Monthly Operating Rept for June 1987
ML20237K881
Person / Time
Site: Farley 
Issue date: 06/30/1987
From: Mcdonald R, Woodard J
ALABAMA POWER CO.
To:
NRC
References
NUDOCS 8708190441
Download: ML20237K881 (10)


Text

_____ _ __ _ _ _ ___ _ _

l l

L4 OPERATING DA'IA REPORT DOCIG.T NO.

50-364 DATE 7/1/87 COMPLE'IED BY J. D. Woodard

'IELEPIERIE (205)899-5156 i

OPERATING STAWS Notes

1. Unit Name:

Joseph M. Farley - Unit 2

2. Reporting Period:

June, 1987

1) Cumulative data since
3. Licensed hermal Power ( Et):

2,652 7-30-81, date of

4. Nameplate Rating (Gross We):

860 commercial operation

5. Design Electrical Rating (Net W e): 829 60 Maximum Dependable capacity (Gross Ne):

864.9

7. Maximum Dependable Capacity (Net Me):

824.1

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A

9. Power Level To Which Restricted, If Any (Net We):

N/A l

10. Reasons For Restrictions, If Any:

N/A i

his Month Yr-to-Date Cumulative

11. Hours In Reporting Period 720 4,343 51,888
12. Number Of Hours Reactor Was Critical 720 3,985.6 50,341.8.
13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
14. Hours Generator On-Line 720.0 3,968.7 44,819.5
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1,771,494 10,002,105 113,320,095
17. Gross Electrical Energy Generated (MI) 573,594 3,269,558 37,278,828
18. Net Electrical Energy Generated (MI) 543,988 3,101,794 35,350,906 1
19. Unit Service Factor 100.0 91.4 86.4
20. Unit Availability Factor 100.0 91.4 86.4
21. Unit Capacity Factor (Using MDC Net) 91.7 86.7 83.6
22. Unit Capacity Factor (Using DER Net) 91.1 86.2 82.2
23. Unit Forced Outage Rate 0.0 8.6 4.8
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling / Maintenance outage, 10/2/87, approximately eight weeks

.25. If Shut Down At End Of Report Period, Estimated Date of Startup:

N/A

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 05/06/81 05/08/81 INITIAL ELECTRICITY 05/24/81 05/25/81 COMMERCIAL OPERATION 08/01/81 07/30/81

-k Form 2/30

'/)

8708190441 B70630 PDR ADOCK 05000364-PDR R

l, DOCKET No. 50-364 b

UNIT 2

I DATE July 1, 1987 COMPLETED BY J. D. Woodard I

I TELEPHONE (205)899-515G j

M0tml June DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (PHe-Net)

(M4e-Net) 1 814 17 630 2

813 18 632 1.

3 813 19 631 4

815 20 630 5

817 21 653 6

819 22 699 7

819 23 811 8

820 24 811 l

9 819 25 812 10 817 26 811 I

11 815 27 816 12 788 28 821 13 623 29 813 14 632 30 810 15 630 31 16 630

. INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

Form 13/21

)

lll IllI III!1IiIIlIII1IIII 2

T I

N U

p m

1 ~

D 6

p Y

7 R

5 E

8 A

1 e

L 9

D 5

t R

1 O

a A

O 9

s W

1 n

F 4

2 s

e 3

M T

D 5) d 5

n L

0 o

2 c

U 0

9 J

J J

(

E E

B GE V

C 2

R I

N U

T E

r eN O E E T E C

R i

e

(

N M T S N E O R a

7 a s A A o

R T U p

s t n e e

T N D D n R

C e

n a el c

E E P O N E r

oD ci r

K T T E C O R i

iF u

C I E L I

o t f L o

O B

L E E T T t

S c o

)

n P T C N D

t E A E n

u r R t

r r,

o E e

fO S

V o

t of L m

C U

E i

s i

(

a A

R t

C P

c nt s t S

I a t r u.

d r

- r e o G a e p 1

e o ph e r t t e S R t

o i r i

r m b

b P yt

)

e i

r n1 i

wd o n h r t e6 h

x o n v 1 x

P a lll IllIII!iiIi1IIIIIiIIII E f E E 0 E

T S

N N

E O

W I

O O

T P E M

C M D U

O O D

C C ER lll IllIII iIIII1IIII IIIIII R

E M

E N

E W

U T E m)

