Forwards Rev 2 to Braidwood Station Units 1 & 2 Second Interval ISI Program Plan. Revs of Containment Populations Represent Programmatic Changes to Braidwood Station ISI Database
ML20238F816
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 09/02/1998
From: Tulon T
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20238F818 List:
References
NUDOCS 9809040347
Download: ML20238F816 (2)


Text

- - _ - _ - _ - - _ _ _ - _ _ _ _ _ _ _ _ - - - - _ - - - _ _ _ _ _ - _ - _ _ _ _ _ _ _ _.._

Commonwealth fahwn Company firaidwood Generating Station e

Rouw dl, llox 8 4 lirateville. II. 60 607 Axil 9 Tel HI 5-iSH 280 t l

1 September 2,1998 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001

Subject:

Braidwood Station Units 1 and 2 Revision 2 to Second Interval inservice Inspection Program Plan Facility Operating Licenses NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457

Reference:

1.

Letter from T. J. Tulon to the NRC, "Second Interval Insen' ice Inspection Program Plan," dated April 17,1998.

2.

Letter from T. J. Tulon to the NRC, " Revision to Second Interval Inservice Inspection Program Plan," dated August 3,1998.

In Reference 1 Braidwood Station submitted the Braidwood Station Units 1 and 2 Insersice Inspection (ISI) Program for the Second Ten Year Interval. Included in this revision were specific Relief Requests from certain ASME Code requirements. In Reference 2, Braidwood Station revised the program plan following telephone conversations with the NRC. The changes to the program related to revising a number of the relief requests in the original submittal, requesting approval for a number of the relief requests by certain dates to support the upcoming Braidwood Unit 1 outage, and

/

withdrawing one relief request.

As a result of an August 24,1998 telephone conversation between Commonwealth g

Edison Company and the NRR, Braidwood Station has agreed to revise Relief Request 12R-15. Specifically, a requirement to inspect a minimum percentage sample of welded attachments for each item in each code class has been added to the request. To support this change to the relief request, Braidwood Station is submitting Revision 2 to the Braidwood Station Units 1 and 2 Inservice Inspection Program for the Second Ten Year Interval, which is attached.

98 9040347 9so902 J ADOCK 05000456 G

PDR.

l.

Document Control Desk

. September 2,1998 i

l Page 2 In addition to the revision of Relief Request I2R-15, the Inservice Inspection Program Summary Table of Section 7.0 of the Program Plan was revised to reflect the number of components associated with Containment Surfaces Item E-A/E-C and Containment Pressure Retaining Bolting Item E-G. These revisions of containment populations

[

represent programmatic changes to the Braidwood Station ISI database.

Please address any comments or questions regarding this matter to Richard L.

Schliessmann, at (815) 458-2801 extension 2038.

Sincerely, othy J. Tulon

' te Vice President Braidwood Nuclear Generating Station Attachment.

cc:

Regional Administrator - USNRC, Rill NRC Senior Resident Inspector - Braidwood Station 98056tjt. doc ls w- __-

s -