection. Meeting Closed to Public ML20134J7301996-07-26026 July 1996 Forwards Resolution of Spent Fuel Storage Pool Action Plan Issues Re Response to Two Postulated Event Sequences Involving SFP NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl IR 05000293/19930291993-11-23023 November 1993 Notification of Significant Licensee Meeting 93-156 W/Util on 931202 Re Three Recently Reported Design Issues in Insp Rept 50-293/93-29 ML20058C9711993-11-22022 November 1993 Notification of Significant Licensee Meeting 93-150 W/Util on 931217 Re Hpci/Rcic Reliability & Switchyard Betterment Status ML20059L9721993-11-12012 November 1993 Licensing Board Memorandum & Order Terminating Proceeding .* Informs That Time Provided by NRC Regulation to Review Decision of ASLB Terminating Proceeding in Docket Has Expired.W/Certificate of Svc.Served on 931112 ML20056C4721993-06-17017 June 1993 Discusses Util Assessment of Low Pressure Turbine Analysis. Licensee Retained Structural Integrity Assocs,Inc (SIA) to Evaluate Flaw Indications in 7GA Disk.Sia Anaylsis Reduce Some Obvious Conservatisms Used in GE Analysis ML20128F3911993-02-0303 February 1993 Requests Listed Instructions to Ensure That P Blanch of Northeast Utils & E Hadley of We the People Kept Promptly Informed of NRC Activities on BWR Water Level Indicators & Rosemount Transmitters ML20128E2181993-01-26026 January 1993 Notice of Significant Licensee Meeting 93-11 W/Licensee on 930225 in King of Prussia,Pa to Discuss Util Reorganization ML20059C1171992-11-20020 November 1992 Submits Status Rept on Reactor Water Level Spiking That Occurred on 921024.Related Info Encl ML20125D1161992-10-0707 October 1992 Notification of Significant Licensee Meeting 92-177 W/Util on 921217 to Discuss tie-in of New Security Computer ML20082B1581991-02-20020 February 1991 Summarizes Telcon W/R Murphy Re Mobilization Time for State of Ma Natl Guard Personnel Assigned to Respond to Wellesley, Ma Reception Ctr & State of Ma Civil Defense Agency Area II Headquarters in Event of Emergency at Facility ML20062H5361990-11-23023 November 1990 Forwards Info from Pilgrim Citizens Radiological Monitoring Network,Covering Rept Periods 900910-1017 ML20059P0861990-10-0101 October 1990 Notification of Significant Licensee Meeting 90-118 W/Util on 901016 to Discuss SALP ML20059L1541990-09-0707 September 1990 Notification of Significant Licensee Meeting 90-114 on 900912 at Region I Ofc to Discuss Corrective Actions & Restart Planning Re 900902 Manual Reactor Scram ML20059G4681990-08-0606 August 1990 Forwards Citizens Radiological Monitoring Network Weather Data Rept for Apr-Jul 1990 for Processing Through Nudocs Sys ML20127B4901990-08-0303 August 1990 Responds to 900726 Request for Recommendations for Appropriate Actions in Response to Inspector General Rept 90N-02 ML20127B4961990-08-0101 August 1990 Advises That Staff Did Not Conduct Thorough Review of Offsite Emergency Preparedness Which Resulted in Inaccurate Info Being Provided to Commission ML20058B4501990-06-28028 June 1990 Provides Status Rept Re Progress of off-site Emergency Preparedness Activities at Facility ML20055C2661990-02-0505 February 1990 Forwards Draft Ltr to Util Re Completion of Plant Power Ascension Program.Ltr Will Be Issued on 900209 Which Will Accept Util Completion of Power Ascension Program & Close Out Confirmatory Action Ltr CAL-86-10 ML20248C5841989-09-26026 September 1989 Notification of Significant Licensee Meeting 89-154 W/Util on 891006 in Plymouth,Ma to Discuss SALP Mgt ML20247N0121989-09-12012 September 1989 Forwards Plant Status Rept for 890826-0908.On 890830,reactor Automatically Scrammed Due to Fault on Main Generator Voltage Regulation Circuitry.On 890905,inadvertent Actuation LPCI Loop Select Logic