ML20238C615

From kanterella
Jump to navigation Jump to search

Forwards Comments on NRC That Provided Results of Regulatory Effectiveness Review of Plant Safeguards Program. Comments Withheld (Ref 10CFR73.21)
ML20238C615
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 09/01/1987
From: Gucwa L
GEORGIA POWER CO.
To:
Office of Nuclear Reactor Regulation
References
SL-3144, TAC-64966, TAC-64967, NUDOCS 8709100252
Download: ML20238C615 (2)


Text

Georgia fbwer Cornpany

~

333 Pie 0mont Avenue Atlanta, Georgia 30308 Telephons 404 526-6528

. Mailing Address:

Fbst Office Box 4545 Atlanta, Georgia 30302 Georgia Power L T. Gucwa

    1. N#"

Manager Nuclear Safety and Licensin0 SAFEGUARDS INFORMAJ10N ENCLOSURE CONTAINS SAFEGUARDS INFORMATION, UPON SEPARATION THIS PAGE.IS DECONTROLLED.

SL-3144

.l 1648C-X7GJ17-H770 September.1, 1987 1

U. S. Nuclear Regulatory Commission Director of Nuclear Reactor Regulation J

Washington, D. C.

20555 PLANT HATCH - UNITS 1, 2 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 RESPONSE TO REGULATORY EFFECTIVENESS REVIEW l

Gentlemen:

NRC's letter of June 24, 1987, provided the results of a Regulatory i

Effectiveness Review (RER) of the Plant Hatch safeguards-pr_ogram.

This report noted that "...While a number of strengths were observed in the safeguards program, certain safeguards matters were found that warrant further consideration.

Accordingly, it is requested that you provide 1

comments relative to those areas indicated as needing attention...".

l Georgia Power Company (GPC) hereby provides, as an enclosure, the requested response.

The enclosure contains Safeguards Information, and, in accordance with 10 CFR 73.21, should be protected against unauthorized disclosure.

d If you have any questions in this regard, please contact this office at any time.

Sincerely,

)

  1. +2 L. T. Gucwa REB /lc Y

I

Enclosure:

(see next page)

SOCI i

%\\g 8709100252 870901 P

SAFEGUARDS INFORMATION PDR-ADOCK 05000321, ENCLOSURE CONTAINS-SAFEGUARDS-F --

PDR INFORMATION, UPON SEPARATION THIS PAGE IS DECONTROLLED.

k Georgia Power n U. S. Nilclear Regulatory Commission September 1,1987 Page Two

Enclosure:

GPC Response to NRC Regulatory Effectiveness Review c:

Georaia Power Comoany Mr. J. P. O'Reilly, Sr. Vice President - Nuclear Operations w/o Mr. J. T. Beckham, Jr., Vice President - Plant Hatch w/o Mr. J. H. Lukehart, Manager - Nuclear Security GO-NORMS w/o 1

U. S. Nuclear Regulatory Commission. Washinaton. D. C.

[

Document Control Deck, USNRC w/o Director of Inspection and Enforcement, USNRC Mr. L. P. Crocker, Licensing Project Manager - Hatch w/o

^

U. S. Nuclear Reaulatory Commission. Reaion II l

Dr. J. N. Grace, Regional Administrator

~~

Mr. P. Holmes-Ray, Senior Resident Inspector - Hatch 1648C 700775

e e.-.'

W

.::t enQ 4 i

O O'

M i

Z en D

<-E

_ _ - _ _ _ _ _ - - - -