Requests Extension from 880115 to 880215 to Respond to IE Bulletin 87-002, Fastener Testing to Determine Conformance W/Applicable Matl Specs. Delay Based on Sample Selection Taking Place Approx 3 Wks After Receipt of Bulletin
ML20238C268
Person / Time
Site: Davis Besse 
Issue date: 12/21/1987
From: Shelton D
TOLEDO EDISON CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
1-771, IEB-87-002, IEB-87-2, NUDOCS 8712300160
Download: ML20238C268 (1)


Text

TOLEDO

%mmEDISON DONALD C. SHELTON ve.er.a m -tua.c Docket No. 50-346 License No. hTF-3 Serial ho. 1-771 December 21, 1987 United States Nuclear Regulatory Commission Document Control Desk Washington, D. C.

20555

Subject:

Extension Request - NRC Compliance Bulletin 87-02

Dear Mr. Davis:

On November 16, 1987 Toledo Edison receivad the NRC compliance Bulletin 87-02, Fastener Testing To Determine Conformance With Applicable Material Specifications, dated November 6, 1987 (Log 1-1699).

The Bulletin requested licensees to provide a response within-60 days of receipt of the Bulletin. Toledo Edison received the Bulletin on November 16, 1987, therefore th'e response was scheduled to be submitted by January 15,-1988.

However, the Bulletin required the sample of'non-safety related.

and safety related fasteners and nuts to be selected by the licensee with the participation of an NRC inspector. The NRC resident. inspector received guidance on the sample selection criteria on approximately December 2, 1987. This resulted in the sample s' election taking place approximately 3 weeks after" receipt of the Bulletin. Based on this, Toledo Edison will provide the response by February 15, 1988.

Very t l'y yours,

^

p CS:JS:bam cc:

'A.

B. Davis, Regional Administrator A. W. DeAgazio DB-1 NRC Resident Inspector 8712300160 gygggg

~

gDR ADOCK 05000346 [-