ML20238E836

From kanterella
Jump to navigation Jump to search
Mod 10 to Contract NRC-04-96-037
ML20238E836
Person / Time
Issue date: 08/25/1998
From: Mace M, Mcguire R
NRC OFFICE OF ADMINISTRATION (ADM), RISK ENGINEERING, INC.
To:
References
CON-NRC-04-96-037, CON-NRC-4-96-37 NUDOCS 9809020227
Download: ML20238E836 (2)


Text

-

1

1. CONTRACT ID CODE PAGE OF PAGES AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT g

7. AMENDMENT / MODIFICATION NO.

3. EFFECTIVE DATE
4. REQUISli!ON/ PURCHASE REQ. NO.
5. PROJECT No.

Ten (10) g 2 y 1998

6. ISSUED BY CODE
7. ADMINISTERED BY CODE I (if other than Item 6)

U.S. Nuclear Regulatory Commission Division of Contracts and Property Management Washington, DC 20555

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP code) 9A. AMENDMENT OF SOLICITATION No.

Risk Engineering, Inc.

4155 Darley Avenue, Suite A

98. C ATED (SEE ITEM 11)

Boulder, CO 80393 Principal Investigator:Dr. Robin McGuire Telephone No.: (303) 499-3000 10A. MODIFICATION OF CONTRACT / ORDER NO.

X NRC-04-96-037 108. DATED (SEE ITEM 13)

CODE I FACILITY CODE

11. THl$ ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS O The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of O is not extended.

Offers O is extended, licitation or as amendedOfferors must acknowledge receipt of this amendment prior to the hour and date sp;ified in the so by one of the following methods: (a) By completing items 8 and 15, and returning copies of the amerdnent; (b By acknowl ng receipt of this amendment on each copy of the effer submitted or (c) By separate letter or te gram which i tudes a reference to the solicitation and amerdnent numbers. FAILURE OF YOUR ACKNOWLEDGMENT To BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an of fer already submitted {on and this amendnent, and is received prior to the opening hour and date specified.such change may be mad r0ference to the solicitat

12. ACCOUNTING AND APPROPRIATION DATA (if required)

N/A

13. THIS ITEM APPLIES ONLY 10 MODIFICATIONS OF CONTRACTS / ORDERS, IT MODIFIES THE CONTRACT / ORDER NO. AS DESCRIBED IN ITEM 14.

l A. THIS CHANGE ORDER IS ISSUED PURSUANT To: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B.1HE ABOVE NUMBERED CONTRACT / ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.1u3(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Changes - Cost Reimbursement Alternate I (Apr. 1984) l FAR Clause 52.243 2 E..IMPORTANT: Contractor O is not, @ is required to sign this docunent and return 2 copies to the issuing office.

14. DESCRIPil0N OF AMENDMENT / MODIFICATION (Organized by UCF section headings, including solicitation / contract subject matter where feasible.)

j (see page 2) f g

k

/

9809020227 980825 PDR CONTR NRC-04-96-037 PDR.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore i

changed, remains unchas ed and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) kg/g p,, M@jg [%Q1A/[

MaryfMace, Cont / acting Officer

/

15 D E SIGNED 168. U STA ES OF 16C. DATE SIGNED 158.

T E OR BT

./

t k

h(

s (Signhture of person auWorized to sign)

(sigdature hf B6ntrgcliriq Of ficer)

NSN 7540-01-152-8070 30-105

[ STANDARD FOR)

'4 0 (REV.10-83)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

/

F AR (46 CFR) 53.243 4

6._

u Contract No. NRC-04-96-037 Modification No.10 Page 2 of 2 The purpose of this modification is to (1) correct the cost and ceiling amounts from Modification No. 9 by increasing the cost amount to $881.204 and the total ceiling amount to $884.556. and (2) incorporate travel costs in the amount of $5.168 as referenced in Dr. Robin McGuire's proposal dated 6/24/98 for a conference in the Washington, DC area to present a paper on October 28, 1998.

A conference registration fee of $75 is also added to the travel costs for Dr. McGuire's attendance at the meeting for a totai of $5.243.

Accordingly, the contract is hereby modified as follows:

1.

Section B.3. CONSIDERATION AND OBLIGATION--COST PLUS FIXED FEE (JUNE 1988) ALTERNATE I (JUNE 1991). paragraph a is deleted in its entirety and the following paragraph is substituted in lieu thereof:

"a.

The total estimated cost to the Government is increased by $22.443 from $858.761 to $881.204. The fixed fee remains at $3.213 plus

$139 for-the additional within-scope work for a total fixed fee of

$3.352.

The total estimated cost plus fixed fee for fuli performance of this contract is $884.556, of which the sum of

$881.204 represents the estimated reimbursable costs, and of which $3.352 represents the fixed fee."

All other terms and conditions under this contract remain unchanged.

A summary of oblig'ations for this contract. from award date through the date of this action, is given below:

Total FY 96 Obligation Amount:

$ 275,000.00 Total FY 97 Obligation Amount:

$ 260.000.00 Total FY 98 Obligation Amount:

$ 250.000.00 Cumulative Total of NRC Obligations:

$785.000.00 This modification obligates NRC FY '98 funds in the amount of $-0.

i l

L