Experienced ML20246N5751989-08-30030 August 1989 Forwards Plant Biweekly Status Rept for 890812-25 ML20245F6401989-08-0101 August 1989 Forwards Facility Biweekly Status Rept for 890715-28.NRC Restart Staff in Place & Onsite Monitoring Licensee Activities on Extended day-shift Basis During Reporting Period ML20247C0631989-07-19019 July 1989 Forwards Biweekly Status Rept for 890701-14.NRC Restart Staff in Place & Onsite & Monitoring Licensee Activities on around-the-clock Basis During Plant Startup & Power Ascension.Part 21 Related ML20247C1611989-07-14014 July 1989 Notification of Significant Licensee Meeting 89-112 W/Util on 890816 in King of Prussia,Pa to Discuss SALP ML20247E4531989-07-10010 July 1989 Forwards Plant Status Rept for 890617-30 Period.Rept Intended to Provide NRC Mgt & Public W/Overview of Plant Activities & NRC Restart Insp Activities ML20246K1141989-07-0303 July 1989 Notification of Significant Licensee Meeting 89-105/suppl Enforcement Conference Re Augmented Insp Team Findings Concerning 890412 Reactor Core Isolation Cooling Sys Overpressurization ML20245E6561989-06-22022 June 1989 Forwards Plant Biweekly Status Rept for 890603-16.On 890616, Reactor Operating at Approx 25% Power w/turbine-generator Synchronized to Grid.On 890612,util Commenced Controlled Reactor Shutdown to Perform Minor Mods,Maint & Testing ML20245F9581989-06-16016 June 1989 Notification of Significant Licensee Meeting 89-096 W/Util on 890619 in King of Prussia,Pa Re 890412 RCIC Sys ML20245A3311989-06-0909 June 1989 Notification of Significant Licensee Meeting 89-90 on 890627 W/Util in King of Prussia,Pa for Mgt Meeting to Discuss Status of Licensee Radiation Control Program ML20244E5081989-06-0707 June 1989 Forwards Biweekly Status Rept for 890520-0602.Rept Provides Overview of Plant Activities & NRC Restart Insp Activities. Part 21 Related 1999-08-18
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20211A4361999-08-18018 August 1999 Notification of Significant Licensee Meeting 99-47 with Entergy Nuclear,Inc on 990831 to Discuss Results of NRC Plant Performance Review of Pilgrim Nuclear Power Station Issued on 990409 ML20212H7621999-06-22022 June 1999 Notification of 990701 Meeting with NEI & Entergy in Rockville,Md to Discuss Price-Anderson Issues Re Transfer of Pilgrim License from Beco to Entergy ML20205L0301999-04-0909 April 1999 Notification of 990413 Meeting with Boston Edison Co & Entergy Nuclear Generation Co in Rockville,Md to Discuss Sale & Transfer of Pilgrim Station from Boston Edison Co to Entergy Nuclear Generation Co ML20196J5801998-12-0707 December 1998 Notification of 981209 Meeting with Representatives of Beco & Entergy in Rockville,Md to Discuss Sale of Pilgrim Plant ML20196F3461998-12-0202 December 1998 Forwards Info Re Operator Licensing Exam Administered on 981016-23 at Pilgrim Station,For Distribution Under Rids Code IE42 ML20196F5611998-12-0202 December 1998 Forwards Info Re OL Exam Administered on 981016-23 at Pilgrim Station,For Distribution Under Rids A070 ML20154G5141998-10-0202 October 1998 Notification of 981008 Meeting W/Beco in Rockville,Md to Discuss Core Spray Piping Integrity.Meeting Has Been Rescheduled to 981015 ML20154D5091998-10-0202 October 1998 Notification of Meeting W/Beco on 981008 in Rockville,Md to Discuss Core Spray Piping Integrity ML20247G2441998-04-15015 April 1998 Notification of Significant Licensee Meeting 98-34 W/Util on 980427 to Discuss Weaknesses in Licensee Alarm Assessment Program (EA 98-191) ML20203E2781998-02-19019 February 1998 Notification of Significant Licensee Meeting 98-18 W/Util in King of Prussia,Pa on 980310 Re Plant Design Basis Project Discussion ML20199C7581997-10-31031 October 1997 Notification of Significant Licensee Meeting 97-112 W/Util