ML20239A224

From kanterella
Jump to navigation Jump to search
NRC Operator Licensing Exam Rept 50-607/OL-98-01 (Including Completed & Graded Tests) for Tests Administered on 980616. Applicant Passed Exam
ML20239A224
Person / Time
Site: University of California-Davis
Issue date: 09/03/1998
From:
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20239A215 List:
References
50-607-OL-98-01, 50-607-OL-98-1, NUDOCS 9809080324
Download: ML20239A224 (2)


Text

, _ - _ _ - _ - _ _ _ _ _ _ _ - _ - _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ - _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _

  • O U. S. NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING INITIAL EXAMINATION REPORT REPORT NO.: 50-607/OL-98-01 FACILITY DOCKET NO.: 50-607 FACILITY LICENSE NO.: R-130

)

FACILITY: McClellan AFB EXAMINATION DATES: June 16,1998 EXAMINER: Warren J. Eresian, Chief Examiner SUBMITTED BY:

Warren J. Eresisn, Chief Examiner Date

SUMMARY

The NRC administered an initial examination to one Reactor Operator applicant. The applicant passed the examination. The examination was conducted in anticipation of the j licensing of the McClellan AFB TRIGA reactor in 1998. '

l l

I i

ATTACHMENT 1 9909000324 99090367 PDR ADOCK O i

_ _ - - - _ _ _ - _ _ _ _ _ _ _ _ _ _ . _. .i

REPORT DETAILS

'1. Examiners:

Warren J. Eresian, Chief Examiner

2. Results:

RO SRO Total (Pass / Fail) (Pass / Fad) (Pass / Fail)

NRC Grading: 1/0 0/ 1/0 3.- Written Examination:

The written examination was waived for the applicant. The waiver was granted on the basis that the applicant passed a comprehensive written examination as part of the A'r Force operator certifica+.lon program.

4. Operating Test:

The applicant passed the operating test. Portions of the operating test were waived i on the basis that the applicant passed an operating examination as part of the Air I Force operator certification program.

5; Exit Meeting:

An exit meeting was held on June 16,1998. Present were:

Warren J. Eresian, NRC Chief Examiner Wade J. Richards, Chief, Nuclear L! censing and Operations The NRC thanked the McClellan Nuclear Radiation Center staff for their cooperation during the examination.

l

\

Y --_ _--_ _ _--- --___