O J

S D a n P

Y O A

. r i S C K

m c a D

H a S l A

N lll IlllIIIIIIli III IIIIIII r

p N

T c c x O

S i E S

M E

t

(

N E

l l a

W T

S T

a a m r O

R N T R d u u o e D

O E N O A

o n nt h T

P C E P

/

h a a ut U

E I V E N

t M M A O H

R L E R e - - - -

S ll l IlliIIIIIIiII IIIIIII II M 1 2 3 4 TYNU ROT F

C n

O G A o

N E i

D I R A

t O T

/

a H T N N

n T U W i

E H O m

M S D ax l l l IlliIIIII IiI 1II IIII1II E

e

)

N

)

s n

n O

i b

S a

e "t

A l

c l

E B

p ni p

R x

o L x

E lll IllIIIII III I1 I I III I1 II E

i

(

(

t t &

s c

e e i g r

N r T r n o

O

)

u t i r

)

I S l

r s n e r n T R i o e i v E i A U 0

a R a i a

R O F e r t l l U H 0

c yT a a p D

(

t n g r r n x n a n o r t oE lll Il l III II II I IiI 1IIII i I I e nit o s i

(

m el a t i t pt el a n a r ni n u u r i r e E

o uif g e m e h P

s q a e e pd p t Y

F a E M R R O A O O T

e - - - - - - - -

ll l I l l 1II I I II i I I I 1 I I I I I I I R A B C D E F G H 2

1 N

E 6

d T

0 e

A 7

l D

8 d u D

e d lll 1 l l 1 I II IIIIiIIlIIIII II c e r h o c

)

F S 7

E 5

7 0

/

O 0

F S 9

N

(

ll l 1 l llII III1il I I lIII II II ll 1llL

I

~

JOSEPil M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE SL? NARY OF OPEIMTIONS June, 1987 l

There was one significant power reduction during the month of June. On 6-12-87, power was reduced to approximately 80% to facilitate the repair of the 2B condensate pump arxi motor. The unit returned to full power operation on 6-23-87.

The following major safety-related maintenance was perfomed in the month of June:

1.

The clearance uns adjusted on the balance drum of the turbine driven auxiliary feedunter pump thrust bearing.

2.

The 2B battery charger was taken out of service and the spare was placed in use.

The 2D battely charger was repaired.

3.

Miscellaneous corrective and preventive maintenance i as perforir.ed on the diesel generators.

li s l

OPERATING IATA REPORT l..

l DOCKET NO.

50-364 I

IRTE 7/1/87 CIMPLETED BY J. D. Woodard TELEPIEME (205)899-5156 l

OPERATING STA'IUS Notes I

1. Unit Name:

Joseph M. Farley - Unit 2

2. Reporting Period:

June, 1987

1) Cumulative data since
3. Licensed %ermal Power ( Wt):

2,652 7-30-81, date of

4. Nameplate Rating (Gross Mile):

860 comercial operation

5. Design Electrical Rating (Net Me): 829 l
6. Maximum Dependable Capacity (Gross We):

864.9

7. Maximum Dependable Capacity (Net We):

824.1

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A

9. Power Level To Which Restricted, If Any (Net MWe):

N/A

10. Reasons For Restrictions, If Any:

N/A his Month Yr-to-Date Cumulative

11. Hours In Reporting Period 720 4,343 51,888
12. Number Of Hours Reactor Was Critical 720 3,985.6 50,341.8
13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
14. Hours Generator On-Line 720.0 3,968.7 44,819.5
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1,771,494 10,002,105 113,320,095
17. Gross Electrical Energy Generated (MWH) 573,594 3,269,558 37,278,828
18. Net Electrical Energy Generated (MWH) 543,988 3,101,794 35,350,906
19. Unit Service Factor 100.0 91.4 86.4
20. Unit Availability Factor 100.0 91.4 86.4
21. Unit Capacity Factor (Using MDC Net) 91.7 86.7 83.6
22. Unit-Capacity Factor (Using DER Net) 91.1 86.2 82.2
23. Unit Forced Outage Rate 0.0 8.6 4.8
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling / Maintenance outage, 10/2/87, approximately eight weeks

25. If Shut Down At End Of Report Period, Estimated Date of Startup:

N/A

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 05/06/81 05/08/81 l

INITIAL ELECTRICITY 05/24/81 05/25/81 COMMERCIAL OPERATION

_08/01/81 07/30/81 Form 2/30

DOCKET NO.

