i

{*

OPERATIN3 DATA REPORT

?1 Y

DOCKET NO.

50-348 DATE 7/1/87 CIMPLE'IED BY J. D. Woodard

'IELEPfEEE (205)899-5156 OPERATING STA'IUS Notes

1. Unit Name:

Joseph M. Farley - Unit 1

2. R3 porting Period:

June, 1987

1) Cumulative data since
3. Licensed Thermal Power ( E t):

2,652 12-1-77, date of l

4. Nameplate Rating (Gross me):

860 commercial operation

5. Design Electrical Rating (Net me): 829
6. Maximum Dependable Capacity (Gross me):

856.0

7. Maximum Dependable Capacity (Net me):

825.1

8. If Changes occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A

9. Power Level To which Restricted, If Any (Net MWe):

N/A

10. Reasons For Restrictions, If Any:

N/A I

'Ihis Month Yr-to--Date Cumulative

11. Hours In Reporting Period 720 4,343 83,975
12. Number Of Hours Reactor Was Critical 720.0 4,092.3 61,001.8
13. Reactor Reserve Shutdown Hours 0.0 0.0 3,650.0
14. Hours Generator On-Line 720.0 4,030.3 59,652.7
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 l
16. Gross Thermal Energy Generated (MWH) 1,909,366 10,507,253 151,834,921
17. Gross Electrical Energy Generated ( WH) 613,226 3,416,220 48,779,264
18. Net Electrical Energy Generated ( WH) 582,662 3,237,098 45,961,432 j
19. Unit Service Factor 100.0 92.8 71.0
20. Unit Availability Factor 100.0 92.8 71.0
21. Unit Capacity Factor (Using MDC Net) 98.1 90.3 68.1 i
22. Unit Capacity Factor (Using DER Net) 97.6 89.9 66.0
23. Unit Forced Outage Rate 0.0 1.9 10.0
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A

{

25. If Shut Down At End Of Report Period, Estimated Date of Startup:

N/A l

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 08/06/77 08/09/77 l

INITIAL ELECTRICITY 08/20/77 08/18M7 i

COMMERCIAL OPERATION 12/01/77 12/01/77 i

Form 2/34 d

[

4>fb '

8708200006 870630 g{

PDR ADOCK 05000348 L

R PDR

nI DOCKET No. 50-348 i

lt UNIT-1 DATE July'1, 1987 COMPLETED BY J. D. Woodard TELEPliONE (205)899-5156 l

l MONTH June DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY PONER LEVEL l

(M4e-Net)

(PMe-Net)

'l 811 17-808 2

811 18 809 3

803 19 808 4

803 20 807 4

1 5

811 21 808 6

805

'22 809 7

814 23 807 8

816 24 805 9

814 25 809 10 812 26 808 11 810 27 810 12 808 28 816 13 809 29 811 q

14 810 30 807' 15 809 31 16 809 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for.each day in the reporting month. Compute to the nearest whole megawatt.

Form 13/21

R 1 O -

A D 9 F

, W 9 8

1 S

3 M Y D

)

4 5

L 0

0

. U

. 2 5 J J J

(

E E

G V

C E

I N

R T - E U

e N 0 E E Y E C - M M T B N E O e

(

01 A A O

R T I

a s e'

T N D D H R

C s t n e E

E P O N E n a el c

I T T E C O R o D ci r

C I E L I

i i F u

O N L E E T T t f L o

D U.

P T C N c o

)

S M

E A E u

r R O

S V

r n o E e

C U

. E t of L m

s i

(

a A

R C

P n t s t S

I a t r

- r e o G a e p I

p h e t e S R t

i r i

b E

b P yt

)

N i

r n 1 i

U h r t e6 h

J x o n v 1 x

lll iIlIIIIl I1l1 ll.iIlllI E f E E 0 E

~~

4 F

O T

S N

H N

E T

O N

N I

O O

T P E M

C M D U

O O E

D C C H

E T

R lll I IlII II IlI1 i I iI II I1 l R

E M

E N

E G

W U

T E N

O J

S D I

m)

P Y O R

a n

. r i S C U

D H

D m c a a S l N

T M

E t

N S i

(

A N

l ll IIlII I I I lII I l I IIlll I r

p O

S c c xE ut T

S T

I

a a m r E

O t

l l

a w

v R

N T R T

u O

E N O C

d u u o e s

P C E P U

o n n t h u

E I V E D

h a a u t n

R L E R E

t M M A O S

R e - - - -

T l l l l

I l1III Il II I iI II IiI l M 1 2 3 4 I

NU R

OT R

F C

E O G A W

n N E O

o D I R P

i O T t

H T N T

a T U W N

n E H O A

i m

M S D C -

a I

x l ll lI l1II I I IIIIIIIIlIII E

F I

N N

)

e

)

O G

n s

n S

I i

n i

A S

a e

a E

l

.c l

R R

p ni p

O x

o L x

ll l I1lII III I i!II IIII III E

i E

(

t t &

(

s c

S e e i g r

N

)

W u

t i r

)

O N

r T r n o

I S T R O

l r'

s n e r n A U D

i o e i v E i R O T

a R e i. a U H U

F e r t l l D

(

H c

yT a a p

- S t n g r '

r n xE ll l Ill I I 1IlIlI1 II 11 IIII n a n o r t o

(

e ni t o s i m e l a t i t

p t e l a n a r E

ni n u u r i r e P

T o uif g e m e h Y

I s q a e e p d p t T

N a E M R R O A oO U

e - - - - - - - -

lll I IlI I i1 l 1 1I1 1 I l l I1I I R A B C D E F G H ON E

T E

d A

R e

D E

d u l

W ll l 1 Il1I Il ll lIll 1II IllI e d c e r h E

o c

)

R F S 7

E 7/

- O H

F S 9

N T

l l l

lIl1111i I 1I lIlI iI1Il'

(

j

~

3 o

l

\\

i

/

r JOSEPH M. FARLEi NUCLI'AR PLANT LNIT 1 NARRATIVE StBNARY OF OPIRATIONS I

June, 1987 i

There were no unit shutdowns or significant power reductions during the month of June.

The following major safety-related maintenance was performed in the month l

l of June:

l l

l l

1.

The support racks for the 1A and 1B auxiliary building batteries l

l had additional welding done on the embedment because of possible i

seismic concerns, j

i 2.

The 1B emergency air compressor auto start air pressure switch seas 4

l replaced.

3.

The battery bank of the Number 4 service water battery was j

reworked due to improperly installed anchor bolts.

t 4.

Miscellaneous corrective and preventive maintenance was perfonned j

on the diesel generators.

j 1

i i

i i

l I

l 1

t OPERATING DATA REPC.tT l

DOCKET N3.

50-348 DATE 7/1/87 COMPLETED BY J. D. Woodard

'I1!:LEPHONE (205)899-5156 OPERATING STA'IUS Notes

1. Unit Name:

Joseph M. Farley - Unit 1

2. Reporting Period:

June, 1987

1) Cumulative data since
3. Licensed Thermal Power ( Mt):

2,652 12-1-77, date of

4. Nameplate Rating (Gross MWe):

860 commercial operation

5. Design Electrical Rating (Net We): 829 l
6. Maximum Dependable Capacity (Gross We):

856.0 L

7. Maximum Dependable Capacity (Net We):

825.1

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A

9. Power Level To Which Restricted, If Any (Net We):

N/A

10. Reasons For Restrictions, If Any:

N/A

'Ihis Month Yr-to-Date Cumulative I

11. Hours In Reporting Period 720 4,343 83,975
12. Number Of Hours Reactor Was Critical 720.0 4,092.3 61,001.8 l
13. Reactor Reserve Shutdown Hours 0.0 0.0 3,650.0 j
14. Hours Generator On-Line 720.0 4,030.3 59,652.7
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated ( WH) 1,909,366 10,507,253 151,834,921
17. Gross Electrical Energy Generated ( WH) 613,226 3,416,220 48,779,264
18. Net Electrical Energy Generated ( WH) 582,662 3,237,098 45,961,432
19. Unit Service Factor 100.0 92.8 71.0 l
20. Unit Availabi}ity Factor 100.0 92.8 71.0 l
21. Unit Capacity Factor (Usinei.tDC Net) 98.1 90.3 68.1 l
22. Unit Capacity Factor (Usin, 9, Ne t )

97.6 89.9 66.0

23. Unit Forced Outage Rate 0.0 1.9 10.0
24. Shutdowns Scheduled Over N3xt 6 Months (Type, Date, and Duration of Each):

l N/A

25. If Shut Down At End Of Report Period, Estimated Date of Startup:

N/A

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved y

i INITIAL CRITICALITY 08/06/77 08/09/77 INITIAL ELECTRICITY 08/20/77 08/18/77 i

CCMMERCIAL OPERATION 12/01/77 12/01/77 l

Form 2/34 l

l

1 I

DOCKET No.

50-348 UNIT 1~

.DATE July 1, 1987

)

i COMPLETED BY J. D. Woodard TELEPHONE.(205)899-5156 1

I MONrH June ERY AVERAGE DAILY JER LEVEL DAY AVERAGE DAILY POWER LEVEL (Me-Net)

(MNe-Net) 1 811 17 808 2

811 18 809 l

l 3

803 19 808 4

803 20 807 i

l 5

811 21 808 6

805 22 809 7

814 23 807 8

816 24 805 l

1 9

814 25 809 l

10 812 26 808 11 810 27 810 12 808 28 816 13 809 29 811 14 810 30 807 15

_ 809 31 16 809 l

INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

l Form 13/21 a -

___ _ =__ - _ _--_ _ _-_ _ - - _ -

f lll IllIlIllIIIIIIIIIIII 1

2 T

I N

U

. ^

D 6

Y 7

R 5

E 8

A 1

L 9

D 5

R 1

O A

O 9

F W

9 4

1 8

4 1

3 M

Y D

5 L

0 0

U 2

5 J

J J

(

G E

E E

V C

R I

N U

T E

eN O E E Y E C

R e

(

N M T B N E O R a s A A O

R T U s t n e e

T N D D H R

C n a el c

E

.E P

O N E oD ci r

K T T E C O R i

i F u

C I E L I

t f L o

O N L E

& T T c o

)

S D U P T C N u

r R M

E A E r noE e

O S

V t of L m

.C U

E s i

(

a

- r e o

~

A R

nt s t S

C

. P I a t r

~

G a e p I

ph e

't e S R t

i r i

)

b E

b P yt i

r n1 i

NU h r t e6 h

J x o n v1 x

lll IIlI iIIIIIIIIIIIIIII E f E E 0 E

F O

T S

N H

N E

T O

N N

O O

P 'E M

ITC M D U

O O E

D C C HT E

lll IIlI iI IIIIII1IIII III R

R E

M E

N E4 G

W U

T E N

m)

O J

S D I

P Y O R

a n

. r i S C U

D H

D m c a N

T

.lll IIlIlIIIIIII1IIIIIII a S l A

T r

p O

S c c1 I

S M

E 4

N S i E N

E O

.t

(

W T

S T

I l l a

a a m r O

R N T R T

D O

E N O C

d u u o e T

P C E P U

o n n t h U

E I V E D

h a a ut H

R L E R E

t P M A O R

e - - - -

S llI IIlIiIIIIIIIiIIII II M s 2 3 4 TIN

'R U

O T

R F

C E

O G A W

n N E O

.o D I R P

i t

O T H T N T

a T U w N

n i

E H O A

M S D C

m I

a x

lli IIlIII IIIIIIIIIII III E

F 2

I

)

s n

e

)

N N

O G

n S

I i

n i

A S

a e

a l

c l

ER R

p ni p

O x

oL x

lli IIlI IIIII IIIIIIIIIII E

i E

(

t t &

(

s c

N S

e e i g r

r T r n o

N O

)

I S W

u t i r

)

T R O

l r s n e r n A U D

i o ei v E i R O T

a R ai a

D i U

F e r t l l U n H

c yT a a p S

t n g r r n x

.llI I Il1III1IIIIIIIIIIII n a n o r t o (E

e nit o s i m e l a t i t

pt el a n a r E

ni n u u r i r e P

T o uif g e m eh Y

I s q a e e pd p t T

N a E M R R oA O O U

e - - + - - - - -

llI IIl11II111I I II II I III R A B C D E F G H ON ET E

d 2

A R

e

/,

D E

l 3

llI 11lllII11lIIIIIIIIII d u R

W ed O

c e r h D

)

I E

o c R

F S 7

N T

F S 9(

M E

7

/

O H

llI 1lllI1Il11IIIII!IIII lI l

l(

Ill ll ll lIl l

f a :

Alabama Power Company.

600 North.18th Street Post _Of fice Box 2641 '.

-- Birmingham, Alabama 352910400

Telephone 206 250-1835 -

L

- Sn"io%fce"e'rTeioen,.

. Nabama ha j

the Southem electric System

\\

f!

July 9,1987 Docket No. 50-348 Director,' Office of Resource Management l

U. S. Nuclear Regulatory Commission j

4

- Washington, D.C.

20555

Dear Sir:

4 j

RE: Joseph M. Farley Nuclear Plant-Unit 1 Monthly Operating Data Report i

1 Attached are two (2) copies of the June 1987 Monthly Operating Report

- for Joseph M. Farley Nuclear Plant Unit 1, required by Section 6.9.1.10 of -

the Technical Specifications.

i If you have any questions, please advise.

Yours very truly R. P. Mcdonald j

RPM /BCE:mab/F-2 Enclosures l

xc: Director, IE (10 copies)

Director, RII (1 copy) i s

f op t y i

i l

d 1

rm:

m a

l l

l l

JOSEPH M. FARLEY NUCLEAR PIANT UNIT 1 NARRATIVE SONARY OF OPERATIONS.

l June, 1987 l

There were no unit shutdowns or signif.icant power reductions during the 3

month'of June.

The following major safety-related maintenance was performed in the month of June:

1.

The support racks for the 1A and 1B auxiliary building batteries j

had additional welding done on the embedment because of possible seismic concerns.

2.

The 1B emergency air compressor auto start air pressure switch was replaced.

3.

The battery bank of the Number 4 service water battery was 1

reworked due to improperly installed anchor bolts.

t 4.

Miscellaneous corrective and preventive maintenance was performea i

on the diesel generators.

f I

1 1