Text
,,4[
UNITED STATES g
g NUCLEAR REGULATORY COMMISSION
- j W ASHINGTON, D. C. 20555
%...../
i DUQUESNE LIGHT COMPANY OHIO EDIS0N COMPANY PENNSYLVANIA POWER COMPANY DOCKET NO. 50-334 BEAVER VALLEY POWER STATION, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.113 License No. DPR-66 1.
The Nuclear Regulatory Commission (the Comission) has found that:
A.
The application for amendment by Duquesne Light Company, et al.
(the licensee), dated February 10, 1987 and supplemented by letter dated April 10, 1987 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 l
of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-66 is hereby amended to read as follows l
l l
l 8709010073 070827 PDR ADOCK 0500 4
P
_._______-___-_a
. (2) Technical Specifications The Technical Specifications contained in Appendices A, as revised through Amendment No.113 are hereby incorporated in the license. The licensee shall operate the facility in accor4.ce with the Technical Specifications.
3.
This amendment is effective on issuance, to be implemented no later thm.
30 days after issuance.
FOR THE NUCLEAR REGULATORY COMMISSION-r, o z, Director rojtetDirectorateI-ision of Reactor Projects I/II
Attachment:
Changes to the Technical Specifications Date of Issuance: August 27, 1987
ATTACHMENT TO LICENSE AMENDMENT N0.113 FACILITY OPERATING LICENSE NO. DPR-66 DOCKET NO. 50-334 Replace the following pages of the Appendix A Technical Specifications with I'
the enclosed pages. The revised pages are identified by amendment number and contain vertical' lines. indicating the area of change.
.{
i Remove Insert i
3/4 3-42 3/4 3-42 i
3/4 3-63 3/4 3-63 q
l j
l i
l l
l l
1
\\
i 1
l l
+
I TABLE 3'.3-8' j
METEOROLOGICAL MONITORING INSTRUMENTATION INSTRUMENT MINIMUM MINIMUM INSTRUMENT ACCURACY OPERABLE 1.
WIND SPEED a.
Nominal Elev. 500' i O.5 mph
- Any
]
b Nominal Elev. 150' i 0.5 mph
- 3 of 6'_
l c.
Nominal Elev. 35' 1 0.5 mph *
.)
2.
WIND DIRECTION 1
l a.
Nominal Elev. 500' i 5*
Any 4
b.
Nominal Elev. 150' 1 5' 3 of 6 l
1 i
1 c.
Nominal Elev. 35'
+ S*
3.
AIR TEMPERATURE AT a.
AT Elev. 500' -
1 0.1*C
-Any 1 0.l*C 2 of 4 l
b.
AT Elev. 150' 1
)
l l
- Starting speed of anemometer shall be < 1 mph.
l a
j 1
i BEAVER VALLEY - UNIT 1 3/4 3-42 Amendment tio. 113 l
7 l
l' j
TABLE 3.3-13,.(Cont'd).
TABLE NOTATION
-With the number of channels OPERABLE less-than ACTION 27 required' by the' Minimum Channels OPERABLE requirement, the. contents of' the tank may be released Lto the-environment provided.that prior to initiating ~ the-release:
1.
/.t least' two independent samples of the tank contents are analyzed,.and at least -two. technically qualified members'of
?
the facility staff independently verify. the release rate i
l calculations and discharge valve lineup.
or i
2.
Initiate continuous monitoring with a. comparable alternate
)
monitoring channel.
Surveillance. Requirements applicable to the inoperable channel shall apply to the' comparable alternate
.]
monitoring channel.
when used to satisfy this technical.
I j
specification requirement.
i Otherwise,- suspend release of radioactive effluents via this-i pathway.
With the numbe::
of channels OPERABLE less than ACTION 28 required by the Minimum' Channels OPERABLE requirement, effluent releases via this pathway may continue provided the flow rate is estimated at least once per j
J 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
With the number. of channels OPERABLE less than
]
ACTION 29 required by the Minimum Channels OPERABLE requirement, effluent releases via this pathway may-continue provided:
1.
Grab samples are taken at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> and these samples are analyzed for gross activity within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, i
or J
2.
Initiate continuous monitoring with a
comparable alternate monitoring channel.
Surveillance Requirements applicable to the inoperable channel shall apply to the comparable alternate monitoring channel when used to satisfy this technical specification requirement.
With the number of channels OPERABLE less than ACTION 30 required by Minimum Channels OPERABLE requirement, immediately suspend PURGING of Reactor Containment-via this pathway if both RM-VS-104A and B are not operable with the purge / exhaust system in service.
BEAVER VALLEY - UNIT 1 3/4 3-63 Amendment No.%113
!