Text
__ _-
r
+
~/
[ _r x) Comm:nwrith Byron Nucitar Station Edison paion11Y W i @
{I s P-
'- \ 1 a ,a r( ad.J.
N
\s J 4450 North Byron, Grrman Church Ro:d Illinois 61010 v r[' 4 m
,d[
NC r il tv g __
m e r - E ' ._. s
~ (ILQ194 December 21, 1987 l LTR: BYRON 87-1162 Mr. A. Bert Davis Regional Administrator Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137
Dear Sir,
This report is submitted in accordance with Byron Station Unit 1 Operating License NPF-37 Appendix A, Technical Specification 4.8.1.1.3, reporting of Diesel Generator Failures.
This report addresses one valid test and failure experienced on the 1A Diesel Generator. The criteria to determine valid tests and failures is in accordance with section C.2.e of Regulatory Guide 1.108. Attachment A provides a summary, as prescribed by Regulatory Guide 1.108, of all tests that occurred within the time period over which the last 100 valid tests were performed.
On September 25,1987 at 1327, the 1A diesel generator (DG) was started per
)
the monthly operability surveillance, 1BOS 8.1.1.2.a-1. Approximately thirty i minutes into the full load run the engine operator noticed a seventy dagree fahrenheit temperature drop in the number five right (5R) cylinder. Further inspection of the SR cylinder revealed a substantial fuel oil leak at the '
connection of the fuel pump and the fuel pump diccharge line. The 1A DG was shutdown at 1426 on September 25, 1987. At 1435. Limiting Condition for Operation Action Requirement 1BOS 8.1.1-la was entered for one diesel l generator inoperable. At 2016, repair activities to replace the fuel pump and .
l the fuel discharge line were completed and the 1A DG was started for a
!. maintenance run. During the maintenance run peak firing pressures were
) obtained from the SR cylinder to insure proper operation of the replaced fuel i pump. Following successful completion of the maintenance run, the 1A DG was started per the monthly operability surveillance. At 2357, on September 25, 1987 the operability surveillance was completed and If. OAR 1BOS 8.1.1-la was exited.
I 1 \ l 8801040560 071221 f DR ADOCK 0500 4 g sp DEC 2 81937 1
L
BYRON 87-1162 Page 2 The root cause for this event was a cracked fitting at the SR cylinder fuel pump discharge. The fuel pump has been sent to the Commonwealth Edison Material Analysis Department for a failed component inspection.
I The 1A diesel generator was inoperable for 9 hours1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br /> and 22 minutes as a result of this even+.. This failure was the second failure during the last 20 valid I tests on the 1A DG, therefore, per table 4.8-1 of the Byron Technical Specifications, the 3A DG will be placed on a weekly testing frequency.
This failure was the seventh failure during the previous 100 valid tests for Unit 1, therefore, this report is supplemented with the additional information requested by Regulatory Guide 1.108 C.3.b. Attachment A lists the summary of all tests, valid and invalid, that occurred within the time period over which the last 100 valid tests were performed.
Several corrective actions have been taken, and are planned, to increase the reliability of the Unit 1 diesel generators based on tne failures experienced. Four of the seven failures were caused by the engine not reaching rated speed, voltage, and frequency within the required ten seconds.
Byron Station believes that a major contributor to these failurec is a loss of fuel prime. To correct this problem, soft seat check valves were added in the fuel oil supply line to prevent back leakage of the fuel cil. In addition a modification is currently in progress to add a loop seal and an anti-syphon vent to the fuel supply line. These changes will guarantee that the engine will have an adequate supply of fuel oil during the start sequence.
1 One failure was caused by degradation of a relay which transfers an electronic signal to the electronic governor. Because of the type of signal transferred through tne relay, minor rasistance can cause governor oscillations. A modification has been initiated to replace the subject relay with a relay that has lower contact resistance.
The other two failures which occurred during the last 100 valid tests include the failure addressed in this repcrt, and the failure of the 1A diesel generator stator on November 23, 1985. The root cause for the stator fcilure was a loose nut which was found inside the stator housing. The rut apparently was thrown into the windings from the rotor fan blades. The origin of the nut was never determined. All maintenance departments were reminded of the importance of thorough inspectior.s of rotating equipment prior to and during reassembly. No failures of this type have occurred since the November 23, 1985 failure.
Byron Station has taken comprehensive corrective actions to rectify the current diesel generator problems.
~ _ _ _ _ _ _ . _ _ _ _ _ _ _ __ _____m
BYROM 87-1162 Page 3 Byron Station believes that the overall reliability of electric power to Engineered Safety Feature equipment is adequate. The primary source of offsite power, the Unit 1 system auxiliary transformers and associated breakers, has experienced 100% reliability since receipt of the Unit 1 operating license. The backup source of offsite power, the Unit 2 system auxiliary transformers and associated breakers, has experienced three unrelated failures during this same period. In all cases the Unit 2 diesel generators operated per design. The reliability of offsite power and the associated transformers and breakers, in sddition to the confidence Byron Statior has in the future operction of the emergency diesel generators, provides ths basis for cont'.nued plant operation.