on 971113 to Discuss NRC SALP ML20212D6201997-10-28028 October 1997 Notification of Licensee Meeting on 971121 W/Util in King of Prussia,Pa to Discuss Apparent Violations Identified During NRC Insp 50-293/97-05 ML20140F6151997-06-11011 June 1997 Notification of 970612 Meeting W/Util in Rockville,Md to Discuss Net Positive Suction Head for ECCS Pumps ML20137Q9761997-03-31031 March 1997 Informs That as-found LOCA & Life Testing & Analysis Does Not Provide Acceptable Approach for Demonstrating Qualification at Accident Temp Higher than 340F,per 970110 TAR ML20137B4781997-03-14014 March 1997 Undated Memo Discussing Beco Reorganization ML20141A7361997-03-12012 March 1997 Rcommends That Key RES Staff Attend Subcommittee Meetings to Address Any Questions,Arise in Discussions Among Members & to Answer Any Key Questions Posed in Advance by Subcommittee Chairmen ML20149M3291996-11-12012 November 1996 Forwards Input Re TIA on Plant Licensing Basis & Subsequent Mod Under 10CFR50.59 for Two Safety Significant Problems ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20129D8331996-09-19019 September 1996 Notification of 961003 Predecisional Enforcement Conference 96-98 W/Util to Discuss Containment Penetration Protection. Meeting Closed to Public ML20134J7301996-07-26026 July 1996 Forwards Resolution of Spent Fuel Storage Pool Action Plan Issues Re Response to Two Postulated Event Sequences Involving SFP NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl IR 05000293/19930291993-11-23023 November 1993 Notification of Significant Licensee Meeting 93-156 W/Util on 931202 Re Three Recently Reported Design Issues in Insp Rept 50-293/93-29 ML20058C9711993-11-22022 November 1993 Notification of Significant Licensee Meeting 93-150 W/Util on 931217 Re Hpci/Rcic Reliability & Switchyard Betterment Status ML20059L9721993-11-12012 November 1993 Licensing Board Memorandum & Order Terminating Proceeding .* Informs That Time Provided by NRC Regulation to Review Decision of ASLB Terminating Proceeding in Docket Has Expired.W/Certificate of Svc.Served on 931112 ML20056C4721993-06-17017 June 1993 Discusses Util Assessment of Low Pressure Turbine Analysis. Licensee Retained Structural Integrity Assocs,Inc (SIA) to Evaluate Flaw Indications in 7GA Disk.Sia Anaylsis Reduce Some Obvious Conservatisms Used in GE Analysis ML20128F3911993-02-0303 February 1993 Requests Listed Instructions to Ensure That P Blanch of Northeast Utils & E Hadley of We the People Kept Promptly Informed of NRC Activities on BWR Water Level Indicators & Rosemount Transmitters ML20128E2181993-01-26026 January 1993 Notice of Significant Licensee Meeting 93-11 W/Licensee on 930225 in King of Prussia,Pa to Discuss Util Reorganization ML20059C1171992-11-20020 November 1992 Submits Status Rept on Reactor Water Level Spiking That Occurred on 921024.Related Info Encl ML20125D1161992-10-0707 October 1992 Notification of Significant Licensee Meeting 92-177 W/Util on 921217 to Discuss tie-in of New Security Computer ML20082B1581991-02-20020 February 1991 Summarizes Telcon W/R Murphy Re Mobilization Time for State of Ma Natl Guard Personnel Assigned to Respond to Wellesley, Ma Reception Ctr & State of Ma Civil Defense Agency Area II Headquarters in Event of Emergency at Facility ML20062H5361990-11-23023 November 1990 Forwards Info from Pilgrim Citizens Radiological Monitoring Network,Covering Rept Periods 900910-1017 ML20059P0861990-10-0101 October 1990 Notification of Significant Licensee Meeting 90-118 W/Util on 901016 to Discuss SALP ML20059L1541990-09-0707 September 1990 Notification of Significant Licensee Meeting 90-114 on 900912 at Region I Ofc to Discuss Corrective Actions & Restart Planning Re 900902 Manual Reactor Scram ML20059G4681990-08-0606 