Informs of Intention to Reduce Reporting Frequency for Groundwater Monitoring Program (Gmp) Results from Quarterly to Annually.Util Proposes to Include Results of Gmp in Annual Environ Monitoring Program Rept
ML20238B384
Person / Time
Site: Crane Constellation icon.png
Issue date: 08/26/1987
From: Standerfer F
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
4410-87-L-0130, 4410-87-L-130, NUDOCS 8709010197
Download: ML20238B384 (3)


Text

__

i GPU Nuclear Corporation

. Nuclear

=, ors =48o Middletown, Pennsylvania 17057-0191 717 944 7621 TELEX 84 2386 Writer's Direct Dial Number:

J (717) 948-8461 4410-87-L-0130 Document ID 0139P 1

August 26, 1987 Document Control Desk US Nuclear Regulatory Commission l

Washington, DC 20555 i

Dear Sirs:

Three Mile Island Nuclear Station, Unit 2 (TMI-2)

Operating License No. DPR-73 Docket No. 50-320 Unit 2 Groundwater Monitoring Program The purpose of this letter is to inform you that GPU Nuclear intends to reduce the reporting frequency for groundwater monitoring program results from quarterly to annually.

During March and April 1980, groundwater monitcring wells were drilled at predetermined locations around TMI-2 to monitor for radioactively contaminated water which may hWe entered the groundwater due to leakage from the TMI-2 Reactor Building. Monthly reports were originally sent to the Pennsylvania Department of Environmental Resources. As of February 1981, these reports also were sent to the Nuclear Regulatory Commission (NRC) due to an increase in the indicated groundwater tritium concentration. This increase was later traced to leakage from the Borated Water Storage Tank (BWST).

After resolving the BWST leakage, a downward trend in the tritium concentration was found in the groundwater munitoring wells. Based on this trend, the periodicity of the Groundwater Monitoring Report was reduced from monthly to quarterly in August 1983.

Over the past four (4) years, the results of groundwater monitoring have remained stable, processing of the accident generated water has reduced the source term of the water, and draining the Reactor Building basement has lowered the motive force for water movement out of the Reactor _ Building.

Thus, GPU Nuclear believes that sufficient justification exists to reduce the reporting frequency to a single annual report.

GPU Nuclear proposes to include results of the Groundwater Monitoring Program in the Annual Radiological Environmental Monitoring Program Report (REMP Report) required by GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation 8709010197 870826

^

D PDR ADOCK 05000320

\\

i i

P PDR

j

" ~ Document Control Desk August 26, 1987 4410-87-L-0130 Technical Specification 5.6.1.A.(2), Appendix B of the TMI-2 License.

In the event that a significant increase in groundwater tritium concentrations should occur, GPU Nuclear will report the monitoring results to the TMI Cleanup l

Project Directorate on a timely basis.

l l

Sincerely, ed Q

F. R. Standerfer Director, THI-2 FRS/DHW/eml cc: Regional Administrator - Region 1, Dr. W. T. Russell Director - TMI-2 Cleanup Project Directorate, Dr. W. D. Travers J