~
i
- ) s t}. '[g'[$sWP M
R. E. Querio Station Manager Byron Nuclear power Station REQ /MMR/bb (1744M/0197M)
Attachments cc: p. Brochman, NRC Senior Resident Inspector U.S. NRC Document Control Desk, Washington D.C.
INPO Record Center CECO Distribution List 1
o nTTACHMENT A VALID TESTS AND FAILURES: (I,II,III...)
VALID SUCCESSFUL TESTS: (1,2,3,...)
DATE ACTIVITY
- 1. 11/10/85 1B DG 18 Month Operability Surveillance, 1BVS 8.1.1.2.f-14.
Engine loaded for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and 32 minutes. Valid successful test. (1)
- 2. 11/11/85 1B DG 18 Month Operability Surveillance, 1BVS 8.1.1.2.f-14.
Engine loaded.for 22 minutes. Invalid test.
- 3. 11/11/85 1B DG 18 Month Operability Surveillance, 1BVS 8.1.1.2.f-14.
Engine loaded for 52 minutes. Invalid test.
- 4. 11/11/85 IB DG 18 Month Operability Surveillance, IBVS 8.1.1.2.f-14.
ESF loads sequenced on and operated for 13 minutes. Invalid test.
- 5. 11/12/85 1B DG 18 Month Operability Surveillance, 1BVS 8.1.1.2.f-16.
Safe shutdown loads sequenced on and operated for 17 minutes.
Invalid test.
- 6. 11/12/85 1B DG Maintent:nce run. Invalid test.
- 7. 11/12/85 1B DG Maintenance run. Invalid test.
l
- 8. 11/13/85 1B DG Monthly Operability Surveillance, !
1BOS 8.1.1.2.a-2. Engine not loaded. Invalid Test. l
)
- 9. 11/14/85 1A DG 18 Month Operability Surveillance, IBVS 8.1.1.2.e-1. j Engine loaded for 9 hours1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br /> and 54 minutes. Valid Successful l test. (2) !
1
- 10. 11/22/85 1A DG 18 Month Operability Surveillance, 1BVS 8.1.1.2.e-1. !
Engine tripped on Incomplete Sequence due to a nonfailsafe valve being valved out. Engine would have operated in emergency mode. Invalid test.
- 11. 11/22/85 1A DG 18 Month Operability Surveillance, IBVS 8.1.1.2.e-1.
Engine loaded for 9 minutes. Invalid test.
- 12. 11/22/85 1A DG 18 Month Operability Surveillance, 1BVS 8.1.1.2.e-1.
Spurious trip after engine was loaded for 68 minutes. Invalid test.
(174(M/0197M) l
i DATE ACTIVITf
- 13. 11/23/85 1A DG Maintenance run. Invalid test.
- 14. 11/23/85 1A DG 18 Month Operability Surveillance, IBVS 8.1.1.2.e-l.
Engine tripped on generator differential af ter being loaded
(
for 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> and 14 minutes. Valid Failure. (I)
- 15. 12/2/85 1A DG Maintenance run. Invalid test.
1
- 16. 12/2/85 1A DG Maintenance run. Invalid test.
- 17. 12/2/85 1A DG Maintenance run. Invalid test. !
- 18. 12/2/85 1A DG Maintenance run. Invalid test.
- 19. 12/3/85 1A DG 18 Month Operability Surveillance, 1BVS 8.1.1.2.e-l.
Engine loaded for 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> and 28 minutes. Valid successful test. (3)
- 20. 12/4/85 1A DG Maintenance run. Invalid test.
i
- 21. 12/4/85 1A DG 18 Month Operability Surveillance, 1BVS 8.1.1.2.f-7. {
Engine not loaded. Invalid test. !
- 22. 12/4/85 1A DG 18 Month Operability Surveillance, 1BVS 8.1.1.2.f-9.
Engine not loaded. Invalid test.
- 23. 12/4/85 1A DG 18 Month Operability Surveillance, IBVS 8.1.1.2.f-11.
Engine loaded for 71 minutes. Valid successful test. (4)
- 24. 12/5/85 1A DG 18 Month Operability Surveillance, IBVS 8.1.1.2,f-13.
Engine loaded for 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> and 18 minutes. Valid successful test. (5)
- 25. 12/5/85 1A DG 18 Month Operability Surveillance, IBVS 8.1.1.2.f-13. f Engine loaded for 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> and 18 minutes. Valid successful test. (5)
- 26. 12/7/85 1A DG 18 Month Operability Surveillance, IBVS 8.1.1.2.f-15 Safe shutdown loads sequenced on and operated for 11 minutt2.
Strip chart recorder failure during the SX pump shed. Invalid test.
- 27. 12/7/85 1A DG 18 Month Operability Surveillance, IBVS 8.1.1.2.f-15.