August 1990 Forwards Citizens Radiological Monitoring Network Weather Data Rept for Apr-Jul 1990 for Processing Through Nudocs Sys ML20127B4901990-08-0303 August 1990 Responds to 900726 Request for Recommendations for Appropriate Actions in Response to Inspector General Rept 90N-02 ML20127B4961990-08-0101 August 1990 Advises That Staff Did Not Conduct Thorough Review of Offsite Emergency Preparedness Which Resulted in Inaccurate Info Being Provided to Commission ML20058B4501990-06-28028 June 1990 Provides Status Rept Re Progress of off-site Emergency Preparedness Activities at Facility ML20055C2661990-02-0505 February 1990 Forwards Draft Ltr to Util Re Completion of Plant Power Ascension Program.Ltr Will Be Issued on 900209 Which Will Accept Util Completion of Power Ascension Program & Close Out Confirmatory Action Ltr CAL-86-10 ML20248C5841989-09-26026 September 1989 Notification of Significant Licensee Meeting 89-154 W/Util on 891006 in Plymouth,Ma to Discuss SALP Mgt ML20247N0121989-09-12012 September 1989 Forwards Plant Status Rept for 890826-0908.On 890830,reactor Automatically Scrammed Due to Fault on Main Generator Voltage Regulation Circuitry.On 890905,inadvertent Actuation LPCI Loop Select Logic Experienced ML20246N5751989-08-30030 August 1989 Forwards Plant Biweekly Status Rept for 890812-25 ML20245F6401989-08-0101 August 1989 Forwards Facility Biweekly Status Rept for 890715-28.NRC Restart Staff in Place & Onsite Monitoring Licensee Activities on Extended day-shift Basis During Reporting Period ML20247C0631989-07-19019 July 1989 Forwards Biweekly Status Rept for 890701-14.NRC Restart Staff in Place & Onsite & Monitoring Licensee Activities on around-the-clock Basis During Plant Startup & Power Ascension.Part 21 Related ML20247C1611989-07-14014 July 1989 Notification of Significant Licensee Meeting 89-112 W/Util on 890816 in King of Prussia,Pa to Discuss SALP ML20247E4531989-07-10010 July 1989 Forwards Plant Status Rept for 890617-30 Period.Rept Intended to Provide NRC Mgt & Public W/Overview of Plant Activities & NRC Restart Insp Activities ML20246K1141989-07-0303 July 1989 Notification of Significant Licensee Meeting 89-105/suppl Enforcement Conference Re Augmented Insp Team Findings Concerning 890412 Reactor Core Isolation Cooling Sys Overpressurization ML20245E6561989-06-22022 June 1989 Forwards Plant Biweekly Status Rept for 890603-16.On 890616, Reactor Operating at Approx 25% Power w/turbine-generator Synchronized to Grid.On 890612,util Commenced Controlled Reactor Shutdown to Perform Minor Mods,Maint & Testing ML20245F9581989-06-16016 June 1989 Notification of Significant Licensee Meeting 89-096 W/Util on 890619 in King of Prussia,Pa Re 890412 RCIC Sys ML20245A3311989-06-0909 June 1989 Notification of Significant Licensee Meeting 89-90 on 890627 W/Util in King of Prussia,Pa for Mgt Meeting to Discuss Status of Licensee Radiation Control Program ML20244E5081989-06-0707 June 1989 Forwards Biweekly Status Rept for 890520-0602.Rept Provides Overview of Plant Activities & NRC Restart Insp Activities. Part 21 Related 1999-08-18
[Table view] |
Text
. _ _ _ _ _ - _ _ -
l APR 121989 Docket No.-50-293 MEMORANDUM FOR: James T. Wiggins, Chief Reactor Projects Branch No. 3 Division of Reactor Projects FROM: A. Randy Blough, Chief Reactor Projects Section No. 3B Division of Reactor Projects
SUBJECT:
PILGRIM STATUS REPORT FOR THE PERIOD MARCH 25 - APRIL 7, 1989 Enclosed 'is the Filgrim bi-weekly status report from the NRC Resident Office -
at Pilgrim. The NRC Restart Staff is in place and was on-site monitoring licensee activities on an extended shift basis during power ascension testing and following completion. of the licensee's power ascension testing program up through the 25% power plateau.