50-364 UNIT 2

DATE July 1, 1987 I

COMPLETED BY J. D. Woodard TELEPHONE (205)899-5156 MONIE June i

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (M4e-Net)

(M4e-Net) 1 814 17 630 2

813 18 632 3

813 19 631' i

4 815 20 630 5

817 21 653 6

819 22 699 7

819 23 811 8

820 24 811 9

819 25 812 10 817 26 811 11 815 27 816 12 788-28 821 13 623 29 813 14 632 30 810 15 630 31 16 630 INSTRUCTIONS on this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

Form 13/21

R 1 O -

a A

O 9 s

W 9 n

F 4

2 8

e 3 M Y D 3

d 6

. 5 n

L 0

o

. 2 c

0

. U 9 J J J

(

E E

5 GE V

C 2

R I

N

- U T

E r

O E E Y E C

R i

N e

(

e N M T B K E O R a

a s A A O

R T U p

s t n e T N D D H R

C e

n a e l E

E P O N T r

E T T E C O R o D ci C I E L I

o i

i F t f L O N L E i T T t

D U P T C N c o

)

M E A E n

u r R r n o E O

S V

o L

C U

E

~ i t of

(

s i A

R t

C P

c nt s t I a t r u.

- r e o d r e o G a e p p h e r t t e S R o

i r i

r m e

b P yt

)

b i

r n 1 w d o n h r t e 6 P

x o n v 1 lll I lla IIIIIII I i1 i! iIIIlI 1 E f E E 0 T

S N

N E

O W

I O

O T

P E M

C M D U

O O D

C C E

R ll l IllIl III IIIii i ii1I !II 1 R

E M

E N

E W

U T E m)

O J

S D a n P

Y O A

. r i S

C.

K m c a D

H a S l N

T l l l l' l l i I I I 1i IIi i i I I 1 IiI Il r

p A

N c c x O

S i E 3

M E

r t

(

i E

l' l a W

T S

T O

R N T R

a a m r D

O E N O A

d u u o e o n nt h T

P C E P

/

U E

I V E N

h a a u t t M M A O H

R L E R e - - - -

S lll Illl I 1I l i I I I I I Ii1I II Il M 1 2 3 4 T

I NU R

OT r

C n

O G A o

N E i

D I R A

t O T

/

a H T N N

n T U W i

E H O

-,1 m

M S D a

l ll Il l 1 I I IIi III IIl tlILI I I Ex w

N

)

e n

s O

i n

S a

e A

l c

E B

p ni R

r o L l l l I l l l I I I III I1I Il liII I I I E

i

(

t t &

s c

e e i g N

)

u t i r T r n OI S l

r s n T R i o e i v A U

'0 a

R a i R O F e r t U P 0

c y T a D

(

t n g r n a n o r t o l l l I l li I I I I I I I l I I i I I I I I I I e n i t o s i m e l a t i t p t e l a

n i n u u r i r E

o u i f g e m e n P

s q a e e p d p t Y

r a E M R R O A T

e - - - - -

l l l

1 ll I I I I I I I I i I I l I I I I I I I R A n C D E F G 2

1 E

6 d

T 0

e A

7 l

D 8

d u e d l l l

l l l

I 1I IiI II I I I i I I I I II I c e r h o c 5

F S l

l l l

l l I 1 I 1 I I I 1 I l

I I i II I I I I 0

O.

0 F S N

j Ce b

I<

Alabama Power Company

' 600 North 18th Street '

Post Othee Box 2641 Dirmingham. Alabama 35291-0400.

Telephone 205 250-1835 L

h;fgyag,g,,,

AlabamaPower the southern electrc system July 9,1987 l

1 l

Docket No.-50-364 l

Director,' Office of Resource Management U. S. Nuclear Regulatory Commission j

Washington, D.C.

'20555

Dear Sir:

I l<

RE: Joseph M. Farley Nuclear Plant

- Unit 2 4

Monthly Operating Data Report Attached are two (2) copies of the June 1987 Monthly Operating Report I

for Joseph M. Farley Nuclear Plant Unit 2, recuired by Section 6.9.1.10 of l-the Technical Specifications.

If-you have ary questions, please advise.

Yours very tru [

i

% A/

R. P. Mcdonald RPM /BCE:mab/F_-2

- Enclo' surds xc: Director IE (10 copies)

Director, Ril (1 copy) g

l s

I,.

JOSEPl! M. FARLEY NUCLEAR PLANT l

l UNIT 2 NARRATIVE SL? NARY OF OPEPATIONS June, 1987 1

There was one significant power reduction during, the month of June. On 6-12-87, power was reduced to approximately 80% to facilitate the repair of the 2B condensate panp and motor. The unit returned to full power operation on 6-23-87.

The following major safety-related maintenance was performed in the month of June:

1.

The clearance was adjusted on the balance drum of the turbine driven auxiliary feedwater pump thrust bearir.g.

2.

The 2B battery charger was taken out of service and the spare was placed in use.

The 2B battery charger was retnited.

3.

Miscellaneous corrective and preventive maintenance was performed on the diesel generators.

l l

i l

l l

_ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ -