Davus-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, Ohio 43449-9760 Docket Number 50-346 License Number NPF-3 Serial Number 2551 August 26, 1998 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001
Subject:
Semiannual Fitness-For-Duty Report, January - June,1998 Ladies and Gentlemen:
Pursuant to 10 CFR 26.71(d),"Recordkeeping Requirements," Toledo Edison submits its semiannual Fitness-For-Duty (FFD) report for the period of January through June 1998 for the Davis-Besse Nuclear Power Station, Unit 1. provides Toledo Edison's FFD Program Perfonnance Data. Attachment 2 provides a summary of management actions taken by Toledo Edison based on positive FFD testing results, presumptive positives, and a list of FFD event reports submitted by Toledo Edison. The licensee employee who tested positive was a fossil plant worker not normally assigned to the Davis-Besse Nuclear Power Station.
Should you have any questions or require additional information, please contact Mr. James L.
Freels, Manager - Regulatory Affairs, at (419) 321-8466.
Sincerely, A 'C/s 9809020162 950826 k
PDR ADOCK 05000346 R
PDR Attachments A. G. IIansen, NRC Project Manager cc:
sd' r
A. B. Beach, Regional Administrator, NRC Region III Y~
S. J. Campbell, DB-1 Senior Resident Inspector Utility Radiological Safety Board
1
, Docket Number 50-346 License Number NPF-3 i
Serial Number 2551
)
Toledo Edison Fitness-For-Duty Report January - June 1998
1
' Docket Number 50-346 Lkiense Number NPF - 3 Serial Number 2551 Fitness for Duty Program i
Performance Data l
Personnel Subject to 10CFR 26 Toledo Edison June 30.1998 Company.
6 Months Ending Davis-Besse (419) 321-8466 Location Phone l
J. L. Freels. Manaaer-Reaulatory Affairs Contact Name l
' Cutoffs: Screen / Confirmation (nalml)
Appendix A to 10 CFR 26 Marijuana 50/15 Amphetamines 1000/500 Cocaine 300/150 Phencyclidine 25/25 Opiates 300/300 Alcohol (%BAC) 0.04 4
l Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with Unescorted Access 791 0
294 Categories Tested Positive Tested Positive Tested Positive Pre-Access 61 0
741 10 Post Accident 5
0 0
0 Observed Behavior 2
0 7
5 Random 200 0
57 1
Follow-up 6
1 16 0
Other 101 0
18 0-l Total 375 ili 839 15/16 l
Breakdown of Confirmed Positive Tests for Specific Substances Marijuana Cocaine Opiates Amphe-Phency-Alcohol Refusal tamines clidine to test Licensee Employees 0
1 0
0 0
0 0
Long-Term Contractors 0
0 0
0 0
0 0
Short-Term Contractors 6
4 0
0 0
5 1
Total 6
5 0
0 0
5 1
17
l '.
. Docket Number 50-346 I
Lictnse Number NPF - 3 Serial Number 2551
~
r ^
l l
TOLEDO EDISON MANAGEMENT ACTIONS RELATING TO FITNESS-FOR-DUTY l
Toledo Edison Contractor
)
Personnel Personnel Referred to EAP 0
N/A l
Management Sanctions 1
16 Toledo Edison does not perform onsite initial drug screening tests; therefore there are no unconfinned l
positive results on which to base management actions.
TOLEDO EDISON
. FITNESS-FOR-DUTY 1
REPORTS There were no Fitness-For-Duty reports submitted during this reporting period (January - June 1998).
i i