c i
]
NOTICE OF VIOLATION I'linois Power Company License No. NPF-62 l
As a result of-the inspection conducted on August 4 through 31, 1987, and in accordance with the " General Policy and Procedure for NRC Enforcement Actions", 10 CFR Part 2, Appendix C (1985), the following violation was identified:
i Technical Specification 6.8.1.a. requires that written procedures shall be established and implemented covering the activities referenced in Appendix A of Regulatory Guide 1.33 Revision 2, February 1978. Regulatory Guide 1.33 Appendix A, Item 9 lists procedures for performing maintenance.
a Contrary to the above:
1 On August 12, 1987, personnel performing maintenance on the Reactor'Recirc Flow Control system in accordance with Maintenance Work Request (MWR) C-37643 failed to implement the -instructions of the MWR in that prior to performing l
work they did not ensure that the Hydraulic Power Unit was locked out.
I l
This is a Severity Level IV violation (Supplement I) (461/87030-05(DRP)).
I I
Pursuant to the provisions of 10 CFR 2.201, you are required to submit to this l
office within thirty days of the date of this Notice a written statement or
]
explanation in reply, including for each violation:
(1)correctiveaction j
_. taken and the results achieved;-(2) corrective action to be taken to avoid.__
)
further violations; and (3) the date when full compliance will be achieved.
Consideration may be given to extending your response time for good cause shown.
1 Y
l SEP 10 1987 f)M.),$..,. I # 3 W b Dated W. L. Forney,"Chisf.
3 Reactor Projects Branth-l' l
l 1
a l
I 8709140149 870910 PDR ADOCK 050 4 1 0
l
_____u--
w---
- - - - - - - - - - - - " - - - -