ML20238D670

From kanterella
Jump to navigation Jump to search
Limited Appearance Statement by J Diringer Opposing Util Proposal to Increase Storage Rack Capacity
ML20238D670
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 06/15/1987
From: Diringer J
AFFILIATION NOT ASSIGNED
To:
References
OLA, NUDOCS 8709110313
Download: ML20238D670 (1)


Text

. _ _ _ -

JOEL DIRINGER Attomey at law 2475 Johnson Avenue y

San Luis Obispo, California 93401 (805) 544-1037

,07 JUL 19 p3 t4 PRO.&

i 7 C,

,dM/

June 15, 1987 Diablo Canyon Board Nuclear Regulatory Commission Washington, DC 20555 RE: Opposition to storage capacity increase Gentlemen:

I am writing in opposition to PG&E's bid to increase its storage rack capacity.

I waited for 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> today to speak directly to you at the hearings at the San Luis Bay Inn, but was unable to do so due to the crowds joined in opposition to this folly.

Given the recent discovery of yet an additional earthquake fault near Diablo, and the draft report of the Brookhaven National Laboratory calculating the catastrophic consequences of PG&E's design, I urge you to deny the request to increase the storage capacity.

I used to live in Pismo Beach, just downwind from Diablo. We moved when the plant was opened since I did not wish to risk my.

or my family's life.

Now, in San Luis Obispo, threatened by Diablo - a power plant we do not want or need.we are again being Enough is enough.

Sincerely,

/ -) L'

>fl.o u7l'

/Joel Diringer __

B709110313 870615 PDR ADOCK 05000275 T

PDR

'