AUG 2 01987 o
l MEMORANDUM FOR:
Themis P. Speis, Deputy Director j
for Generic and Regulatory Issues Office of Nuclear Regulatory Research FROM:
A. W. Serki; enior Task Manager Reactor and it Safety Issues Branch Division of 4ctor and Plant Systems Office of Nuciear Regulatory Research q
f i
SUBJECT:
MEETING
SUMMARY
- EPRI's APPROACH TO A PREVENTIVE MAINTENANCE RELIABILITY PROGRAM FOR EDGs (REFERENCE B-56, f
DIESEL RELIABILITY) l Meeting Date:
August 11, 1987 l
Location:
U.S. NRC 7920 Norfolk Avenue Bethesda, Maryland l
l Purpose of Meeting: The purpose of this meeting was to provide EPRI staff an opportunity to discuss their concept of an EDG preventive maintenance reliability program with the NRC staff.
This concept had been presented previously to NUMARC.
Attendees:
See attached attendee list
References:
Enclosure (1)
"An Approach to Resolving Issue B-56, " Diesel I
Generator Reliability," prepared by H. Wyckoff (EPRI).
Enclosure (2) "Use of Reliability-Centered Maintenance (RCM) for Emergency Diesel Generators," A Presentation to Nuclear Regulatory Commission. August 11, 1987, Washington DC, John P. Gaertner, EPRI.
Harvey Wyckoff and John Gaertner (EPRI staff) provided the staff with their views on a reliability-centered maintenance program for EDGs (see Enclosures (1) and (2).
As noted in Enclosure (1), NUMARC has an interest in working with the NRC staff in the resolution of Safety Issue B-56, similar to the NUMARC I
initiatives for resolving USI A-44, Station Blackout.
8708280128 070820 PDR TOPRP EXIEPRI PDR C
l l
l l
l
AUG 2 0 B,il T. Speis ]
Time did not permit a great deal of exchange of views; however, the staff did note that the presentation material did not address how achievement of desired (or r.eeded) reliability levels was to be verified or monitored.
It is likely that follow-up meetings will occur.
NUGSB0 staff and consultants were also present at this meeting.
(See attendee list) l 1
Original Si ned byj I
C A. W. Sorki::
j A. W. Serkiz, Senior Task Manager I
Reactor and Plant Safety Issues Branch l
Division of Reactor and Plant Systems Of fice of Nuclear Regulatory Research l
cc:
B. Sheron W. Minners I
l M. Childers, NUGSB0 H. Wyckoff, EPRI G. Gaertner, EPRI PDR l
DISTRIBUTION Meeting Attendees (w/o Enclosure)
1
'PDR OPRS C/F RPSIB R/F A. Serkiz P Norian K. Kniel l
l OFC
- URPS:RPS B :DRPS:RPSIB : ORPS: PSIB
..... g........g
.s.......................
NAME : ASerk f :Prjban
- k die DATE : 08/ t'/87
- 08/l) /87
- 08/V /87 4
0FFICIAL RECORD COPY
Attendees August 11, 1987 l
EDG Reliability Meeting
SUBJECT:
EDG RELIABILITY - EPRI APPROACH Name Organization Phone Al Serkiz NRR/RES 301-492-7487 Arthur C. Payne, Jr.
SNL 505-846-3568 Jack Burns RES/RES 301-443-7860 Diane Noel RES/DRPS 301-492-7939 Mike McGarry NUGSB0 202-857-9833 Stephen D. Floyd NUGSB0 919-836-6901 Faust Rosa NRR/SELB 301-492-9466 James E. Knight NRR/ DEST /SELB 301-492-7456 Alan Rubin NRC/RES/DRPS 301-492-8303 Joseph R. Fragola SAIC/NY 212-679-3244 John Gaertner EPRI 415-855-2933 Harvey Wyckoff EPRI 415-855-2393 Carl Johnson NRC/RES 301-443-7623 Walter P. Haass NRC/VIB 301-492-4947 Allen Notafrancesco NRR/PSB 301-492-8181 Paul Gill NRR/SELB 301-492-9474 Stephen Maloney Devonrue-NUGSB0 617-426-4550 (Consultant)
Charles S. Ondash Devonrue-NUGSB0 617-426-4550 (Consultant)
Mike Childers Northeast Utiv' lies 203-655-3472 NUGSB0 1
1 J