t f#pitog%
UNITED STATES y'
7 NUCLEAR REGULATORY COMMISSION 37 g
g
.E WASHINGTON, D. C. 20555 c,
- a g,
CONSUMERS POWER COMPANY PALISADES PLANT DOCKET NO. 50-255 AMENDMENT TO PROVISIONAL OPERATING LICENSE Amendment No.106 License No. DPR-20 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Consumers Power Company (the licensee) dated September 28, 1984, as modified by submittal dated June 5, 1987, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public; and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license emendment and Paragraph 3.B. of Provisional Operating License No. DPR-20 is hereby ' amended to read as follows:
Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.106, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
j 8709080399 870827 DR Aoocx 03000233 p
____-__-_-_______.____-_____a
e c
2 3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Martin J. V rgilio, Director Project Directorate III-1 Division of Reactor Projects - III, IV, V
& Special Projects
Attachment:
Changes to the Technical
' Specifications Date of Issuance:
August 26, 1987 l
o ATTACHMENT TO LICENSE AMENDMENT hJ.106 PROVISIONAL OPERATING LICENSE NO. DPR-20 DOCKET NO. 50-255 Revise Appendix A Technical Specifications by removing the page identified below and inserting the enclosed page.
The revised page is identified by the captioned amendment number and contains a marginal line indicating the area of change.
REMOVE INSERT 4-68 4-68
(.
1 1
h.1h Aug:sented Inservice, Inspection Program for Steam Generators Applicability Applies to the tubes within both steam generators.
Objective l
To provide assurance of continued integrity of the steam generator tubes l
over their service lifetime.
l Specification k.1k.1 Inspections will be performed at an interval of up to 24 calendar months after the previous inspection.* Tube inspection requirements vill include inspection of all unplugged tubes with an ECT indication of greater than or equal to 30% in either of the previous two inspection periods. If inspection of unplugged tubes with an ECT, indication of greater than or equal to 30% (vbich are obstructed by ECT and repair equipment) leads to significant added personnel radiation exposure, alternate tubes may J
I be selected for inspection. In any event, unplugged tubes with ECT indications of greater than or equal to 30$ vill be inspec,ted at a frequency not to exceed two intervals specified in k.1h.1 above.
The conventional, circumferential1y wound ECT pull type probe she.11 j
l i
be used to inspect unplugged tubes for which an ECT indication greater than or equal to 30% vas noted in either of the two previous ECT in-spections.
In addition, a random sample of 2% of the tubes in the hot leg and 1% of the tubes in the cold leg of each steam senerator vill be inspected using the conventional, circunferentie.11y wound ECT probe.
- The interval may be extended to 30 months if the mean degradation increase for the previous steam generator inspection interval was less than +1%.
4-68 Amendment No. 77, 57, 106
,