V, SEF e ;ggy j' &-
The Honorable Robert C. Byrd United States Senate Washington, DC 20510
Dear Senator Byrd:
L I have been requ.ested to respond to your letter of July 31, 1987, to 2
Mr. Carlton C. Kammerer, Director for State, Local and Indian Tribe Programs, in which you requested a report on the licensing of the Seabrook Nuclear Station.
Currently, Public Service Company of New Hampshire (PSNH) has a license to load fuel in Seabrook Nuclear Station, Unit 1, and to run precritical tests. PSNH seeks to obtain a full-power operating license. The first step is to obtain a license that will permit PSNH to operate the nuclear plant up to.5-percent-power and to perform certain startup tests. The second step is to obtain a full-power operating license that will permit PSNH to commercially operate the nuclear plant to generate power. The latter step is what Mr. Gates, your constituent, hopes will be achieved without delay.
To obtain a 5-percent-power license, PSNH is required to submit to the Comission a bona fide utility emergency preparedness plan that covers the Massachusetts portion of the Seabrook plant's emergency plancing zone (EPZ). PSNH has indicated it will submit such a plan in mid-September 1987. The Commission will consider the plan along with any coments the Commission may receive from parties to the Seabrook proceedings.
If the Commission renders a decision favorable to PSNH, the Commission could authorize the issuance of a 5-percent power license.
To authorize issuat.w of a fd-power license, a number of matters have to be completed. One matter is that hearings on the New Hampshire emergency preparedness plans for the Seabrnnk cite must be held by the Atomic Safety and Licensing Board (ASLB). FThe hearings on the New Hampshire emergency plan are scheduled to commence on September 28, 1987 and will probably take a number of months to complete. Another matter is that the utility's emergency plan for Massachusetts must be reviewed by the Federal Emergency Management Agency and the NRC, and may also be the subject of litigation before the ASLB. Such review and litigation must be completed with findings favorable to PSNH prior to issuance of a full-power license.
l 870?OBO469 870902 DR ADOCK 050 3
s--
o-4 p
The OonoraMe Robert C. Byrd -In summary, there are a number of licensee actions and regulatory approvals required bei re the Seabrook plant can be granted a full-power operating 11renhe.
I trust that this information.is responsive to your request. If I i
may be. of any further assistance please contact me.
1 Sincerely, P g g Original 8 I yict.op 5t0110 Victor Stello, Jr.
Executive Director for Operations i
DISTRIBUTION:
I Docket. File NRC PDR-LOCAL PDR.
ED0 #003086-
-EDO R/F T.Murley/J.Sneizek
~Miraglia
'PDI-3 R/F SVarga (2)
BBoger I
VNerses i
OGC-Bethesda GPA/CA (3)
SECY (3)
VStello RStarostecki JFunches JBlaha DMossburg
- See Previous Concurrences 0FC
- ACTDIR/PDI-3: ARM /PPMB*
- AD/DRP*
- D/DRP*
- ADPR*
- D/DIR/NRR
/NRR I
h ____.
j NAME :VNerses:1m : Tech Ed
- BBoger
- SVarga
- TMiraglia
- JSniezek urley
{
DATE :08/ /87
-:08/ /87
- 08/ /87
- 08/ /87
- 08/ /87
- 08/ /87
- 08
/87 1
0FFICIAL RECORD COPY f
i A
h of
.OFC- :GPA/CA.l.,..__
y::E, NAME :
MVI 3/____}ello p
lDATE:06/f/87
- 08 87 a0847f/87
'0FFICIAL RECORD COPY
~
i l
(_
FROM DATE OF DOCUMENT DATE RECEIVED NO l
Sen" Rotert C. Byrd
-07/31/87 08/10/87.
~6d'3086 UTH MEMO RE PO8tT OTHER XX TO OR IG.
CC OTHER
{
'0CA DATE ANSWEHED ACTION V,ESSARY
.h CONCbARENCE
]
i M ACTION NECE$5ARY O COMMENT O
M/17 -M raglia
.Y US/ I6 -511eZeK/,
CLQ5sF POST OF FICE F1LE CODE:
REG. NO D5CRIPTION IMust Se Unclawfes)
REFERRED TO -
DATE RECCIVED BY DATE j
Encloses letter from Boger/Nerses 08/10 Chester E. Gates, Jr re: Licensing of Seabrook' ENCLOSUMES i
r REMARKS Please return this ticket with 2 cys for SVarga.
O S. NUCLE AR REGULATORY COMMIS!!ON FORM NRC 326 MAIL CONTROL FORM ti.7si
(, y--
nn my ;. -,,.
- o o,
UNITED STATES s
, f p,
l NUCLEAR REGULATORY COMMISSION e R WASHINGTON, D. C. 20655 D
E**d*
EDO PRINCIPAL CORRESPONDENCE CONTROL
'FROM:
-DUE: 08/21/87 EDO CONTROL: 003086 DOC DT:-07/31/87 SEN. ROBERT'C. BYRD FINAL REPLY:
LTO:
OCA FOR SIGNATURE OF:
GREEN SECY NO: 87-940 EXECUTIVE DIRECTOR
~
-DFSC:
ROUTING:
ENCLOSES LETTER FROM CHESTER E. GATES, JR. RE RUSSELL LICENSING OF SEABROOK MURRAY DATE: 08/07/87 i
ASSIGNED TO: NRR CONTACT: MURLEY SPECIAL INSTRUCTIONS OR REMARKS:
N"R RECEIVED: August 10, 1987 m IION:
LDRPRiVARGA4 NRR ROUTING:
MURLEY/SNIEZEK STAROSTECKI gg MIRAGLIA FUNCHES DUE TO NRR OlRECTOR'S OFFICf BLAHA MOSSBURG BY Mg-w / T,i/9 y.._
~ ~ _.,
r-ff &O e fo OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL. TICKET
. PAPER NUMBER::
CRC-87-0940 LOGGING DATE: Aug 5 87.
~ ACTION OFFICE:- g MO e
AUTHOR:
R.C. Byrd--Const Ref
' AFFILIATION:.
U.S. SENATE LETTER DATE:
J'21 31 87.
FILE CODE:.ID&R-5 Seabrook
SUBJECT:
Licensing of the Seabrook plant
. ACTION:
' Direct' Reply DISTRIBUTION:'
OCA to Ack,. Docket SPECIAL HANDLING: None
.. NOTES:.
Charles Gates DATE DUE:
Aug 19 87 SIGNATURE:
DATE SIGNED:
AFFILIATION: