ML20238B406

From kanterella
Jump to navigation Jump to search
Discusses 870805 Telcon Re Region I Plan to Administer NUREG-1021-ES-601 Requalification Audit Exam,Per Requirement of 10CFR55.57, Renewal of Licenses, at Facility in First Quarter of 1988.Exemption from Ref Exam Requested
ML20238B406
Person / Time
Site: Crane Constellation icon.png
Issue date: 08/26/1987
From: Standerfer F
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
RTR-NUREG-1021 4410-87-L-0128, 4410-87-L-128, NUDOCS 8709010204
Download: ML20238B406 (3)


Text

_ - _ _ _ - - _ _ - - - _ _ - _ _ _ _ _ - _ _ _ _ _ _ _ - _ _

er 1

GPU Nuclear Corporation E - Nuclear

=orar8o Middletown, Pennsylvania 17057 0191 717 944 7621 TELEX 84 2386 Writer's Direct Dial Number:

j (717) 948-8461 4410-87-L-0128 Document ID 0215P August 26, 1987 i

US Nuclear Regulatory Commission i

Attn: Document Control Desk

}

Washington, DC 20555 i

Dear Sirs:

Three Mile Island Nuclear Station, Unit 2 (TMI-2)

Operating License No. DPR-73 Docket No. 50-320 10 CFR 55.11 Exemption Request On August 5,1987, during a telephone conversation with Mr. W. Thompson, TMI Operator Training Manager, Mr. B. Norris, NRC Region I Reactor Engineer Examiner, indicated that NRC Region I was planning to administer a j

NUREG-1021-ES-601 Requalification Audit Examination, per the requirement of 10 CFR 55.57, " Renewal of Licenses," at TMI-2 in the first quarter of 1988.

As discussed with Mr. Norris, it is the opinion of GPU Nuclear that conduct of the examination as proposed may not be the most effective utilization of NRC or GPU Nuclear resources based on the following information:

o Currently, the TMI-2 Reactor Vessel is being defueled with a projected completion date of third quarter of 1988.

o TMI-2 Technical Specification Change Request (TSCR) 53, submitted to the NRC via GPU Nuclear letter 4410-87-L-0042 dated April 23, 1987, requests elimination of TMI-2 Technical Specific 9 tion requirements for licensed operators upon completion of the TMI-2 defueling program. Thus, if TSCR 53 is approved, GPU Nuclear anticipates that.

the requirements for licensed operators at TMI-2 will be deleted within the same year as the proposed examination date.

8709010204 870026 gDR ADOCK 05000320 Y

PDR GPU Nuclear Corporation Is a subsidiary of the General Public Utilities Corporation

)

Document Control Desk' August 26, 1987

~

4410-87-L-0120 Thus, pursuant to 10 CFR 55.11, " Specific Exemption," GPU Nuclear requests an exemption from the referenced examination which is presently scheduled for first quarter of 1988.

Sincerely, mudd $7' j

F. R. Standerfer Director, TMI-2 j

FRS/RDW/eml Attachment cc: Section Chief - Reactor Projects Section 1C, Mr. R. M. Keller Chief - Projects Branch I, Mr. H. B. Kister Regional Administrator, Region 1 - W. T. Russell Director, TMI-2 Cleanup Project Directorate - Dr. W. D. Travers l

l l

b ) [I].

V c. it(;

?,' $ Q (>

1 l

l

1 I

l l

i l

i 4

4 l-d3SllM Oh 6 V SG-0BHSD

_ _.