Advises That Final Design of 861008 Ambrosia Lake Preliminary Design Currently Under NRC Review.Design Submitted by DOE on 870514
ML20238A436
Person / Time
Issue date: 08/31/1987
From: Gonzales R, Hawkins E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
REF-WM-67 NUDOCS 8709090297
Download: ML20238A436 (1)


Text

- _ _ _ _ _ _ _ _ _ _ _ _ _

DISTRIBUTION Docket File WM-067

'PDR/DCS..

WM-067/ROG/87/08/28/0 DBangart, RIV RGonzales LLW Branch, WMLU URF0 r/f i

AUG 311987 l

l URF0:ROG l

Docket No. WM-067 040WM067100E MEMORANDUM FOR:

Docket File No. WM-067 FROM:

Ray O. Gonzales, Project Manager Licensing Branch 1 Uranium Recovery Field Office, Region IV

SUBJECT:

REVIEW 0F THE AMBROSIA LAKE PRELIMINARY DESIGN On October 8,19'6, we received three sets of the following documents o

concerning the Ambrosia Lake RAP from MK-Ferguson Company:

1.'

Main Construction Subcontract Documents, AMB-4.

2.

Calculations Documents Volumes I, II and III.

These documents were denoted as Preliminary Design Documents, with final designs to be forthcoming in the future.

Since these documents were of a preliminary nature, based on assumed conditions and parameters rather than actual field data, it was determined that our review would be delayed until the final design was received.

The final design submitted by DOE on May 14, 1987, is currently under NRC review.

/

B709090297 870831 Ry Gonzales, Project Manager PDR WASTE i

sing Bra h1 WM-67 PDR Uranium Re ery Field Office Region IV is/

Approved by:

Edward F. Hawkins, Chief Licensing Branch 1 Uranium Recovery Field Office, Region IV Case Closed: