ML20239A313

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Aug 1987
ML20239A313
Person / Time
Site: Crane Constellation icon.png
Issue date: 08/31/1987
From: Hukill H, Smyth C
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
5211-87-2173, NUDOCS 8709170260
Download: ML20239A313 (8)


Text

'

I ~ '

j OPERATING DATA REPORT l

t l

l DOCKET NO.

50-289 l

DATE 8-31-87 l

COMPLETED BY C.W. Smyth TELEPHONE (717) 948-8551 OPERATING STATUS l

NOTES

1. UNIT NAME:

THREE MILE ISLAND UNIT 1

2. REPORTING PERIOD:

AUGUST

,1987.

3. LICENSED THERMAL POWER (MWT) :

2535.

4. NAMEPLATE RATING (GROSS MWE):

871.

5. DESIGN ELECTRICAL RATING (NET MWE) :

819.

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) :

824.

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE) :

776.

8. IF CHANGES OCCUR IN (ITEMS 3-7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

l THI6 MONTH YR-TO-DATE CUMMULATIVE

11. HOURS IN REPORTING PERIOD 744.

5831.

113928.

12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 3517.2 43602.7
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1874.9
14. HOURS GENERATOR ON-LINE 744.0 3443.4 42689.6
15. UNIT RESERVE SHUTJOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1879956.
8221918, 103149179.
17. GROSS ELECTRICAL ENERGY GENERATED (.MWH )

633597.

2821484.

34340355.

18. NET ELECTRICAL ENERGY GENERATED (MWH) 598926.

2644568.

32114543.

19. UNIT SERVICE FACTOR 100.0 59.1 37.5 J
20. UNIT AVAILABILITY FACTOR 100.0 59.1 37.5 l
21. UNIT CAPACITY FACTOR (USING MDC NET) 103.7 58.4 36.1
22. UNIT CAPACITY FACTOR (USING DER NET) 98.3 55.4 34.4
23. UNIT FORCED OUTAGE RATE 0.0 9.3 58.3
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH
25. If SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

{

8709170260 870831 PDR ADOCK 05000289-R PDR

l 9

AVERAGE DAILY UNIT POWER LEVEL j

DCCKET PO.

50-289 j

E 'T TMI-1 i

D) oE 8-31-87 COMPLETED iY C.W. Smyth TELEPi>NE (717) 948-8551

)

1 MONTH:

AUGUST I

I DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)

(MWE-NET) 1 802.

17 793.

2 797.

18 794.

3 793.

19 801.

i 4

795.

20 804.

5 801.

21 811.

6 806.

22 804.

7 807.

23 813.

I

]

8

798, 24 819.

9 797.

25 820.

l 10 798.

26 817.

11 804.

27 811.

12

808, 28
812, 13 809.

29 809.

14 809.

30 815.

15 800.

31 812.

l 16 799.

i f

.]

l l

l 1

I i

l

5 E

- 8 R

h -

t8 U

y4 N

7 m9 e

t e

8S e

9 s

s li

)

a 8I nt nF 1

7 oa e I 2 - 3W1 it DiR c

- I c

L 7

uf E

0N 8C(

e e

r orL 5T i

n ts nfI v

c o

O.EEYE e orr Ino t

tc e

is r t

o r

- ta e MTBN r t u

ep N

r Gah A A D O on c e

e pSR -

T N D E H Co it iR e

c t

b r yt E

)

K T T P

&t ipr n1 E

e6 E

C N L L eAn h

tnv1 I

s e

xr O U P E u

v EfEE0 o

D M T a

e r

C P

O 4

C S

N m l O

.a m

r mc D

gU aSl "c.E' a

C r

p e

cii U

St D

l l uit a a n E

T d uu oe r

R S

o nnt h R

U h a a ut G

r.?G te M M A. O E

U

,. -gun W

A t

M1 234 O

P D

H S

~3 N

T N

A N

W e

a O

O S

D N

M e

t t

nr T

s W

T n e o U

e v p H

O R

.ic E e D

O L

R S

I P

U E

O R

N l

i S

T U

9

n. n'45 g6

)

I N

sgg ia n

3-jj lp 3

x E

i r

uT i

(ts s Eg5 r e e

lfiao Fe R

c

_j=

tnn g

ea nt mn c2. 3$

ninu elia pt el ai o uif qa ee aEMRR e - - -

p,H

- RABCDE

'2 e

taD de d lu edrce h

o t

f S o

FS N

1 I

REFUELING INFORMATION RE00EST 1.

Name of Facility:

Three Mile Island Nuclear Station, Unit 1 2.

Scheduled date for next refueling shutdown:

July 1, 1988 (7R) 3.

Scheduled date for restart..following refueling: September 14,1988 (7R) 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

Yes (For 7R)

If answer is yes, in general, what will these be?

Basic Refueling Report.

If answer is no, has the reload fuel design and core l

configuration been reviewed by your Plant Safety Review t

I Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref.10 CFR Section 50.59)?

If no such review has taken place, when is it scheduled?

To be determined.

5.

Scheduled date(s) for submitting proposed licensing action and supporting information: April 1,1988.

1 l

6.

Important licensing considerations associated with refueling, e.g. new or I

different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

None 7.

The number of fuel assemblies (a) in the core, and (b) in the spent fuel storage pool:

(a) 177 (h) 284 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The present licensed capacity is 752. There are no planned increases et this time.

9.

The projected Jate of the last refueling that can be discharged to the spent fuel pol assuming the present licensed capacity:

l 1991 is the last refueling discharge which allows full core off-load capacity (177 fuel assemblies).

i l

1

\\

l i

-a

t e

r R

hR i

ul u

s daet U

t -

o nvu N

~ yR 7 m4 p

egaf e

I 8S4 e

e rih e

s sd 9

d us t

nt nF a

8l1

.1 s

sn oaeIc 2 - 3W7 G

sf ee tiDiR

- l -. 1 S

eogv

-t fL u

E 5MbC7 0

e e

T r

ne orL r

f v

t O

pnar t

nfoI e or e

hi c Ino t

s ti n

ohp e

s c

M BN u

t gt o

is t

s O.ERYE s

t r

o

- a r

s e p

e N AA D O on c u

i cet Gahe e

pSR T N D E H Co b

her tie iR ud i

l b s yt I

EK T T P

&t r

ned e inv1 E

eAn t

oset luPr nI c

t E

e6 I

r L

s e

x CN L E u

v s

cn o

EfEE0 O U WT r

i pt o e a

e D

h C

P d

i cr m O

e rep ee 4

C r

t r l c r

pnme o

ro t

ocS i r t nC r

p ciI nu i

a ec r

eoo ec T

Ptt b o S

N m-H

.a l

O m

C A

r mc I

p'ou l

T e

X

/

a aSt E

N C

cp r

T c i i UD l

St E

l l ulI a a n n duu ue R

onnt h A

h a a ui R

y e

7V aMMA)

C

/

4 E

A E,gm C

N M1 21 1 4

W t

O P

3 D

H N

T A

N r

O e

8 SN M

e tn r

4 t

s W

T n e o A

0 e v p O

R iE e

/

0 c

D O

L R

N I

P 7

E 8

U R

l iS T

5 =t5 c

I

, E55 N

l 1

3 m

U a

j3<

lp m.

n l

s l t it s

3iE B

G er e a

uT s

lif ts F

R a o e

ec ggE 0

2 snn mnntg ea i

j3$

7 8

pt cl s et a nminu ug o

f e

qa e s

e 'l MRR a

,gF 5

F RABCDI F 2

e 7

7 8

8 taD

/

/

1 2

de

/

/

lu S

5 d

ed rt e h

o t

F S 3

4 o.

0 0

N FS 7

7 8

8 I

5 E

5 R

8 l

t h -

i t8 u

h N

v4 h

g I

e 7 a9 s

i e e 9

RS th s

sd a

8I -

.I nl a nt nF oa e I 2 - 0 _/

wa n

io 'tL DciR

- I 3 WI oudo 0M -./

d ne ru E

e e

t apr urL 5T6Ci i

n empe ts o

v c

mf I

tc e

l iw us n

s O.EEYE r tor ero I ta t u r

e MTBN s

u eht p e i r e p Gah N A A D O on c e

e ct pSR E H Co a

r%

eie T N D l go0 b s yt iR 1

ET P

&dt T

n1 E

nP tnv1 E

eAn pnt1 e6 i

r E

L C N L

s e

ei c m o rray EfEE0 E

u v

O U WT a

e D

C P

oDre r

uel O

t

.t 4

C ea n.hm e wsti r or x u d e,os tl nrs uowp e h oop r S cd a p S

N m

O H

.a)n C

mai T

l' X

aSl I

a cp C

ahu E

rci s U

T St D

H

la l uli a n E

duu oe r

R onnt h F

h a a u R

lf

?V eMMA0 t

E U

G O

i C

Ml 21+

W J

yn F

3 D

H N

T A

N O

S c

8 N

M e

t s

6 s n u 0

W T

n e

t e

v p 0

O R

ot E e D

O L

R 7

T P

8 E

U R

f I

S T

& :!6 I

)

N

[s5 n

U 4

i a

ki3e lp x

L

( t s

3i5 A

r e e

luT if ao F

e 1

tnnc ggE 6

ea go j 3y, 4

mn in el ai 3

. pt el a ninu u o uif ge qa ee

n. l e'MRR RF RABCDI F

2 te 2

a 1

D 6

d 0

e 7

d lu 3

ed t e nh o

t 5

FS o.

0 FS N

7 8

I

../

GPU Nuclear Corporation l

k,, u Nuclear

,omear8o Middletown, Pennsylvania 17057 0191 717 944 7621 TELEX 84 2386 Writer's Direct Dial Number

September 14, 1987 5211-87-2173 U. S. Nuclear Regulatory Commission Attn: Doctiment Control Desk Washington, D.C.

20555

Dear Sir:

Three Mile Island Nuclear Station, Unit I (TMI-1)

)

Operating License No. DPR-50 Docket No. 50-289 Monthly Operating Report l

August,1987 l

Enclosed please find two (2) copies of the August,1987 Monthly Operating Report for Three Mile Island Nuclear Station, Unit-1.

l In addition, the May and June 1987 reports contained errors in the " Unit Shutdowns and Power Reductions" form. The error was in the Duration column.

Corrected sheets for these reports are also enclosed.

Sincerely, 3

H'.

D.

ukill Vice President & Director, TMI-l HDH:DVH:spb i

cc:

W. Russell, USNRC R. Conte, USNRC Attachments 0015C 361.y GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation Ilt

OPERATIONS

SUMMARY

AUGUST,1987 The unit entered August operating at 100% power.

The plant continued the entire month operating at that power level producing approximately 850 MWe gross electrical generation.

I MAJOR SAFETY RELATED MAINTENANCE

{

During the month of August, TMI Unit 1 performed the following major maintenance:

1 l

Main Steam Valve MS-Y-88B - Main Steam Valve MS-V-888 repairs were completed i

in August (body to bonnet leakage).

The valve could not be isolated and Furmanite Leak Sealing Company was called to stop the leakage.

Injection holes were drilled in the bonnet / body area, adapters were installed and the

{

leak stopped by injecting Furmanite Compound into the gasket area.

All work is complete.

1 1

1 1

l l

1 l

i 1

i