ML20238C379
| ML20238C379 | |
| Person / Time | |
|---|---|
| Site: | 07003041 |
| Issue date: | 12/08/1987 |
| From: | Halpaus P INTERNATIONAL FREIGHT FORWARDERS, INC. |
| To: | Macdonald C NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| References | |
| 28885, 3212D, NUDOCS 8712300240 | |
| Download: ML20238C379 (2) | |
Text
_
. d 17c) - O 3d 'Y//CO K '
RETURN TO 396-SS
'7jdf[
IFF,Inc.
International Freight Forwarders f
' 2690 Cumberland Parkway, Suite 414 -
Atlanta, Georgia 30339
\\\\\\
///
(404) 434-3977. Telex (WU) 543586 IFFATL MF FMC #2652 os e
December 8, 1987 N
j RECElygf.
U 3.h c Nl f i
Nuclear Regulatory Commission h,\\
TDRy M e,
Washington, D. C. 20555
/
,N I p g \\
Attn: Mr. Charles E. MacDonald, Chief Transportation Branch Division of Safeguards-and Transportation, NMSS Ref:
Safeguard - Route approval See enclosure
Dear Mr. MacDonald:
We have to ask you for the extension of the enclosed route approval for 1988 in the name of our German client, KFA, Juelich.
Thank you in advance for your prompt response.
Sincerely yours, 1,
d I
/
5 if r
C
?,
Pe kr 1 aus
~
5 Id a
k.
,D.s PH/sf
~j Encl.
,u e
o m
POCKETED DEC231987.Y b p'ritmTr"~^{"DC{'-
94 d
tCChsI16'6 2
N G
y4flnou
_L~po<f pocket CLERX
%j g
u.a t
- v)g 8712300240 871200 PDR ADOCK 07003041 C
PDR Agents all over the World
4 e
i 1
1 l
l
.i l
.i D.L [. ) G.
d_
M /f cana nunz
/S All?
wa uca. _ _ /s_._2_2' 1
f
_ ep a
ee l
ls t ', c,c i
l
.r
- I N
E' s I
. mg s T "
!': s ILaU - -.. _
vit/2 3/7 a x t
i 1
_-.--.a
h O A ". 7 '1 _. A "4 M Ti
~
' W A"
O \\
l 0M jya.MTJ0
, U wTy n vm
~
'f ucg k
UNITED STATES
[
g NUCLEAR REGULATORY COMMISSION 5
j WASHINGTON, D. C. 20555
\\***,./
APR 2 8 887 SGTB:CRH 07000304070R International Freight Forwarders ATTN:
Mr. Peter Halpaus President 2690 Cumberland Parkway, Suite 414 I
Atlanta, Georgia 30339 Gentlemen:
This is in regard to your request for approval of a route to be used for transport of spent reactor fuel as contained in your letter of December 29, 1986.
The route, as amended in the enclosure, fran the Port of Savannah, Garden City, 4
Georgia to the Department of Energy Savannah River Plant, Aiken, South Carolina l
requested in your letter is judged to meet the regulatory requirements in accordance with 10 CFR 73.37 for shipments of spent fuel under general import and is approved through December 31, 1987.
In the event your carrier is j
required to deviate from the approved route, please call the contact listed on page two of this letter as soon as possible providing the details.
Arrangements with law enforcement agencies along the route have been completed by the NRC staff. Data relating to these arrangements and a copy of the approved route are enclosed. This information is to be incorporated into your shipment plans and provided to your carrier along with instructions regarding its use.
Please note that assuring highway safety is the responsibility of the i
licensee and carrier and our approval is not intended to provide relief in this regard.
During seasonal periods when inclement weather with accompanying hazardous road conditions can occur with short notice, the appropriate state police should be contacted with regard to road conditions before a shipment commences.
Please note that the notification requirements of 10 CFR 73.37(f) and 73.72 for each shipment still apply. When making a notification to a governor or his designee, it should be very specific especially with regard to notification of series shipments.- Written-notification must designate. exactly _ how many_ _ _
individual shipments are to be included.
In the event the number of shipments in a series is revised, the change notification should indicate that it is UPON NEMOVAL GF ATTACHENT TliiT,0000ENT is*-
Datument Transmitted Herewith
.Contains Safeguards information W6
^ Med a
(1 l,r
,p O A
~ ~.7 A 7nO I \\1
'" 9 '311 A ~l P %l WM TJ.M T 20~l 11 T LN IV 1'
Mr. Peter Halpaus APR 2 81987 -
a revision of the original notification and an increase or decrease in the number of shipments.
In addition, the change notification should specify that the information for any of the shipments.in the revised series may not be decontrolled until ten days after the arrival at the destination of the last inipment in that series.'
Should you require additional information or have questions concerning this matter, please contact Charles Hillman of my staff at.(301) 427-4220.
Sincerely, M ea Charles E. MacDonald, Ch ef Transportation Branch Division of Safeguards and Transportation, NMSS
Enclosures:
As stated L..
070-o30 twoo4 r/o-304/
l Docket No.
$/ Ob TO: - William O. Miller. License Fee Management 8 ranch
SUBJECT:
MATERIALS LICENSE AMEN 0 MENT C1. OSSIFICATION APPLICANT:
h(
1 License No:
a nes [
__ Fee Category: bd4hte
!j Application Dated: /d - 7"M h Received:/M~f' I
1.
The above application for amendment has been reviewed by NMSS/ REGIONAL OFFICE in accordance with 5170.31 of Part 170; I!
and will require an amendnent to the Ifcense.
2.
The application is not subject to fees because it was filed Cl (a) pursuant to written NRC request-and the amendment is being issued for the convenience of the Commission, et or (b)
Other (State reason) 1
(
R
/M. M i
~
~
~
si,n.ture.
'&w to;irrp0 a.t.
5 e
a
..4,,,,,,,,,,.....-,.
4g.
i i
$