Mr. William T. Russell, Region I, Regional Administrator, was on site on April 3,1989, to attend the NRC Restart Assessment Panel Meeting and to receive a presentation from licensee management on the results of the Power Ascension' Program to date.
The Pilgrim bi-weekly status report is intended to provide NRC management and the public with an overview of plant activities and NRC restart inspection activities. Subsequent inspection reports will address many of these topics in more detail.
/
Original Sigred by A. Randy Blough A. Randy Blough, Chief Reactor Projects Section No. 3B Enclosure- i As stated l
0FFICIAL RECORD COPY PILGRIM STATUS 3/25-4/7/89 - 0001.0.0 } i 04/10/89 i 8904190213 890412 PDR
'Og ' jb 9 R ADDCK 05000293 bd PDC
f$ . ..
T '4 ,;: 1
- 'MemorandumLfor James!T.LWiggins'. '2 m APR 121989:
cc'w/ enc 1:
H R. Bird, Senior Vice President..- Nuclear-L. Gustin, Vi.ce President - Corporate Relation's K. Highfill,. Station Di'ector E R. Anderson, Plant-Manager
. J.' Keyes, Licensing; Division . Manager E. Robins'on, Nuclear Information~ Manager R. Swanson, Nuclear Engineering' Department Manager-The Honorable Edward M. Kennedy
.The-Honorable Edward J. Markey-The Honorable Edward P. Kirby EThe. Honorable Peter V. Forman Chairman, Board ofl Selectmen, Plymouth Chairman,.' Board of Selectmen,. Carver
- Chairman, Board of. Selectmen, Duxbury 4 Chairman, Board of Selectmen, Marshfield-Chairman, Board of Selectmen, Kingston
- Chairman, Board of Selectmen, Bridgewater Mayor, City of Taunton.
Plymouth Civil. Defense Director.
P.. Agnes, Assistant Secretary of Public Safety, Commonwealth of. Massachusetts M. Ernst, Committee on Energy, Commonwealth of Massachusetts S. Pollard, Massachusetts' Secretary of Energy Resources B. McIntyre, Chairman, Department of Public Utilities
~ M. Johnson, Chairman, Duxbury Nuclear Committee R. Shimshak, MASSPIRG R.Boulay, Director, Massachusetts Civil Defense Agency and Office of Emergency Preparedness
- M. Conyngham, Legislative. Assistant M.~Jeka,. Legislative Assistant K. Anderson, Legislative Assistant Public Document Room (PDR).
Local _Public Document Room.(LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector Commonwealth of Massachusetts (2) f 0FFICIAL RECORD COPY PILGRIM STATUS 3/25-4/7/89 - 0002.0.0 04/10/89
_n_-_--_ ---,-----------_-_--------___.--._------------a _
u_ , :,2 yu i' L '
g j1 :. . 7 ,
'Mi >
b <
Memorandum for. James T..' Wiggins -3 "APR 121989:
bec w/ enc 1:
, . Region..I Docket Room (with-concurrences).
J.1 Taylor, EDO p.' B. Clayton,.EDO-
- T. Murle,, NRR
, F. fliraglia, NRR l '
J. Partlow, NRR
- 3. Varga, NRR~
. B. : Boger, NRR' J.' Roe, NPR K. Perkins, NRR .
.D 'Crutchfield, NRR J. Partlow, NRR C. Rossi, NRR F. Congel, NRR L. Shao,-NRR
.R. Wessman,-NRR D. Mcdonald,~NRR E. .Trottier, NRR L.iWhitney,.NRR P. Bo'hnert,'
e ACRS W. Russell, RI W. Kane, RI
-T. Martin,-RI-M. Knapp, RI.
'S. Collins,'RI.
J 'Durr, RI.
.R. Blough, RI' J. Lyash,-RI
.M. Kohl, RI:
+ J. Johnson, RI E. McCabe, RI.