Safe shutdown loads sequenced on and operated for 26 minutes.
Invalid test.
l (1744M/0197M)
_ _ _ - _ _____-__________a
DATE ACTIVITY
- 28. 12/7/85 1A DG 18 Month Operability Surveillance,1BVS 8.1.1.2.f-19.
Engine loaded for 18 minutes. Invalid test.
- 29. 12/8/85 1A DG Monthly Operability Surveillance, 1BOS 8.1.1.2.a-1.
Engine loaded for 62 minutes. Valid successful test. (6)
- 30. 12/12/85 1B DG Maintenance run. Invalid test.
- 31. 12/12/85 1B DG Monthly Operability Surveillance, IBOS 8.1.1.2.a-2.
Engine loaded for 64 minutes. Valid successful test. (7)
- 32. 12/15/85 IB DG Quarterly Emergency Start Surveillance, IBOS 3.2.1-816.
Engine not loaded. Invalid test.
- 33. 12/17/85 1A DG Quarterly Emergency Start Surveillance, 1BOS 3.2.1-806.
Engine not loaded. Invalid test.
- 34. 01/05/86 1A DG Semi-Annual Operability Surveillance, IBOS 8.1.1.2.a-3.
Engine shutdown due to small fuel oil leak. Invalid test.
- 35. 01/05/86 1A DG Maintenance run. Invalid test.
- 36. 01/05/86 1A DG Semi-Annual Operability Surveillance, IBOS 8.1.1.2.a-3.
Engine loaded for 71 minutes. Valid successful test. (8)
- 37. 01/10/86 1A DG Monthly Operability Surveillance, IBOS 8.1.1.2.a-l.
Engine loaded for 67 minutes. Valid successful test. (9)
- 38. 01/12/86 1B DG Monthly Operability Surveillance, IBOS 8.1.1.2.a-2.
Engine loaded for 69 minutes. Valid successful test. (10)
- 39. 01/19/86 1B DG Semi-Annual Operability Surveillance, IBOS 8.1.1.2.a-4.
Engine loaded for 66 minutes. Valid successful test. (11)
- 40. 01/28/86 1A DG Monthly Operability Surveillance, IBOS 8.1.1.2.a-l.
Engine loaded for 73 minutes. Valid successful test. (12)
- 41. 02/12/86 1B DG Monthly Operability Surveillance, IBOS 8.1.1.2.a-2.
Engine loaded for 71 minutes. Valid successful test. (13)
- 42. 02/17/86 1B DG 18 Month Croestie Capability Surveillance, IBOS 8.1.1.1.b-2. Engine loaded for 13 minutes. Invalid test.
- 43. 02/17/86 1A DG 18 Month Crosstie Capability Surveillance, IBOS 8.1.1.1.b-1. Engine loaded for 20 minutes. Invalid test.
- 44. 02/23/86 1A DG run per the Manual Safety Injection Surveillance, 1BOS 3.2.1-1. Engine not loaded. Invalid test.
(1744M/0197M)
DATE ACTIVITY
- 45. 02/23/86 1B DG run per the Manual Safety Injection Surveillance, IBOS 3.2.1-1. Engine not loaded. Invalid test.
- 46. 02/23/86 1B DG run per the Manual Safety Injection Surveillance, 1BOS 3.2.1-1. Engine loaded to bring temperatures to normal after surveillance. Engine tripped due to a bad isochronous relay. Failure isolated to a test mode failure only. Invalid test.
- 47. 02/23/86 1B DG Maintenance run. Invalid test.
- 48. 02/24/86 1B DG Monthly Operability Surveillance, IBOS 8.1.1.2.a-2.
Engine loaded for 73 minutes. Valid successful test. (14)
- 49. 02/24/86 1B DG run for vibration signatures. Engine loaded for I hour 39 minutes. Valid successful test. (15) 50, 02/24/86 1A DG run for vibration signatures. Engine loaded for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and 17 minutes. Valid successful test. (16)
- 51. 02/28/86 1A DG Monthly Operability Surveillance, IBOS 8.1.1.2.a-1.
Engine loaded for 71 minutes. Valid successful test. (17)
- 52. 03/13/86 1B DG Quarterly Emergency Start Surveillance, IBOS 3.2.1-816.
Engine loaded following surveillance to bring temperatures to normal. Engine tripped due to a failed isochronous relay.
Failure isolated to a test mode failure only. Invalid test.
- 53. 03/14/86 1B DG Maintenance run. Invalid test.
- 54. 03/14/86 IB DG Quarterly Emergency Start and Monthly Operability Surveillance 1BOS 3.2.1-816, and 1BOS 8.1.1.2.a-2. Engine loaded for 69 minutes. Valid successful test. (18)
- 55. 03/14/86 1A DG Quarterly Emergency Start and Monthly Operability Surveillance, IBOS 3.2.1-806 and IBOS 8.1.1.2.a-l. Engine loaded for 71 minutes. Valid successful test. (19)
- 56. 03/15/86 1B DG run to take vibration data. Engine loaded for 63 minutes. Valid successful test. (20)
- 57. 03/31/86 1A DG Monthly Operability Surveillance, IBOS 8.1.1.2.a-l.
