A.
's O ur p
1 UNITED STATES
.g j
NUCLEAR REGULATORY COMMISSION 2
WASHINGTON, D.C. spee6 4001 o
49...,,,o August 31, 1998 Mr. James Davis Nuclea.' Energy Institute 1776 Eye Street, N. W.
. Suite 300 Washington, DC 20006-2496
Dear Mr. Davis:
In response to your letter dated August 6,1998, we plan to host a meeting for the technical specifications task force (TSTF) on September 24,1998, and we look forward to receiving your agenda as soon as possible. This would allow the staff to facilitate a review of specified items as well as I
personnel availability.-
)
We appreciate your thoughts on the staff interface with the TSTF, and in that light we would like to explore with the TSTF, process improvements to achieve progress in a less resource-intensive manner on safety or significant operational issues rather than on style, format (TSTF-255), and preference issues.
In addition to process improvement, the following are issues upon which the NRC feels both the staff as well as industry should focus and give priority:
i e Response time testing (TSTF-111, R.1).
e RPS and ESFAS instrumentation (industry's proposed re-submittal of TSTF-135) e Industry initiative on using condition monitoring to achieve superior instrument calibration as well as longer surveillance intervals to increase availability.
e Ice condensers.
e BWR Secondary containment doors (TSTF-018).
- SRs that require a licensee to enter LCO 3.0.3 to perform.
e Administrative Controls (TSTF-258)
The staff requests that the TSTF address progress on these issues at the start of the /[
September 24,1998, meeting.
W 993 i
5 9809030431 980831 PDR REVOP ERONUMRC PDR
.!.?
L u t;L i'f 5 3 EU $3d[ffd N+N l
o n-wa m
xo h - G nw.
\\
l Mr. Jimss Davis August 31, 1998 Please contact me at (301) 415-1161 or e-mail wdb@nrc. gov if you have any questions or need further information on these proposed changes.
Sincerely, Original Signed By William D. Beckner, Chief Technical Specifications Branch
. Associate Director for Projects Office of Nuclear Reactor Regulation cc: N. Clarkson, BWOG D. Wuokko, BWOG B. Ford, BWROG J. Volkoff, CEOG D. Bushbaum, WOG D. Hoffman, EXCEL DISTRIBUTION:
E-mail: WDBeckner Hard copy:
TSB Staff File Center TSB Reading File PUBLIC DOCUMENT NAME: 0 \\DLJ\\08278NEl LTH 'Isee previous concurrences) i OFFICE NRR/ADPR/TSB NRR/ADPR/TSB NRR/ADPR/TSB NAME DLJohnson*
FMReinhart '
WDBeckner 60t%
DATE 08/31/98 08/28/98 08/'3I/98 OFFICIAL RECORD COPY
.E4.
]
l Mr. James D:vis August 31, 1998 Please contact me at (301) 415-1161 or e-mail wdb@nrc. gov if you have any questions or need further information on these proposed changes.
Sincerely, ygiaD./h!--
William D. Beckner, Chief Technical Specifications Branch Associate Director for Projects Office of Nuclear Reactor Regulation ec: N. Clarkson, BWOG D. Wuokko, BWOG B. Ford, BWROG J. Volkoff, CEOG D. Bushbaum, WOG D. Hoffman, EXCEL l