.R..Gallo, RI-
'J. Strosnider, RI
~
N. Blumberg,~RI R. Conte, RI M. Evans, RI R. Bellamy, RI W. Lazarus, RI M. J. DiDonato, RI (2)
M. Miller, RI K.' Abraham,-RI (2) !
C. Warren, SRI - Pilgrim T. Kim, RI - Pi'igrim l C. Carpenter, RI - Pilgrim j
OFFICIAL RECORD COPY PILGRIM STATUS 3/25-4/7/89 - 0003.0.0 04/10/89
4 Memorandum for James T. Wiggins 4 APR 121989 (ARI:DRP CWarren/mjd RI:DRP RBlough I:DRP Wiggins 4// / /89 4////89 4/ll/89 0FFICIAL RECORD COPY PILGRIM STATUS 3/25-4/7/89 - 0004.0.0 i
04/10/89 I
w _ _ -_ _ . __ l
ENCLOSURE Pilgrim Status Report for the Period March 24 - April 7, 1989 I 1.0 Plant Status.
As of 8:00 a.m. , on April 7,'1989, the reactor was operating at approxi-mately 24% power with the turbine generator synchronized to the grid.
2.0 Power Ascension Test Program Status The licensee completed the Power Ascension Test Program through the 25%
power plateau on April 3, 1989. Testing completed during this report period included the high pressure coolant injection (HPCI) and the reactor core isolation cooling (RCIC) system cold quick start tests.
Prior to continuation of the power ascension program to the 50% power plateau, the licensee must obtain the NRC Region I Regional Administra-tor's agreement. The Power Ascension Program includes NRC approval points at 5%, 25%, 50% and 75% of full power and both a licensee written report and NRC review after completion of testing at full power. The NRC Restart Assessment Panel recommends to the Regional Administrator when the plant l is ready to proceed beyond each approval point.
Contingent upon NRC release for operation up to 50% power, the licensee will continue implementation of their approved test program. The follow-ing testing activities are scheduled for this next phase: reactor engi-neering tests, and shutdown from outside the control room test including the hot standby demonstration and the shutdown cooling demonstration.
3.0 Facilities Operations Summary As reported in the last Pilgrim Status Report (March 11-24,1989), the plant was operating at approximately 24% power at the beginning of this report period.
On March 31 and April 3,1989, the licensee successfully completed the HPCI and RCIC system cold quick start tests, therefore completing the j planned testing activities for the 25% power plateau. On April 3,1989, '
the licensee formally requested NRC approval to proceed with power ascen-sion from 25% to 50% power. The plant continued to operate at approxi-mately 24% power throughout the report period while awaiting NRC agreement to proceed.
Throughout the period, the licensee continued to conduct routine surveillance along with preventive and corrective maintenance.
OFFICIAL RECORD COPY PILGRIM STATUS 3/25-4/7/89 - 0005.0.0 04/10/89
____________m.
?,,
4 l Enclosure. 2.
'i!
'4.0 Items of Special Interest
.NRC Restart Assessment Panel-Meeting An NRC; Restart Assessment Panel ' Meeting was held on April 3,1989, at Pilgrim Station. NRC management from Region I;and Headquarters were on-site 'for the meeting and additional' Region'I' and Headquarters ' staff par-ticipated via - teleconference. TheLassessment panel received a ' presenta '
' tion from the licensee on.their assessment of the results of the 5% to'25%
Power Ascension Program. The Restart Panel; also as'sessed the licensee's performance during Power' Ascension Test Program activities through 25%
power and reviewed plant readiness to proceed up .to 50% power. The NRC -
Restart Assessment Panel meets periodically to coordinate planning and execution' of NRC inspection and licensing activities related to Pilgrim.
The Panel is chaired. by Mr. Samuel J. Collins, Deputy Director, Division -
of Reactor Projects, Region I.
Institute of Nuclear Power Operations Site Visit The Institute of Nuclear Power Operations (INPO) is-an organization com-posed of, and supported by, electric utilities' utilizing nuclear power for
- the generation of electrical energy. -INPO assists utilities in improving programs and performance at their nuclear facilities. During the week of March 27,1989, an INP0 operations evaluation team was on' site at Pilgrim for a routine inspection visit, covering the areas. of plant operations and chemistry. The licensee characterized the results of this visit as
~;
favorable.