Engine loaded for 69 minutes. Valid successful test. (21)
- 58. 04/14/86 1B DG Monthly Operability Surveillance, IBOS 8.1.1.2.a-2.
Engine loaded for 72 minutes. Valid successful test. (22)
(1744M/0197M)
DATE ACTIVITY
- 59. 04/15/86 1A DG Menthly Operability Surveillance, 1BOS 8.1.1.2.a-1.
Engine loaded for 73 minutes. Valid successful test. (23)
- 60. 04/20/86 1A DG Semi-Annual Operability Surveillance, 1BOS 8.1.1.2.a-3. ,
Engine loaded for 64 minutes. Valid successful test. (24) {
- 61. 04/30/86 1A DG Semi-Annual Operability Surveillance,1BOS 8.1.1.2.a -3.
Engine loaded for 67 minutes. Valid successful test. (25)
- 62. 04/30/36 IB DG Semi-Annual Operability Surveillance, IBOS 8.1.1.2.a-4.
Engine failed to reach rated speed, voltage, and frequency in 10 seconds. Valid test and failure. (II)
- 63. 04/30/86 1B DG Semi-Annual Operability Surveillance, IBOS 8.1.1.2.a-4.
Engine loaded for 86 minutes. Valid successOc1 test. (26)
- 64. 05/10/86 1B DG Monthly Operability Surveillance, 1BOS 8.1.1.2.a-2.
Engine loaded for 63 minutes. Valid successfu? test. (27)
- 65. 05/16/86 1B D3 Quarterly Emergency Start Surveillance, 1BOS 3.2.1-816.
Engine not loaded. Invalid test.
- 66. 05/19/86 1A DG Quarterly Emergency Start Surveillance,1BOS 3.2.1-806.
Engine not loaded. Invalid test.
l'
- 67. 06/02/86 1A DG Monthly Operability Surveillance, 1BOS 8.1.1.2.a-1.
Engine loaded for 73 minutes. Valid successful test. (29) ll
- 68. 06/15/86 IB DG Monthly Operability Surveillance, 1BOS 8.1.1.2.a-2.
Engine loaded for 70 minutes. Valid successful test. (29)
- 69. 06/24/86 IB DG Monthly Operability Surveillance, IBOS 8.1.1.2.a-2.
Engine loaded for 66 minutes. Valid successfol test. (30)
- 70. 06/24/86 1A DG Monthly Operability Surveillance, 1BOS 8.1.1.2.a-l.
Engine loaded for 70 minutes. Valid successful test. (31)
- 71. 07/14/86 1B DG Monthly Operability Surveillance, 1BOS 8.1.1.2.a-2. !
Engine loaded for 71 minutes. Valid successful test. (32)
- 72. 07/20/86 1B DG Monthly Operability Surveillance, IBOS 8.1.1.2.a-2. ,
Engine loaded for 69 minutes. Valid successful test. (33)
- 73. 07/22/86 1B DG Monthly Operability and Semi-Annual Operability Surveillance, IBOS 8.1.1.2.a-2,4. Engine loaded for 68 minutes. Valid successful test. (34) l l
l 1
(1744M/0197M)
DATE AOTZVITY j 1
7.4. 07/25/86 1A DG Monthly Operability Surveillance, 1BOS 8.1.1.2.a-1.
Engine loadsd for 71 minutes. Valid successful test. (35)
- 75. 08/05/86 1A DG Monthly Operability Surveillance, IBOS 8.1.1.2.a-1.
Engine loaded for 89 minutes.. Valid successful test. (36) ]
1
- 76. 08/05/86 1B DG Monthly Operability Surveillance, IBOS 8.1.1.2.a-2. )
Engine loaded for 61 minutes. Valid successful test. (37) {
l
- 77. 08/07/86 1A DG Maintenance run. Invalid test.
- 78. 08/07/86 1A DG Maintenance run. Invalid test. 1
- 79. 08/21/86 1A DG Quarterly Emergency Start Surveillance, IBOS 3.2.1-806.
Engine not loaded. Invalid test. l
.{
- 80. 08/21/86 1B DG Quarterly Emergency Start Surveillance, 1BOS 3.2.1-816. )
Engine not loaded. Invalid test.
- 81. 08/21/86 IB DG Monthly Operability Surveillance, IBOS 8.1.1.2.a-2.
Engine loaded for 69 minutes. Invalid test.
l
- 82. 09/08/86 1A DG Monthly Operability Surveillance, IBOS 8.1.1.2.a-1. j Engine loaded for 70 minutes. Valid successful test. (38) '
- 83. 09/23/86 1D DG Monthly Operability Surveillance, 1BOS 8.1.1.2.a-2.
