Text
- _ _
f.
\\; 72 West Adams Street, Chicago, Illinois '-
Comm nwkith Edison
.l
% j".'J
(.., 4 l-wM '
p
\\
/ 'Addrtss Reply to: Post Offica Box 767 v
\\ d. Chicago, Illinois 60690 - 0767
?<
L
~ April 3, 1989-
~
L Dr. Thomas.E. Murley, Director Office of Nuclear. Reactor Regulation i-
..U.S. Nuclear Regulatory Commission-
. Washington, DC. 20555 l
Subjects-Dresden Station Units 2 and 3 Quad Cities Station Units 1 and 2 Request for Additional Information on Generic ~ Letter 83-28 NRC Docket Nos. 50-237/249 and 50-254/265 References (a): Generic Letter 83-28, D.G. Eisenhut letter to All OLs and cps dated July 8, 1983.
(b):
P.L. Barner letter to H.'R.
Denton dated
~
November 5, 1983.
(c):
P.L. Barnes letter to H.R. Denton dated February 29, 1984 Dr. Murleys-Reference (a) requested that. Commonwealth Edison provide a written p
report of.the status of conformance with the positions contained in the subject letter.
References (b) and (c) provided the information.
On February 1, 1989, a teleconference was held between members of the NRC and Commonwealth Edison staffs. During the course of the meeting, the NRC Staff members requested additional clarification to Items 2.2.1.3, Use of Information Handling System and 2.2.1.4, Management Control. The attachment to this letter should address the issues discussed during the meeting.
1
- 1 g41BOlyog90403
- p' ADOCK 05000237 PNU;
-]
e m:
+
+.
q'f
.,[I r
.)
'.. o,; -
m
.:?J l
2.-
. April'4,fl989 JT.E6 Murley' Please. direct'any questions concerning this~ subject.to this office.
a very.truly yours, g1/fAlvb.
A Y
R. Stols Nuclear Licensing Administrator
.1m.
Attachment cc
.A.B.
Davis -. Regional Administrator, RIII D. Mueller - NRR T.M. Ross TProject Manager, NRR B.M. Siegel - Project Manager, NRR Senior Resident Inspectors - Dresden/ Quad Cities i
l I
~!
5604k
s ATTAQRENT l
l IIEM 2.2.1.3:
UEE OF INFORMATION HANDLING SYSTEM CECO's Corporate Quality Assurance (QA) Manual, as well as station Administrative Procedures, provide guidance to' station personnel on initiating.
and completing work requests.
For plant modification requests originating from within the station, the Station Assistant Superintendent for Operations or an Operating Engineer is required to designate the safety classification of the involved work activities.
For all modification requests, the Technical Staff Supervisor is responsible to verify the work activity / equipment classifi-cation on the basis of the Master Equipment List / Safety-Related Classification List (MEL/SRCL). The MEL/SRCL is generated and controlled by the Bolling Water Reactor Engineering Dopartment (BWRED).
For plant maintenance activities, the Assistant Superintendent for Operations or an Operating Engineer is required to reference the MEL/SRCL in order to classify the work request.
Once the work request has been classified, safety-related activities are addressed through the implementation of applicable sections of the QA program, as well as station specific Administrative Procedures. These procedures require that the Assistant Superintendent for Operations, the Assistant Superintendent for Maintenance, Technical Staff Supervisor, Master Mechanic, Master Electrician or Master Instrument Mechanic, as appropriate, i
reference the MEL/SRCL to classify procurement requests and to apply the i
controls described in the Quality Procedures for Operation to safety-related structures, systems and components, as well as the parts and materials for these components.
l Per the QA Procedures, for safety-related modification / maintenance-activities, the Quality Control Supervisor is responsible for verifying that i
the quality requirements for the work, equipment, parts and material are acceptable, and that the desired hold and witness points are identified in the work package. The Quality Assurance Superintendent is responsible for auditing the work package prior to authorizing the work to proceed. When the work package is complete, the Quality Control Supervisor and the Station Quality Assurance Superintendent are required to review that all activities described in the modification / maintenance work package have been completed per the specified requirements.
ITEM 2.L lu4: MAliAGEMEliT_ CONTROL The responsibility for the preparation, validation, maintenance and periodic distribution of the Master Equipment List / Safety-Related Classification List (MEL/SRCL) is assigned to the Bolling Water Reactor Engineering Department (BWRED).
The implementation of these responsibilities is governed by the Engineering Department's procedures. The BWRED Manager has l
the ultimate responsibility for the classification of structures, systems and l
I l
_______1-i
l l
'I
...j w
__;* ~
p;;.Fu o:x.
(.y 9;
~ i.
9,
, s?
' 1 er l
.s s
1 gy '
M' sq.'
l
._.f )
'n;
..i.
Q i
@f Yy The Project Engineer is responsible ?7 o initiate the classifica-components, t
[/
tion process for plant modifications designed by BWBED and on requests for (p) classification from station personnel. The classification process is conducted 9%{
.hy,a cogn12 ant:BWEED Engineer. The cognizant engineer either classifies the
'jf structurosi, systems or components, inaccordancewith\\ unestablished
- p, classification criterie which is based on the interpretation of applicable dh requirements, standards, guides and codes, or solicits ' assistance from an
, j, Architech/ Engineer or consultant to perform the classification. The C /1 classification is reviewed and approved by the Project Engineer prior to i/d entering this information into the MEL/SRCL.
- c
- ;(f The BWRED Procedure establishes the method for controlling entries to "10 the MEL/SRCL.
A SRCL Engineer is required to review all updates to MEL/SRCL cg(; '
for completeness and thchnical validity through a manual review / verification.
l+k fp The SRCL Engineer, implements administrative contr 1 on the j,l distribution of the SRCL to the recipients through the receipt acknowledgement j
']
philosophy via a distribution list for controlled MEL/SRCL copy.
The Engineer i
is required to maintain a' file on MEL/SRCL.
o tg Vario'us administrative controls are employed by BWRED to ensure the accuracy of the MEL/SRCL. Corporate QA and/or station specific procedures.
~ require that responsible station personnel reference the MEL/SRCL as a source
/ document in' determining classification of work activities and equipment.