Unannounced Emergency Response Facility Augmentation Exercise On March 29, 1989, the licensee conducted an unannounced. emergency response ~ facility augmentation exercise. The primary objective of the exercise was to determine the activation times for the Technical Support Center (TSC), ' Operations -Support Center (OSC), and Emergency ' Operations Facility (EOF). No significant problems were identified by the 1.icensee.
5.0 Emergency Notification System (ENS) Reports High Pressure Coolant Injection System Valve Failure On March 24, 1989, the high pressure coolant injection (HPCI) system failed a monthly surveillance test when the HPCI turbine steam admission
. valve failed to open on demand. The licensee subsequently repaired the valve and returned the HPCI system to operable status within the outage time allowed by Technical Specifications, 0FFICIAL RECORD COPY PILGRIM STATUS 3/25-4/7/89 - 0006.0.0 1 04/11/89 '
_ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ . _ _ l
- Encl o~sure 3 d
a Breach'of Secondary Containment-On Ap ril ' 1, 1989, and again on Apri.l 4,1989, an inadvertent breach of -
secondary containment' occurred when both the inner and z outer ~ reactor building access doors were opened simultaneously ~ for about 3 seconds, due
- to an interlock failure. The licensee has taken corrective action to pre-vent reoccurrence 'and to repair. the ma. functioning door. interlock. _The1 licensee is investigating the root cause of the repeat failure.
Detailed NRC review. of the events described above will be documented in Inspection Report.No.-50-293/89-05.
6.0 Pilgrim Restart Staff Activities The Pilgrim restart staff discontinued around-the-clock shift coverage on March 24, .1989,. at 10:00 p.m., consistent with reduced testing activity.
The restart staff was maintained on extended shift coverage throughout the report period. - Additional personnel from NRC Region I, NRC Region II, and
-an NRC contractor.were onsite during portions of the period to augment the resident inspection staff.
An NRC-developed inspection plan addressing the 5-25's power plateau and.
the primary functional areas of operations, maintenance, surveillance, and
- startup testing continued -to be implemented. The inspection plan assessed operator performance, organizational interfaces, adherence to procedures
.and technical specification compliance. Inspections in the areas - of radiological protection and training were also performed.
The Pilgrim Restart Staff continued to evaluate the performance cf licen-see. personnel and the plant to independently assess whether the licensee was ready to proceed to the 50's power NRC approval point.
Contact with the press and public continued throughout the period. The NRC Restart Manager has been handling inquiries from the press and the public with the assistance of the Region I Public Affairs Officer.
Pilgrim Restart Staff Composition During Period The Pilgrim Restart Staff on-site was comprised of the following personnel during the period.
C. Warren, Senior Resident Insoector and Restart Manager T. Kim, Resident Inspector M. Evans, Acting Resident Inspector G. Bryan, NRC Contractor A. Howe, Senior Operations Engineer N. Conicella, Operations Engineer T. Dragoun, Senior Radiation Specialist R. Starkey, Senior Operations Engineer, RII 0FFICIAL RECORD COPY PILGRIM STATUS 3/25-4/7/89 - 0007.0.0 04/10/89
s.
Enclosure 4 Also on site on April 3, 1989, were Mr. William Russell, Regional Administrator, and the Restart Assessment Panel members:
Mr. Samael Collins, Deputy Director, Division of Reactor Projects; Mr. Jarres Wiggins, Chief, Reactor Projects Branch No. 3; Mr. Randy Blough, Chief, Reactor Projects Section No. 3B; Mr. Jacque Durr, Chief, Engineering Branch; Dr. Ronald Bellamy, Chief, Facilities Radiological Safety and Safeguards Branch, and Mr. Daniel Mcdonald, Licensing Project Manager.
l OFFICIAL RECORD COPY PILGRIM STATUS 3/25-4/7/89 - 0008.0.0 04/10/E9
_ _ _ _ _ _ _ - _ _ _ _ - _ - _ _ _ _ _ _ _ _ . _ _ _ _ _ .