Engine loaded for 70 minutes. Valid successful test. (38)
- 84. 09/23/86 IB DG run to check start time. Engine loaded for 31 minutes. !
Invalid test.
SS. 10/11/86 1A DG Monthly Operability Surveillance, 1BOS 8.1.1.2.a-l.
Engine loaded for 88 minutes. Valid successful test. (40)
- 86. 10/12/86 1A DG Maintenance run. Invalid test. )
- 87. 10/18/86 1B DG Monthly Operability Surveillance, IBOS 8.1.1.2.a-2 and SX load test. Engine Icaded for 24 minutes. Engine tripped due to a spurious alann that is bypassed in the emergency mode. Invalid test.
l
- 88. 10/18/86 1B DG Monthly Operability Surveillance, IBOC 8.1.1.2.a-2. j Engine never reachad rated speed due to a failed motorized ]
potentiometer that is bypassed in the emergency mode. Invalid test.
- 89. 10/18/86 IB DG Maintenance run. Invalid tout.
1 i
(1744M/0197M)
DATE AC'EIVITY
- 90. 10/19/86 1B DG Maintenance run. Invalid test.
- 91. 10/19/86 1B DG Maintenance run. Invalid test.
- 92. 10/19/86 IB DG Monthly Operability Surveillance, 1BOS 8.1.1.2.a-2.
Engine loaded for 69 minutes. Valid successful test. (41)
- 93. 10/21/86 1A DG Semi-Annual Operability Surveillance, 1BOS 8.1.1.2.a-3.
Engine loaded for 66 minutes. Valid successful test. (42)
- 94. 10/27/86 1B DG run per SPP-86-149, SX Cooling tower test. Engine loaded for 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> and 22 minutes. Valid successful test.
(43) l
- 95. 11/07/86 1A DG Monthly Operability Surveillance, 1BOS 8.1.1.2.a-l.
Engine loaded for 62 minutes. Valid successful test. (44)
- 96. 11/22/86 1A DG 18 Month Crosstie Capability Surveillance, IBOS 8.1.1.2.j-1. Engine loaded for 44 minutes. Invalid test.
- 97. 11/23/86 1A DG 18 Month Crosstie Capability Surveillance, IBOS 8.1.1.2.j-1. Engine loaded for 70 minutes. Valid successful test. (45)
- 98. 11/24/86 1B DG Quarterly Emergency Start Surveillance, IBOS 3.2.1-816.
Engine loaded for 61 minutes following the surveillance.
Valid successful test. (46) 99.- 11/27/86 1B DG Monthly Operability Surveillan::e,1BOS 8.1.1.2.a-2.
Engine loaded for 70 minutes. Valid successful test. (47) 100. 11/27/86 1A DG Quarterly Emergency Start Surveillance, IBOS 3.2.1-806.
Engine not loaded. Invalid test.
101. 12/11/86 1A DG Monthly Operability Surveillance, IBOS 8.1.1.2.a-l.
Engine loaded for 71 minutes. Valid successful test. (48) 102. 12/15/86 1B DG Quarterly Emergency Start Surveillance, 1BOS 3.2.1-816.
Run to check cooldown cycle. Engine not loaded. Invalid test.
103. 12/15/86 1B DG Quarterly Eme:gency Start Surveillance,1BOS 3.2.1-816.
Run to check cooldown cycle. Engine not loaded. Invalid test. l l
104. 12/30/86 1B DG Monthly Operability Surveillance, 1BOS 8.1.1.2.a-2.
7 Engine loaded for 70 minutes. Valid successful test. (49) 105. 12/30/86 1A DG Mont!.ly Operability Surveillance, 1BOS 8.1.1.2.a-1.
Engine loaded for 70 minutes. Valid successful test. (50)
(1744M/0197M)
)
. 1 DATE ACTIVITY 106. 01/08/87 _1B DG Monthly Operability Surveillance,1BOS 8.1.1.2.a-2. 1 Engine loaded for 83 minutes. Valid successful test. (51) j 1
107. 01/09/87 1A DG Maintenance run following #3 Master Rod Replacement.
Invalid test.
108. 01/09/87 1A DG Monthly Operability Surveillance, 1BOS 8.1.1.2.a-1. l Engine loaded for 70 minutes. Valid successful test. (52) 109. 01/09/87 1A DG Monthly Operability Surveillance, IBOS 8.1.1.2.a-1.
Extended surveillance to verify corrective maintenance. l Engine loaded for 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> and 10 minutes. Valid successful !
test. (53) 110. 01/13/87 1B DG Monthly Operability Surveillance, IBOS 8.1.1.2.a-2.
Engine loaded for 71 minutes. Valid successful test. (54) 111. 01/20/87 1B DG Quarterly Emergency Start Surveillance,1BOS 3.2.1-816, to check cooldown cycle. Engine not loaded. Invalid test.
