Special Rept:On 890309,diesel Fire Pump Declared Inoperable as Result of Failure to Automatically Shut.Caused by Failure of Solenoid Valve Controlling Inlet Flow to Hydraulic Governor Device.Redundant Fire Water Supply Provided
ML20244A660
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 04/06/1989
From: Miller D
CONNECTICUT YANKEE ATOMIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8904180121
Download: ML20244A660 (2)


Text

_ _ --

j

. . .v l t'

i i

CONNECTICUT YANKEE ATOMIC POWER COMPANY HADDAM NECK PLANT RR#1

  • BOX 127E
  • EAST HAMPTON. CT 06424-9341 l

April 6,1989 Docket No. 50-213 -

U.S. Nuclear Regulatory Commission Attn: Document Contml Desk Washington D.C.,20555 Gentlemen:

Haddam Neck Plant Fire Suppression Water Systems Inonerable Diesel Fire Pumn In accordance with the Special Reporting requirements of Technical Specification 3.22.A.2 Fire Suppression Water Systems; Connecticut Yank.ee Atomic Power Company (CYAPCo)is providing the NRC staff with the following information.

On March 9,1989, the diesel fire pump was declared inoperable as a result of a failure to automatically start. This was noted during the performance of an Operations Department surveillance procedure and subsequent troubleshooting evaluation. The problem was found to be the failure of a solenoid valve conuolling inlet flow to the hydraulic governor device.

This solenoid is required to open on a start signal from the engine controller to allow engine lubrication fluid to flow into the hydraulic governor which then positions the engine fuel rack to a start position.

This report is being submitted pursuant to the requirements of Technical Specification 6.9.2 since the fire pump had been declared inoperable for longer than seven (7) days.

The delay in restoring the fire pump to service was due to the unavailability of original manufacturers parts and the lack of suitable documentation to qualify a replacement. A preliminary engineering review specified a replacement solenoid which was installed, correcting the starting problem. However, the unit remained classified as inopemble while the replacement valve was being verified as meeting the original design functional requirements.

During this period, the electric fire pump remained in service.

Although the diesel fire pump was declared inoperable per the requirements of this Technical Specification, the unit remained on-line in an automatic operating mode following installation of the replacement solenoid. Fire water supply redundancy was provided by the operable electric driven fire pump..

8904180121 890406 PDR S

ADDCK 05000213 Ski i l

PNU 1028-3 R EV.10-87

'. . .p

o. "

The engineering review of the replacement solenoid has been' completed and the diesel fire pump _was declared operable on April 5,1989.

. The licensee contact for this Special Report is Tom Kazukynas, who may be contacted at

-(203) 267-2556, Ext. 454.

Very Truly Yours,

' Connecticut Yankee Atomic Power Company b

c DM3. Miller, Jr. i NkI' f k

Station Superintendent /'

DBM/ nib cc: W. T. Russell, Region I Administrator .

A. Wang, NRC Project Manager, Haddam Neck T. Shediosky, Senior Resident Inspector, Haddam Neck l