ML20239A600

From kanterella
Jump to navigation Jump to search
Forwards Best Estimate of Need for Operating Licensing Exams & Requalification Schedules for FY88-91,per 870804 Request
ML20239A600
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 09/15/1987
From: Mcdonald R
ALABAMA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
GL-87-14, NUDOCS 8709170513
Download: ML20239A600 (3)


Text

. _ _ _ _ _ _ _ _ _ _ _ _ _ -

Alabama Power Company 600 North 18th Street Post Office Box 2641 Birmingham, Alabama 352910400 Telephone 205 250-1835 L

kn"Jfce";Leni Alabama Power the sou h rn r

tem September 15, 1987 Docket Nos. 50-348 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:

Joseph M. Farley Nuclear Plant - Units 1 and 2 Operator Licensing Examinations (Generic Letter 87-14)

By letter of August 4,1987, the U. S. Nuclear Regulatory Commission requested Alabama Power Company's best estimate of its need for operator licensing examinations for fiscal years 1988 through 1991.

In addition, requalification schedules for the same periods were requested.

Enclosures 1 and 2 to this letter provide the requested information.

Respectf

ubmitted, s

V

]o

'bhj R. P. Mcdonald

\\

RPM /J AR:mhf-D:15 Enclosures cc:

Mr. L. B. Long Dr. J. N. Grace Mr. E. A. Reeves Mr. W. H. Bradford Mr. J. Hannon 4%

B709170513 870915" C

i PDR ADOCK 05000348

/

/j V

PDR

\\

j OPERATOR LICENSING EXAMINATION SCHEDULE 1

Facility farley NRC Region II FY 1988 FY 1989 FY 1990 FY 1991 1.

Date 10-17-88 12-4-89 2-18-91 (HLC-15)

(HLC-16)

(HLC-17)

  1. R0 6

6 6

  1. SRO 8

8 8

  1. SRO Upgrade 4

4 4

1 eSR0 Limited l

2.

Date i

l WR0 l

l I

  1. SR0 l
  1. SRO Upgrade
  1. SR0 Limited 1

)

3.

Date l

  1. RO I

l

  1. SR0 l

\\

l

  1. SRO Upgrade
  1. SRO Limited 1

Please indicate initial cold license examinations by placing an asterisk (*)

by the date.

Please indicate examinations intended to extend an operator's license to a second or subsequent unit with two asterisks (**) (e.g., Unit One is in operation and Unit Two is approaching fuel load. Three R0 candidates with no previous license are to be examined on both Units One and Two and five R0 candidates licensed on Unit One are to be examined to extend their licenses to Unit Two.

Indicate (2/15/88, RO 3,5**)).

l l

,n REQUALIFICATION EXAMINATION SCHEDULE Facili ty Farley NRC Region II FY 1988 FY 1989 FY 1990 FY 1991 1.

Date 5-23-88 Date 5-29-89 Date 5-28-90 Date 5-27-91 2.

Date 5-30-88 Date 6-5-89 Date 6-4-90 Date 6-3-91 3.

Date 6-6-88 Date 6-12-89 Date 6-11-90 Date 6-10-91 4.

Date 6-13-88 Date 6-19-89 Date 6-18-90 Date 6-17-91 l

S.

Date 6-20-88 Date 6-26-89 Date 6-25-90 Date 6-24-91 l

l l

1

.__-_-____ - - -