Responds to NRC Re Violations Noted in Insp Rept 50-366/87-26.Corrective Actions:Operations Dept Personnel Counseled & Computer Program to Track Review Performance Revised
ML20238C686
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 12/28/1987
From: Gucwa L
GEORGIA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
SL-3869, NUDOCS 8712310155
Download: ML20238C686 (4)


Text

- -

Georg!a Fbwer Company 333 Pmdmont Avenue

  • Atlanta, Georgia 30308 Teiephone 404 526 6526 Mamng AddresE Post office Box 4545 At: ants, Georgia 30302 h

Georgia Power L T. Gucwa l' "U ' 41*"' " "" l' C V'l"'"

Manager Nuclear Safety and Licensing 1846C X7GJ17-H120 December 28, 1987 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Hashington, D. C.

20555 PLANT HATCH - UNITS 1, 2 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 RESPONSE TO INSPECTION REPORT 87-26 Gentlemen:

In accordance with the provisions of 10 CFR 2.201, Georgia Power Conpany (GPC) is providing the enclosed response to your November 18, 1987 letter, which transmitted the Notice of Violation associated with the inspection conducted on September 26 - October 26, 1987 at Plant Hatch by Messrs.

P. Holmes-Ray and J. Menning.

A copy of this response is being provided to NRC Region II for review.

In the enclosure, transcription of the NRC violation precedes GPC's response.

If you have any questions in this regard, please contact this office at any time.

Sincerely, WW L. T. Gucwa JCJ/lc

Enclosure:

Transcription of Violation 87-26-01 and GPC Response c:

(see next page)

FEP(

8712310155 871228 I

PDR ADOCK 05000366 i

a DCD

k Georgia Potver n U. S. Nuclear Regulatory Commission December 28, 1987 Page Two c: Georaia Power Company Mr. J. P. O'Reilly, Sr. Vice President - Nuclear Operations Mr. J. T. Beckham, Jr., Vice President - Plant Hatch GO-NORMS U. S. Nuclear Regulatory Commission. Washington. D. L Mr. L. P. Crocker, Licensing Project Manager - Hatch U. S. Nuclear Regulatory CommissLon. Reaion II Dr. J. N. Grace, Regional Administrator Mr. P. Holmes-Ray, Senior Resident Inspector - Hatch 1846C

k Georgia Power h ENCLOSURE PLANT HATCH - UNITS 1, 2 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 TRANSCRIPTION OF VIOLATION 87-26-01 AND GPC RESPONSE TRANSCRIPTION OF VIOLATION 87-26-01 Technical Specification 6.8.1.a requires the licensee to establish, implement and maintain written procedures covering the applicable activities in Appendix A of Regulatory Guide 1.33, Revision 2,

February 1978.

Appendix A of Regulatory Guide 1.33, paragraph 1, I

recommends procedures for equipment control (e.g.,

locking and

^

l tagging).

1 I

I Licensee procedure 30AC-0PS-001-0S, " Control of Equipment Clearances and Tags", establishes requirements for the control and periodic review of equipment tags.

Section 8.13.1 of this procedure requires that Caution Tag Index/ Audit Sheets be reviewed monthly.

I Contrary to the above, the licensee failed to conduct reviews of the l

Unit 2 Caution Tag Index/ Audit Sheets during the months of May, June l

and September of 1987.

i This is a Severity Level V violation (Supplement I).

J RESPONSE TO VIOLATION 87-26-01 Admission or denial of violation:

The events occurred as stated in NRC Notice of Violation 87-26-01.

Reason for the ylolatiqu:

The violation occurred due to Operations Department supervisory personnel failing to follow procedure 30AC-0PS-001-05, " Control of Equipment Clearances and Tags".

Step 8.13.1 of the above mentioned procedure requires a

monthly review to be conducted on all outstanding clearance and cautiun tags.

While the reviews of outstanding cleat antes wie conducted as required, the reviews of I

caution tags were not performed fer the months of May, June and September of 1987.

1846C E-1 12/28/87 SL-3869

" Georgia Power d ENCLOSURE (Continued)

TRANSCRIPTION OF VIOLATION 87-26-01 AND GPC RESPONSE A contributing factor to the violation.was that prior to October.

20, 1987, the computer printout which is' used to initiate the performance of the required reviews stated " monthly audit of clearance-index and clearances".

'This apparently-led the Operations Department supervisory personnel-to.the erroneous, conclusion that only a review of clearances was required.

Corrective steos which have been taken and the results achieved:

The appropriate Operations Department personnel were counselled regarding this item and' the consequences of failing to follow-procedures.

The computer program which tracks the performance. of reviews required by procedure 30AC-0PS-001-0S has been modified.such that the printout now clearly indicates that monthly reviews of both clearances and. caution tags are required.

The data base was Lalso reviewed for any similar inadequacies although none were identified, t

)

All reviews required by 30AC-0PS-001-0S since.the violation was' i

identified have been satisfactorily performed.

j Corrective stens which will'be taken to avoid further violations:

No further corrective actions are required.to prevent recurrence.

)

l Date when full comoliance will be achieved-I He are currently in full compliance with the requirements.

i I

1846C E-2 12/28/87 SL-3869 1

u m