112. 01/20/87 1B DG Quarterly Emergency Start Surveillance, 1BOS 3.2.1-816, to check cooldown cycle. Engine not loaded. Invalid test.
113. 01/23/87 1B DG Monthly and Semi-Annual Operability Surveillance, IBOS 8.1.1.2.a-2,4. Engine loaded for 64 minutes. Valid successful test. (55) 114. 01/26/87 1B DG Quarterly Emergency Start Surveillance,1BOS 3.2.1-816, to check cooldown cycle. Engine not loaded. Invalid test.
115. 02/10/87 1A DG Monthly Operability Surveillance, 1BOS 8.1.1.2.a-1.
Engine took 15 seconds to reach rated speed. Valid test and failure. (III) 116. 02/10/87 1A DG Monthly Operability Surveillance, IBOS 8.1.1.2.a-l.
Start time checked. Engine not loaded. Invalid test.
117. 02/25/87 1A DG start due to a spurious Safety Injection signal. Engine not loaded. Invalid test.
118. 03/01/87 1B DG Monthly Operability Surveillance, 1BOS 8.1.1.2.a-2.
Engine loaded for 70 minutes. Valid successful test. (56) 119. 03/02/87 1B DG run per SPP 87-19. Engine loaded for 75 minutes. Valid successful test. (57) 120. 03/02/87 1A DG run per SPP 87-19. Engine loaded for 61 minutes. Valid successful test. (58)
(1744M/0197M)
DATE ACTIVITY , j 1
121. 03/02/87 1B DG Quarterly Emergency Start Surveillance,1BOS 3.2.1-816. l Engine not loaded. Invalid test.
l l 122. 03/02/87 1B DG Monthly Operability Surveillance, IBOS 8.1.1.2.a-2.
I Engine loaded for 122 minutes. Valid successful test. (59) i 123. 03/03/87 1B DG Quarterly Emergency Start Surveillance, IBOS 3.2.1-816.
Engine not loaded. Invalid test.
124. 03/03/87 1B DG Modification test M5-1-86-159. Engine not loaded.
Invalid test.
125. 03/04/87 1B DG 18 Month Operability Surveillance, 1BVS 8.1.1.2.e-2.
Run terminated due to a minor Jacketwater leak. Invalid test.
126. 03/04/87 1B DG 18 Month Operability Surveillance, 1BVS 8.1.1.2.e-2.
Engine loaded for 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> and 50 minutes. Valid successful test. (60)
I 127. 03/16/87 1B DG Maintenance run. Invalid test.
128. 03/17/87 1B DG 18 Month Operability Surveillance, lbVS 8.1.1.2.e-2.
Engine loaded for 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and 42 minutes. Valid successful test. (61) 129. 03/18/87 1A DG Monthly Operability Surveillance, 1BOS 8.1.1.2.a-1.
Engine failed to reach rated speed in 10 seconds. Valid test and failure. (IV) 130. 03/19/87 1B DG 18 Month Operability Surveillance, 1BVS 8.1.1.2.f-8.
Run terminated due to Strip Chart Recorder problems. Invalid test.
131. 03/19/87 IB DG 18 Month Operability Surveillance, IBVS 8.1.1.2.f-8.
Engine not loaded. Invalid test.
132. 03/19/87 1B DG 18 Month Operability Surveillance, 1BVS 8.1.1.2.f-10.
Run terminated due to spurious alarms. Invalid test.
133. 03/20/87 1B DG 18 Month Operability Surveillance, 1BVS 8.1.1.2.f-10.
Engine not loaded. Invalid test.
134. 03/21/87 IB DG 18 Month Operability Surveillance, 1BVS 8.1.1.2.f-12. j Engine loaded for 68 minutes. Valid successful test. (62) 135. 03/23/87 1B DG 18 Month Operability Surveillance, 1BVS 8.1.1.2.f-14.
Run terminated due to a minor fuel oil leak on the 8R cylinder. Invalid test.
_g_
(1744M/0197M)
.__ _ -______-____ _ _______ - __ D
1 DATE ACTIVITY __
l l
136. '03/23/87 1B DG 18 Month Operability Surveillance, IBVS 8.1.1.2.f-14.
Engine loaded for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and 38 minutes. Valid successful test. (63) 137. 03/24/87 1B DG 18 Month Operability Surveillance, IBVS 8.1.1.2.f-14. j Emergency Shutdown Loads sequenced on and operated for 13 l minutes. Invalid test. l l
138. 03/25/87 1P DG 18 Month Operability Surveillance, IBVS 8.1.1.2.f-16. ]
Safe Shutdown Loads sequenced on and operated for 29 minutes. {
Invalid test.
139. 03/26/87 1B DG Modification test M6-1-86-292. Engine not loaded.
Invalid test.
140. 03/27/87 1B DG 18 Month Operability Surveillance, IBVS 8.1.1.2.f-20.
Surveillance terminated due to a problem with the output breaker. Breaker was not fully racked to test. Invalid test.
