ML20237K681
| ML20237K681 | |
| Person / Time | |
|---|---|
| Site: | Maine Yankee |
| Issue date: | 03/31/1987 |
| From: | Taylor J, Whittier G Maine Yankee |
| To: | Hartfield R NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| References | |
| GDW-87-91, MN-87-45, NUDOCS 8708190366 | |
| Download: ML20237K681 (22) | |
Text
_ - __-_ _ _ _ _ ___ ___-___ - -
Docket No.:
50-309 OPERATING DATA ~ REPORT.
Date:
02/Apr/87 Completed By:
J.M.
TAYLOR Telephone:
207-882-6321
- 1. Unit Name.......................................
Maine Yankee
- 2. Re.corting Period................................
March 1987
- 3.. Licensed Thermal Power (MWt)....................
2630
- 4. Nameplate Rating fGross MWe)....................
864
~5.
Design Einctrict) Rating (Net MWe)..............
825
- 6. Maximum DependabO2 Capacity (Gross MWe).........
850
- 7. Maximum DependaL'.e Capacity (Net MWe)...........
810 8.
If Changes in Capacity. Ratings (Items Number 3-7)
Since 1.ast Report, Give Reasons:
NO CHANGES
- 9. Power Level to Which Restricted, if Any (Net MWe)
NO RESTRICTIONS 10.~ Reasons for Restrictions, if Any:
THIS MONTH YEAR-TO-DATE CUMULATIVE
- 11. Hours In Reporting Period 744.00 2.160.00
- 12. Number of Hours Reactor Was Critical...........
648.43 2.064.43 102.193.32
- 13. Reactor Reserve Shutdown Hours..................
0.00 0.00 0.00
- 14. Hours Generator On-line..
647.45 2.063.45 99.403.14
- 15. Unit Reserve Shutdown Hours..................
0.00 0.00 0.00
- 16. Gross Thermal Energy Generated.(MWH)........
1.313.599.00 4.832.241.00
.226.089.553.00 '
- 17. Gross Electrical Energy Generated (MWH)........
414.490.00 1.577.890.00 74.278.900.00
- 18. Net Electrical Energy Generated (MWH)........
396.930.00
__1.521.981.00 70.950.052.00
- 19. Unit Service Factor......
87.02 95.53 78.80 79.54
- 20. Unit Availability Factor..
87.02 95.53
- 21. Unit Capacity Factor (Using MDC Net)........
65.87 86.99 71.13
- 22. Unit Capacity Factor (Using DER Net)........
64.67 85.41 69.29
- 23. Unit Forced Outage Rate..
0.00 0.00 6.37
- 24. Shutdowns Scheduled Over Next 6 Months:
NONE
- 25. If Shutdown at End of Report Period, Estimated Date of Startup:
5/12/87 i
f[j8190366870331
~
R ADOCK 05000309 PDR
)
1
7 Docket Nos
50-309 Unit Name:
Maine Yankee Date:
04/Apr/87 Completed By:
J.M.
Taylor l
Telephone:
866-1232-231 I
Report Month: March, 1987 l
NARRATIVE
SUMMARY
OF OPERATIN8 EXPERIENCES i
At the beginning of the month the plant was at 84% power with ref ueling coastdown in progress.
On March 7th, power was reduced for turbine valve testing, extraction i
nonreturn valve testing and excess flow checkvalve testing. Power was increased to 81% on the 7th.
On March 16th, power was reduced to 75% to repair a first point heater-extraction steam valve.
On March 18th,. power was reduced to 73% to repair a chloride leak in the i
"B" waterbox of the condenser.
On March 19th, power was increased to 75%.
Refueling coastdown continued until late on March.27th when the generator was taken off-line to commente the refueling outage.
The plant was in refueling outage for the remainder of the month.
)
iJ i.
1 1
AVERAGE DAILY UNIT POWER LEVEL FOR MARCH 1987 I
Docket No.:
50-309
' ' Maine Yankee Unit:
Date:
31/ Mar /87 Completed By:
J.M.
TAYLOR Telephone:
207-882-6321 1
4 1
Day Avg.' Daily Power Level Day Avg. Daily Power Level t
(MWe-Net)
(MWe-Net) f1' 681 16 607 2
677 17 581 3
673 18 573 4
670 19 589 5
663 20 597 6
657 21 579 7
651 22 570 8
651 23 569 9
647 24 560 10 640 25 549 11 636 26 546 635 27 467 12 13 629 28 D
I
~
14 624 29 O
O 15 622 30 O
l 31 1
)
UNIT" SHUTDOWNS AND POWER REDUCTIONS Docket No.
50-309 FOR MARCH 1987 Units Maino Yankee Date:
02/Apr/87
. ' J.M.
TAYLOR Completed By:
Telephone:
207-882-6321 Number 16-87-9 Date 870327 Type (1)
S Duration (Hours) 96.5 i
Rmason (2)
C l
M3thod (3) 1 LER #
N/A t
System Code (4)
ZZ Component Code (5)
N/A PLANT SHUTDOWN FOR REFUELING OUTAGE.
Cause and q
Corrective Action 1.. TYPE:
2.
REASON: (cont) 4.
SYSTEM CODE:
(F)orced F-Administrative Exhibit G-Instructions (S)cheduled G-Operational Error for Preparation of Data H-Other (Explain)
Entry Sheets for 2.
REASON Licensee Event Report A-Equipment Failure 3.
METHOD:
(LER) File (NUREG.0161)
B-Maintenance or Test 1-Manual C-Refueling 2-Manual Scram 5.
COMPONENT CODE:
D-Regulatory Restriction 3-Automatic Scram Exhibit I-Same source E-Operator Training &
4-Other (Explain) as above.
l License ED< amination
Form No. ZU-304-4.
l
]
R::v. No.
0
~
Rsvised; MONTH March 1987 MAINE YANKEE LOAD REDUCTION TIME DURATION
-l TIME' l TIME l TIME l TIME l
l TOTAL l l START
% l STAB-l START l STAB-l% l TIME l
DAY l DOWN IPWR I ILIZED lPWR I UP l ILICED lPVR I (HRS) l REASON 1
1 I
I I
I I
I I
I
. _2.1._ I I
I I
I I
i l
i u?
3' ?M_
l i
1 l
i I
I I
I 4 ' l' I
I I
I I
I i
l i
5 I
I I
I I
I I
I I
q 6
I I
I I
I I
I I
I i
7' I 0300 l 81 1 0315 1 80 l 0345, l 0359 1 81 l 1.0 ITurbine valve testing. EFCV testing '
8' I I
I I
I I
I I
I
)
9 I
l l
l l
l l
l l
{
a 10 l
I I
I I
I I
l, 11 l'
I I
I I
I I
I I
i 12 I
I I
I I
-1 I
I i
13 I
I I
I I
I I
I i
14 l
l
~l I
l l
l I
l j
f 15 I
i l
l l
l l
1 I
16 l 1546 178.81 1810 1 75 l l
l l
l Repair first point heater i
17 l
l l
l
'l l
l l
lextraction steam valve 10, 1 1438 174.81 1530 1 73 l l
l l
IRepair chloride leak in "B" water 18 l
1 l
l l
1 l
lbox 5
l l
l l,,,. 1 0500 1
0820 1 75 l IHolding for xenon to stabilize 19 l
l l
l l 1830 l
2245 176.11 74.73 1 20-22 l
l l
l 1
1 I
l l
23 1
l l
1 I
I l
l l
.24 I
I I
I I
I I
I I
25-1 I
I I
L I
I I
I 26 1
l l
I l
l 1
l l
27 l 1800 1 69 l 2327 l 10 l l
l 1
5.45 IShutdown; generator off-line; 28 l
l l
0000 l
0l l
l l
leefueling outage in progress 29 I
I i
i l
i l
i l
30 l
I I
I J
l l
I I
'31 I
I I
I I
I I
I I
)
0020n
f I
Form to. 20-404-5 Rev. No. 0 Revised:
MONTH March 1987 OUTAGE & AVAILABILITY TIMES (SUB CRIT)
( 500'F)
(OFF-LINE)
TIME l TIME TIME l TIME l TIME l TIME l
RX l, RX
. RX NOT l RX l UNIT l UNIT l
l l
DAY l REASON l TRIP l CRIT. I AVAIL. I AVAIL l TRIP l PHASED l 1
l l
l l
l l
l l
2 I
I I
l l
l l
l 3
l I
I I
I I
l l
4 I
I I
I I
I l
l 5
1 1
I I
I I
I l
6 I
I I
I I
I I
l 7
I I
I I
I I
I l
8 I
I I
I I
I I
l 9
l l
l l
l I
l l
10 1 I
I I
I I
I l
11 1
I I
I I
i l
l 12 I
I I
I I
I I
l 13 I
I I
I I
l' l
l 14 I
I I
I I
I I
l 15 I
I I
I I
I I
l 16 I
I I
I i
i I
l
_1.]
I I
I I
I I
I l
18 I
I I
I I
I I
i 19 I
I l
l I
I l
l 20 1
I I
I i
l l
l 21 I
I I
I I
i I
l 22 I
I I
l l
1 I
l 33 I
I I
I I
I I
l 24 I
I I
I I
I I
l 25 I
I i
I I
I I
l 26 1
I l
l I
I l
l 27 IManual reactor shutdown to commence l
I J
l l 2327 l l
28 Irefueling outage 1 0026 l l,0148 1
I I
l 29 I
l l
l l
l l
l 30 l
I l
l l
l l
31 1
I l
l I
I i
l 0020n i
a
w vsa s" "
s.fs 04 sOCs w
sD e
A e
er
_I
--Q-
~
A
- OJ 04 04 W
~~e m
J m
w w <o og b
w u==
?
04 3
O CJ W
~">
- m.
W O -. J
.p e e=e Z r.
& DC tra w o w w
yM p.
4 6-aCI" O
s0Cs c CA.
1
- l1A >--
532 2 o
eM M gy C C rill$ Q C4
..e
>w t9 O
O El18 C
,W LaJ
=
cr :- -t C rac w
eeW 4
51l$ D N
C lE
~
o
--e I
- e
-e s
3o
_o y
-r
- 7N Efs 04 b--
n-e u
a
" 7 O
O O
O 4. L.-e
- h-aCD O
sCD sCD sCD G
sCD G
Ce sCD scD O sTe O
O CD sD sCD sEs scD eD o
O scD sD O
O s"I_s CD eXs e.D 4
C4 O
CG 4.fo 4
C4 sCD OCs e.gs v
CJ scq (Q
sN sN 04 e
e n.e
,.e
,.e C D-LaJ g g C s.3 Lig
= = p- ;"E i
e e
i er-u..
i
_-.-m_
PERFORMANCE PROGRAM WUNKUNet t r>s>dnn i 4 ad *
""~
AEPO.W PLMOO iTeiiT
- March 1987, Actual Maine Yankee
~
PERFORMANCE D ATA Unit Rating =
855 MWe Net P'""x8 Hou's i PH 744 WNC (Normal) i"*aaaa
'ei u.a....au ici no,ae toisen : -
its a* a.
umi,outa9a 96.5 0
0 0
0 Hou s Partial i,3 u,,,
aa
,oi s.non..
im>rman.o Psena.o ovuee sten ost, ffgn,tfa 0
0 156,682-March 28, 1987 c
im o, o.a.i iul>
m o.a.,.r.cuw.3 wci 1,313,599 396,930
$ 1,998,893.0
> CALCULATED DATA 96.5
=
647.5 Service Hours a SH = PH - (a + b + c + d + e) =
744 Avadable Hours
- AH = SH + e -
647.5
+
0
=
647.5 183.3 et l
156,682
+
855
=
E4,u a EUNDH = (f + ks + rating 9
o
=
0 Equivsfent Seasonal 0
+
855 Derated Hours = ESDH = g + rating =
4483050.7 x 103 Thermai MeTu s h = 3.4128 =
1,313,599 x
3.4128
=
> CALCULATED PERFORMANCE FACTORS AVAILABILITY FACTOR = AF = (Availabie Hours
- Period Hours = 100 =
AF = ( AH + PH) = 100 =
647.5
+
744 x 100 =
87
/
Equivalent Equivalent i
Seasonal Hours / x 100 =
EQUIVALENT AVAILABitlTY FACTOR = EAF = Available Hours - \\ Oersted Hours
+
Period Hours 647.5 183.3+
0 AH -(EUNOH + ESOH) p, 744
100
CAPACITY FACTOR = CF = Peri d o
a U it Rating 396,930 i
x 100 =
62.4 %
CF>
100
PH = Rating x
855 744 FORCEO OUTAGE RATE = FOR =
Forced O tage Ho
+ Service Hours 0
C x 100 =
0
- FOR,
= 300 l.
C + SH 0
+
647.5 (JNIT HEAT RATE
- HR,
Not Generation (MWe) 4483050.7x10'"
=
11,294.3 eTu "B**
=
KW - H A Hn 396,930 k APPRO M l'Al I' Ant D tlY 7
OATE REVIEWEO By OATE
,/
mW 4/3/87 y
i.
- AMN ANO4ofNDDDDb&44aNAANT>Nk >>
Q e e a e e e e e e e e e e e e e e e o e e o e e e e e e e e e M
et eenANNM M oDDN44 NOD 44M DDNDAAAAA I
oNe4DcNe4DO MADNmMA44DOMAD4DDDDD L
coocoMMM M M NNNNNNAAAnAq q4 q.4 <<qqq L
DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD W
DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD Wx U
U
@HNNO 4cADe>M NO44M ANNc4 NDDONNN NN
.W U
.e o e o e e o e e e e e o e e e e e e e e e e e e e e e e a e w
L D4Ao% AoANPDND4 >47AN N47NDDM M M M M M 2
4 2
0947M 4NDN7NONDM ONDNON*NTM t 44444 J
Q x
NNNN DDDD@ 3PocooM M M M NNNNNADAAAAA D
l 3
AAAAAAAAAAA444 44q444 4 < < <<<<<<<<
W 0-D MM M M M M M M M MM M MM M M M M M M M M M M MM MM M M M x
w A
W x
x ocococococo.oooooooooooooooooooo o
O e e e e o e e e e e e e e e e o e e o e e e e e e e e e e e a w
'O U
DeatnANTDMAADNDeWoDeo4DbAONNNNN JL L
q & c A 4 4 A*D 4 D M N4NDA 744NN4c4M o44 4 qq WX X
M NM MDNAoM angNWHA44DDDTDDDDDDDDD xO%
w t emM N*D4% DP000DDDNTBNNNN M De<
'i J
JNJ4ZM M
04JOX3 o
4 043W30 V
ocooooooooooooooooooooooooooM oo 3
UZA EDJ t
I l
N ll ll ll Il Il il D
x U00 W
H 11H W
Occocococococococococococococco 3
ZZZ O
e gWg1 1
x 03J33A
)
4 UIAEDJ U
E D
M M
o c c o c o c o.c o c o c o c o c o ci o c o c o c o c c o o o E
~
O i
w 4
-WWA 3
W XEx i
M o c o c c o c o c o c o c c o o o c o c o.o c o c o M o o c o
'W DM D
+
'i M'
OH O
- Z L
E t
4 W
M JJ2 4DM ococoooooooooooooooooooooooeoco W
E4 U
e e e e e e o e e o e e e e e e e e o e e e e e e e e o e e e Z
xJJ M
< < t44 @ q@ @ ed q#### et ##qqq tt#4o0 00 M
WM 4 NNNNNNNNNNNNNNNNNNNNNNNNNNN
.i 4
Iqu g-E
>M 4& A l
M M za
-1131 ooooooooooooccoooooooooooooDoom 40VOOM 4
e e e e e e e o e e e e * *
- e e a e e e o e e e o e e e e e 3M owe x
44 q< < t te44 q < Js oDAN M ApM Jr w n Js Jr EXM A A *4 E
NNNWM M M cM M M oo?PDN 4N N DD# ee9D DDDDDDDDDDDDD4 t<**4 4 44 444 #A h
N
,N hh b
b b.
b h hb hb h DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD.
P P 7 D T P p p D P W 7 ?J'D p D D D 7 7 D P P P > P P P 7 b W
H M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M w
NN N N N N N N % % % % % % %% % %%% % % % % % % % % % % %
4 M N A 45 4 8 4) N:DPoM NA#D4% :'O P o N NA 4 D4N D P o.tM C
M M M MM M M M M H N N N N N N N N'N NAA s..
n
tiltAttiatoa 111116: 1 A 111111111111111111211111111111 A A A A 11111 A A A 11111 A l11 A l t 1111111, t
1 i
MAINL YANKLL A10MIC F0btR COMPANY i
l hISCASSET, FAINE NONIHLY RLPORT FOR FAR. 1987
- LLLClHIC LO G *,
H2dlH 1[ AR TD_ pati
('
GROSb LLECTRIC GENER A T ION (MWH) 414490 0 lb77890.0 74278900.0 l
biA110N SLRVICE ( A UX.. IR ANS. ) (MWH) 636.00
'636.00 334599 00 l
STAI10N SERVICE (S TA. TRANS.) (MWH) 17560 00 55909 00 3328851.00 j
l i.
396930.00 1521981.00 70950052.00-.
i NLT LLLCIMIC GENLR AT ION (MWH)
ON LINL TIME ( H OUR S)-
647.45 2063.45 99403.12 l
SHdl 00WN IIME ( FO UR S )
96.55 96.55 26744.20 l
PL ANT C AP ACITY F AC TOR - (OLSIGN NET) 64.67 85 41
,69.30
[
MONTH YEAR S.C.0.
- PLANT PERFORM ANCE LOG
+
NLT PLANT LFFICILNCY (PERCENT) 30.217 31.496 31.390 l
NLT P L A N T 'H E A T. R A T E (BTU /KWH) 11292 20-10833 51
-10870.21
~
PL-ANT 1HERMAL C APA CI T Y ( P E R 'C E N T ).
67.133
'85 063 70.775 RLAC10R PLANT A V AI LA B ILI T Y (PERCEhT)
.B7 339 95.639 85.476 PLANI AVAILABILITY (PERCLNT) 87.023 95 530 78.858 I
MONTH 1[AR TO QAT[
- NUCLEAR LOG
0 166 HLATUPS 0
0 32 SCHAMS U
0 104 C00LCOWNS 1
1 32 SHU1006NS 1
1 163 FULL LOAD HLJEC T IO NS 0
0 29 l
AVLHAGL COHL b u R NU P (MWD / TON) 660.210 2502.239 14361.707*I S.C.O.
- VALUL FROM THL START OF COMMLbCIAL OPtkATION, 12/26/1972 Al 0000
- : VALUL FOR 1HL PklSENT CORL 1
111111111111111111111111111111111111111111111111111111111111111111111111111111111
_ _ - ~ _ _
APR - 6 Es/
]
6 '. s t
Maine gankee
~
1 Mor at h 1 y St at i sat i c a l R e p o r-t f= o r-Mar ch 1987 w..
'4 Docket No.:
50-309 OPERATING DATA REPORT e
a
'Date:
02/Apr/87 Completed By:
J.M.
TAYLOR i
Telephone:
207-882-6321
-1.
Unit Name........................................
Maine Yankee
- 2. Reporting Period................................
March 1987
- 3. Licensed Thermal Power-(MWt)....................
2630 4.
Nameplate Rating (Gross MWe)....................
-864
- 5.. Design Electrical Rating (Net MWe)..............
825
- 6. Maximum Dependable Capacity (Gross MWe).........
850
'7. Maximum Dependable Capacity.(Net MWe)...........
810 L
8.
If Changes in' Capacity Ratings (Items Number 3-7)
LSince'Last Report, Give Reasons:
NO CHANGES c
- 9. Power Level to Which Restricted, if.Any (Net MWe)
NO RESTRICTIONS
- 10. Reasons f or Restrictions, if Any:
?
h
't a
THIS MONTH YEAR-TO-DATE CUMULATIVE g.
- 11. Hours In Reporting Period 744.00 2.160.00
- 12. Number of Hours Reactor Was Critical...........
648.43
-2.064.43 102.193.32 s
-13. Reactor Reserve Shutdown Hours..................
0.t0 0.00 0.00
- 14. Hours Generator On-line..
647.45 2.063.45 99.403.14
- 15. Unit Reserve Shutdown O.00 0.00 0.00 Hours..................
-16. Gross Thermal Energy Generated (MWH)........
1.313.599.00 4.832.241.00 226.089.553.00
- 17. Gross Electrical Energy Generated (MWH)........
414.490.00 1.577.890.00 74.278.900.00 18.' Net Electrical Energy J
Generated (MWH)........
396.930.00 1.521.981.00 70.950.052.00 l
- 19. Unit' Service Factor......
87.02 95.53 78.80 l
- 79.54
- 20. Unit Availability Factor..
87.02 95.53
- 21. Unit Capacity Factor
{
(Using MDC Net)........
65.87 86.99 71.13
- 22. Unit. Capacity Factor (Using DER Net)........
64.67 85.41 69.29
- 23. Unit Forced Outage Rate..
0.00 0.00 6.37
- 24. Shutdowns Scheduled Over Next 6 Months:
NONE
- 25. If Shutdown at End of Report Period, Estimated Date of Startup:
5/12/87
.+
S 6
i
' e. t i s
t l
Docket No:
5p-309 Unit Name:
Maine Yankee
+
Date:
04/Apr/87 Completed By:
J.M.
Taylor 4
-Tel ephone 866-1232-231 4
/
l
. Report Month: March, 1987 l
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCES
'At'the beginning of the month the plant was at 84% power with refueling coastdown in progress.
On March 7th, power was reduced for turbine valve testing, extraction nonreturn valve. testing and excess flow checkvalve testing. Power was increased to 81% on the'7th.
q On March-16th, power was reduced to 75% to repair.a first point heater.
extraction steam valve.
A' po'er was reduced.to 73% to repair a chloride leak in the On March 18th, w
"B" waterbox.of the condenser.
On March 19th, power'wat increased to 75%.
Refueling coastdown continued until late on March 27th when the generator was taken off-line to commence the refueling outage.
The plant was in refueling outage for. the remainder of the-month.
4 i
)
l I
1
'hVNAbEDAILYUNITPOWERLEVEL l
FOR MARCH 1982 t.
Docket No.:
50-309 l
Unit:
Maine Yankee i
Date:
31/ Mar /87 Completed By:
J.M.
TAYLOR Telephone:
207-882-6321 l
l-Day Avg. Daily Power Level Day Avg. Daily Power Level (MWe-Net)
(MWe-Net).
)
1 681 16 607 L
2 677 17 581 s
3 673 18 573
'4 670 19 589 5
663 20 597 6
657 21' 377 i
7 651 22 570 I
8 651 23 569 r
9 647 24 560 10 640 25 549 11-636 26 546 12 635 27 467 13 629 28 O
14 624 29 O
l 15 622 30 O
j 31 O
l 4
1 l
l l
i
______d
UNIT SHUTDOWNS AND' POWER REDUCTIONS
- Docket No.:
50-309 3
t FOR MARCH'1987 Unit:
Maine ~ Yankee Date:
. 02/Apr/87 Completed By: ' J.M.
TAYLOR Telephone:
207-882-6321 Number-16-87-9 Date 870327 Type (1)
S Duration (Hours) 96.5 Reason (2)
C Method-(3) 1 LER #
N/A System Codec(4)-
ZZ.
Component' Code (5)
N/A PLANT SHUTDOWN FOR REFUELING OUTAGE.
Cause and l
Corrective Action
?
1.
TYPE:
2.. REASON: (cont) 4.
SYSTEM CODE:
(F)orced F-Administrative Exhibit G-Instructions (S)cheduled G-Operational-Error for Preparation of Data t
H-Other (Explain)
Entry Sheets for l
l 2.
REASON Licensee Event Report A-Equipment Failure 3.
METHOD:
(LER) File (NUREG.0161)
D-Maintenance or Test 1-Manual I
C-Refueling 2-Manual Scram 5.
COMPONENT CODE:
'D-Regulatory Restriction 3-Automatic Scram Exhibit I-Same source E-Operator Training &
4-Other (Explain) as above.
I License Examination I
l I
l
l Form No. 20-304-4
/
Rev. No.
0 Revised:
MONTH tiarch 1987 j
MAINE YANKEE LOAD REDUCTION TIME DURATION l TIMP l
l TIME l
l TIME l TIME l
l TOTAL l l START l % l STAB-l% [ START l STAB-l% l TIME l
l DAY l DOWN. lPWR I ILIZED IPWR l UP l ILIZED IPWR I (HRS) l REASON l
1 I
1 I
I I
I I
I I
2 I
I I
I I
I I
I I
3 I
I I
I
'l I
I I
I 4
1 1
I I
I I
I i
1 5
I I
I I
I I
I I
I l
6 I
I I
I I
I I
I l
7 L 0301) l 81 1 0315 i 80 1 0345 1
0359 I 81 1 1.0 ITurbine valve testing. EFCV testing 8
I I
I I
I I
I I
I
(
1 9
I I
I I
I I
I I
i l
10 1
I I
I I
I I
I I
11 1
1 I
I I
I I
I I
12 I
I I
I I
I I
I I
q 13 1
1 I
I l
l 1
I I
f 14 1
_. I I
I I
I I
I 4
is I
I I
I I
I I
I 16 l 1546 178.81 1810 1 75 l i
l I
1 Repair first point heater 17 l
__ l l
l
'l l
l 1
lextraction steam valve j
18 l 1438 174.81 1530 1 73 I l
l 1
l Repair chloride Jeak in "B" water 18 I
l 1
i i
l I
l lbox 19 1
l I
l 1 0500 1
0820 1 75 I IHolding for xenon to stabilize 19 I
l l
I i 1830 1
2245 176.11 74.73 1 20-22 I
I I
I I
I I
i 23 I
I I
l I
I I
I I
.24 I
I I
I 1
I I
I I
25 I
I i
l I
I I
1 l
26 1
I I
I I
I I
I I
27 l 1800 1 69 l 2327 1 10 I l
l l
5.45 IShutdown; generator off-line) 28 I
I l
0000 1
0 l l
l l
leefueling outage in progress 29 I
I I
I I
I I
I I
30 l
I l
l l
I l
1 l
31 l
l l
1 I
I l
l l
0020n
Form rio. 20-404-5
?
- 1 Ray. No. O J
Revised:
MONTH March 1987 l
l OUTAGE & AVAILABILITY TIMES l
l (SUB CRIT)
( 500*F)
(OFF-LINE) l TIME l TIME l TIME l TIME l TIME TIME l
RX
- j. RX l RX NOT l RX l UNIT UNIT l
DAY l REASON 1 TRIP l CRIT. I AVAIL. I AVAIL. 1 TRIP l PHASED l 1
l l
l I
l l
I l
2 I
I I
I I
I I
l l
3 I
I I
I I
I I
l 4
I I
I I
I I
I l
5 I
I I
I I
I I
l 6
I I
I I
I I
I i
7 I
I I
I I
I I
l
__-8 I
I I
I I
I I
l 9
l l
l l
l l
1
[
_10_
I I
I I
I I
I i
11 I
I I
I I
I I
l 12 I
I I
I I
I I
l 13 I
I I
I I
l' I
l 14 I
I I
I I
i 1
l 15 I
i i
i I
I I
i 16 I
I I
I I
I I
i 17 I
I I
I I
I I
i 18 I
I I
I I
I I
l 19 I
I I
l l
l l
l 20 I
I I
l 1
I I
I 21 I
I I
I I
I i
l 22 I
I I
I I
I I
I 23 I
I I
I I
I I
l 24 I
I I
I I
I i
l 25 I
I I
I I
I I
l 26 l
l l
l l
l l
l 27 l Manual reactor shutdown to commence I
l I
i l 2327 l l
28 leefueling cutage 1 0026 I I
0148 I
I I
l 29 I
I l
l I
i l
l 30 l
l 1
l l
l l
l 31 I
I i
l l
I I
l 0020n
6 2
8
\\-
1 0
i 1
R R
A A
M,, 2 M
'v A.
A 2
2 g
4 1
B B.
F E.
6
)
\\
oH F
F CT A
T 9
W rM 2
e(
w 1
L o
2 E
P V
E 3
cL 1
i N
N.
mR h
i 5 E oE J
J T
W t
T A
A O
A 8 0 P
2 eY eL kI
~
0 nA 2
aD 2
Y E 1
G C
0 nR D
E.
eA E
4 C.
iE T
A.
aV 6
A M
2 1
8 1
0 1
V V
O O..
N.
2 N
v A.
. 5
. 2 7
1 T.
9 T
0 0.
0 0
t A. 1 0
0 0
0 0
0 0
0 0
0 g
0 0
0 0
0 0
0 0
0 0
0 0
0 0
g 0
0 0
8 6
4 2
0 8
6 4
2 0
g 6
4 2
0' 2
2 z
ne.
