Text
- _ - __ __
t,
!(fa asog[%,
UNITED STATES g
NUCLEAR REGULATORY COMMISSION g
.j WASHINGTON, D. C. 20555 g**.+/
SEP 0 1 M MEMORANDUM FOR:
Distribution FROM:
Thomas L. King, Acting Chief Advanced Reactor and Generic Issues Branch Division of Regulatory Applications Office of Nuclear Regulatory Research
SUBJECT:
MEETING WITH DOE TO REVIEW CHAPTER 14 0F THE SAFR LMR PRELIMINARY SAFETY INFORMATION DOC lfMENT (PSID)
AND THE SAFETY TEST PLAN FOR THE SAFR DESIGN The subject meeting represents the sixth in a series of meetings to be held with DOE and its contractors to discuss NRC comrrnnts on the DOE sponsored Sodium Advanced Fast Reactor (SAFR) conceptual LMR design proposed by Rockwell International.
The meeting will be held September 9, 1987 in Room 6110 of the Maryland National Bank Building (7735 Old Georgetown Road, Bethesda, Md.),
beginning at 9:00 a.m.
An agenda is enclosed.
Reviewers should be prepared to discuss their comments with the Project Manager for this review (Cardis Allen) the week before the meeting.
If you have any questions please contact Cardis Allen (x28302).
Thomas L. King, Acting Chief Advanced Reactor and Generic Issues Division of Regulatory Applications Office of Nuclear Regulatory hesearch
Enclosure:
As stated 1
i' hh4870902 D
673P p
I
Enclosure
(,.
l Proposed Agenda September 9, 1987 NRC Review of Chapter 14 and Safety Test Plan l
Presentation Schedule Topic Presentation Time Time
~
introduction Lancet 10 min.
9:00 am Chapter 14 Lancet 10 min.
9:15 am
-Demonstration Test Program Safety Test Plan Lancet 40 min.
9:30 am
-Decay Heat Removal l
Break
-Reactor Shutdown Lancet 45 min.
10:45 am Mechanism Lunch
-Operation with Mills 40 min.
1:00 pm Failed Fuel Pins
-Reactor Inherent Mills 50 min.
2:00 pm
Response
Discussion Adjourn 4:00 pm 1
E.
.o
/
SEP01 mg7 DISTRIBUTION Circ Chron ARGIB R/F E. Beckford T. Speis B. Morris
- 2. Rosztoc2y T. King i
J. N. Wilson 1
C. Allen R. Landrf M. Dey P. Williams J. Flack R. Baer N. Anderson F. Cherny S. Shaukat 1
R. Johnson D. Thatcher J. Hulman L. Soffer
- 1. Read J. Cleary R. Kirkwood R. Erickson B. Mendleschn E. Che111ah L. Beltracchi J. Cunningham J. Minns M. Spangler M. El-Zeftawy, ACRS/H-1026 PDR - Project 673
. Central. File ; Project 673