141. '03/27/87 1B DG 18 Month Operability Surveillance, 1BVS 8.1.1.2.f-20.
Surveillance terminated due to SX pump breaker failure to close. Invalid test.
142. 03/27/87 1B DG-18 Month Operability Surveillance, 1BVS 8.1.1.2.f-20.
Engine not loaded. Surveillance successfully completed.
Invalid test.
143. 03/27/87 1B DG Monthly and Semi-Annual Operability Surveillance, 1BOS 8.1.1.2.a-2,4. Engine loaded for 67 minutes. Valid successful test. (64) 144. 04/01/87 1A DG Quarterly Emergency Start Surveillance, 1BOS 3.2.1-806. Engine not loaded. Invalid test.
145. 04/02/87 1A DG Maintenance run. Invalid test.
I 146. 04/02/87- 1A DG Monthly Operability Surveillance, IBOS 8.1.1.2.a-l.
Engine loaded for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and 9 minutes. Valid successful test. (65) 147. 04/02/87 1A DG Quarterly Emergency Start Surveillance, IBOS 3.2.1-806.
Engine not loaded. Invalid test.
148. 04/03/87 1A DG Modification test M6-1-86-159. Engine not loaded.
Invalid test.
149. 04/04/87 1A DG 18 Month Operability Surveillance, IBVS 8.1.1.2.e-1.
Engine loaded for 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> and 12 minutes. Valid successful test. (66) 1 (1744M/0197M)
DATE ACTIVITY 150. 04/16/87 1A DG 18 Month Operability Surveillance, IBVS 8.1.1.2.e-l.
Engine loaded for 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> and 55 minutes. Valid successful l
test. (67) 151. 04/16/87 1A DG 18 Month Operability Surveillance, IBVS 8.1.1.2.f-11.
Engine loaded for 69 minutes. Valid successful test. (68) 152. 04/16/87 1A DG 18 Month Operability Surveillance, IBVS 8.1.1.2.f-9.
Engine not loaded. Invalid test.
153. 04/17/87 1A DG 18 Month Operability Surveillance,1BVS 8.1.1.2.f-7.
Engine failed to reach rated speed in 10 seconds. Valid test and failure. (V) 154. 04/17/87 1A DG Maintenance run. Invalid test.
155. 04/17/87 1A DG Maintenance run. Invalid test.
156. 04/17/87 1A DG Maintenance run. Invalid test.
157. 04/17/87 1A DG Maintenance run. Invalid test.
158. 04/17/87 1A DG Maintenance run. Invalid test.
159. 04/17/87 1A DG 18 Month Operability Surveillance; IBVS 8.1.1.2.f-7.
Surveillance successfully completed. Engine not loaded.
Invalid test.
160. 04/17/87 1A DG 18 Month Operability Surveillance, 1BVS 8.1.1.2.f-13.
Engine loaded for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and 5 minutes. Valid successful test. (69) 161. 04/22/87 1A DG 18 Month Operability Surveillance, IBVS S.I.l.2.f-19.
Engine not loaded. Invalid test.
162. 04/23/87 1A DG 18 Month Operability Surveillance, IBVS 8.1.1.2.f-13.
Engine loaded for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and 59 minutes. Valid successful test. (70) 163. 04/23/87 1A DG 18 Month Operability Surveillance, 1BVS 8.1.1.2.f-13.
Emergency Shutdown Loads sequenced on and operated for 12 minutes. Invalid test.
164. 04/23/87 1A DG 18 Month Operability Surveillance, IBVS 8.1.1.2.f-15.
Safe Shutdown Loads sequenced on and operated for 10 minutes.
Invalid test.
165. 04/24/87 1A DG Monthly Operability Surveillance, IBOS 8.1.1.2.a-l.
Engine loaded for 68 minutes. Valid successful test. (71)
(1744M/0197M)
DATE ACTIVITY 166. 04/24/87 1A DG Quarterly Emergency Start Surveillance, IBOS 3.2.1-806.
Engine not loaded. Invalid test.
167. 04/26/87 1A DG 18 Month Alternate AC Power Circuit Surveillance, 1BOS 8.1.1.1.b-1. Engine loaded for 83 minutes. Valid successful test. (72) 168. 04/26/87 1B DG Quarterly Emergency Start Surveillance, IBOS 3.2.1-816.
Engine not loaded. Invalid test.
169. 04/26/87 1B DG 18 Month Alternate AC Power Circuit Surveillance, IBOS 8.1.1.1.b-1. Engine loaded for 62 minutes. Valid successful test. (73) 170. 04/29/87 IB DG Monthly Operability Surveillance, IBOS 8.1.1.2.a-2.
Engine loaded for 72 minutes. Valid successful test. (74) 171. 04/30/87 1A DG started per the Manual Safety Injection Surveillance, IBOS 3.2.1-1. Engine not loaded. Invalid test.
172. 04/30/87 1A DG started per the Manual Safety Injection Surveillance, IBOS 3.2.1-1. Engine not loaded. Invalid test.
173. 05/01/87 1A DG Monthly Operability Surveillance,1BOS 8.1.1.2.a-l.
Engine loaded for 71 minutes. Valid successful test. (75) 174. O!/01/87 IB DG started per the Manual Safety Injection Surveillance, IBOS 3.2.1-1. Engine not loaded. Invalid test.
175. 05/09/87 1A DG Monthly Operability Surveillance, IBOS 8.1.1.2.a-l.
Engine loaded for 69 minutes. Valid successful test. (76) i 176. 05/12/87 IB DG Monthly Operability Surveillance, 1BOS 8.1.1.2.a-2.
Engine loaded for 70 minutes. Valid successful test. (77) 177. 05/16/87 1A DG Monthly Operability Surveillance, IBOS 8.1.1.2.a-1.
Engine loaded for 69 minutes. Valid successful test. (78) 178. 05/23/87 1A DG Monthly Operability Surveillance, 1BOS 8.1.1.2.a-l.
Engine loaded for 71 minutes. Valid successful test. (79) 179. 05/31/87 1A DG Monthly Operability Surveillance,1BOS 8.1.1.2.a-1.
Engine loaded for 67 minutes. Valid successful test. (80) 180. 06/05/87 1A DG Monthly Operability Surveillance, 1BOS 8.1.1.2.a-1.
Engine loaded for 72 minutes. Valid successful test. (81) 181. 06/11/87 IB DG Monthly Operability Surveillance, IBOS 8.1.1.2.a-2. 1 Engine loaded for 71 minutes. Valid successful test. (82)
(1744M/0197M)
=
. s i 1
1 DATE ACTIVITY 1
182. 06/12/87 1A DG Monthly Operability Surveillance,1BOS 8.1.1.2.a-1.
Engine loaded for 69 minutes. Valid successful test. (83) l 183. 06/15/87 1B DG Maintenance run. Invalid test.
l 184. 06/19/87 1A DG Monthly Operability Surveillance, 1BOS 8.1.1.2.a-1. !
Engine loaded for 81 minutes. Valid successful test. (84) 185. 06/25/87 1A DG Monthly Operability Surveillance,1BOS 8.1.1.2.a-1.
Engine loaded for 70 minutes. Valid successful test. (85) ]
j 186. 07/03/87 1A DG Monthly Operability Surveillance, 1BOS 8.1.1.2.a-1. {
Engine loaded for 70 minutes. Valid successful test. (86) 187. 07/10/87 1A DG Monthly Operability Surveillance, IBOS 8.1.1.2.a-1.
Engine loaded for 75 minutes. Valid successful test. (87) 188. 07/14/87 1B DG Monthly Operability Surveillance, IBOS 8.1.1.2.a-2.
Engine loaded for 69 minutes. Valid successful test. (88) 189. 07/17/87 1A DG Monthly Operability Surveillance, IBOS 8.1.1.2.a-l.
Engine loaded for 69 minutes. Valid successful test. (89) 190. 07/24/87 1A DG Monthly Operability Surveillance, IBOS 8.1.1.2.a-l.
Engine loaded for 78 minutes. Valid successful test. (90) 191. 08/12/87 1A DG start due to Safety Injection Signal. Engine run unloaded for 17 minutes. Invalid test.
192. 08/12/87 1B DG start due to Safety Injection Signal. Engine run unloaded for 17 minutes. Invalid test.
193. 08/14/87 1B DG Monthly Operability and Quarterly Emergency Start Surveillance. Engine manually tripped due to Governor hunting. Valid test and failure. (VI) 194. 08/14/87 IB DG Maintenance run. Invalid test.
195. 08/14/87 IB DG t?aintenance run. Invalid test.
196. 08/14/87 1B DG Maintenance run. Invalid test.
197. 08/14/87 1B DG Monthly Operability Surveillance, 1BOS 8.1.1.2.a-2.
Engine loaded for 70 minutes. Valid successful test. (91) 198. 08/17/87 1A DG Quarterly Emergency Start test, 1BOS 3.2.1-806. Engine not loaded. Invalid test.
l l
l (1744M/0197M)
I
'l DATE ACTIVITY . . ,
a 199. 08/24/87 1A DG Monthly Operability Surveillance, IBOS 8.1.1.2.a-l.
Engine loaded for 68 minutes. Valid successful test. (92) l 200. 08/24/87 1A DG Crosstie Capability Check. ' Engine not loaded. Invalid test.
201. 09/14/87 1B DG Monthly Operability Surveillance, 1BOS 8.1.1.2.a-2.
Engine loadsd for 67 minutes. Valid successful test. (93) 1A DG Monthly Operability Surveillance, IBOS 8.1.1.2.a-1. l 202. 09/24/87 Engine shutdown 48 minutes into the loaded run due to fuel oil leak. Valid test and failure. (VII) l 1
l l
l l
1
( (1744M/0197M) l