1 1
1 1
1 AyERAuE MWTH l
PERFORMANCE PROGRAM WUNKuHeti ehmeria ' a na i
g76 "
AEPORY PERIOO Maine Yankee March 1987, Actual PERFORMANCE DATA Nc"(*[o",8 "
855 MWe Net Period Hours PH 744
,n i)
'C'*
d'"*'*"*
una outana. ""^*9 6. 5 0
0 0
0 Hours Partial iniua, aa.4 ici s..
.i in e aco et.aa.o cui.e. st.<i o.i.
Reduct'oa 0
0 156,682 March 28,1987 MW brs.
(H) o#ges o4aed ab0a (WWin)
(6),6et o.ne#eion (WWe) f uel Cost 1,313,599 396,930
$ 1,998,893.0 i
b CALCULATED DATA 647.5 96.5 Service Hours
- SH = PH - (a + b + c + d + e) =
744
=
647.5 Available Hours = AH = SH + e =
647.5 s
0
=
183.3 156.682
+
855
=
r$
o
= EUNDH = (f + k) + rating l
Equivalent Seasonal 0
+
855 0
Oerated Hours = ESOH = g + rating.
I 3
4483050.7 x 10 Therrnal MBTU's a h a 3.4128 =
1,313,599 x
3.4128
=
% CALCULATED PERFORMANCE FACTORS AVAILABILITY FACTOR = AF = (Available Hours + Period Hours) x 100 =
AF * ( AH + PH) = 1M "'
647.5
+
744 x 100 =
87 Equivalent Equivalent i
Available Hours - ( Oersted Hours Seasonal Hours J x 100 =
+
EQUIVALENT AVAILABILITY FACTOR = EAF =
Period Hours 647.5 183.3+
0 AH -(EUNDH + ESOH)
EAF5
100
x 100 =
62.4 %
744
100
CAPACITY FACTOR = CF = pg 396,930 i
CF*
100
x 100 =
62.4 %
p 744 x
855 FORCED OUTAGE RATE = FOR =
Forced Outage Ho s + Service Hours 0
{
C 100 =
0 FOR'
= 100 c. SH 0
+
647.5 N88 G*n'r8ti n (MW8) 4483050.7x100 UNIT HE AT RATE
- Hn 11,294.3 eTu Maius KW.HA 396,930 k APPROJAth o
l'Oi l'AHf () OY
/
OATE REVIEWEO DY OATE
,/
c# L/
4/3/87
l ll(l 0 47 86b997661 2632977/ 77 44 a1 7 37 0 4
D T
44 4433221 1 0987 6420 6641 852833333 H
02 4680 24 680 1 35791 3 4 6801356888 e6 P
00 00 O 1 1 11 1222222333334 4 4
- 4. 4 4 4 4 s4 F
68 88b6886868688888b e88U6886b es8 E
E886E66686 88E8E886t666E 6888b ee8 E
R C
C 91 220 6038491 20461 37204788577777 E
C P
8630 / 30 529b284 949372692581 1 1 1 1 1 T
l N
A N
03691 47 9247 02b7 02570247 91 4 66666 E
D R
7 777 e68e999000 01 1 1 1 222223333333 S
U 33333333333444444 4 4 4 4 4 4 4444 4 4 4 4 E
0 B
1 1 1 1 1 11 1 1 11 1 11 1 1 1 1 1 1 1 1 1 1 1 1 11 1 1 1 R
1 F
S R
R 00 000 0 0 0000 000000 0 00000 0 0 000 00 0 O
U F
O C
64 0 9332991335754605406593077777 EH P
4 60 366 38691 247 51 9667260 61044 4 4 4 SR H
1 71 1 82301 67 47673645889959988888 ROK I
4 691 24 b6789000 98529627 27 1 b44 4 4 4 SUCE W
7 2738383836 49483637271 605933333 NO W
M 4556677889900 1 1 2 2 3 3' 445566677777 OHT O 66666666666777777777 77777777777 G
I NP 2222222222222222222222222222222 O
T LE L
CASL R
LMEL L
00000000000000000 00000000000000 S
JRRU F
R EEPF E
RH B
T Rl M
S D
Oh U
U N
AT FL H
000 00 00 00000000 00000000000 00000 N
WSOI L
OPLAPA Y
DU WUV L
LTLAN1 I
OALGRU D
A OtUEUG C
00 0 000 0000 0000000 000 00 0 000 0 0 1 00 D
ChF MLL 7
- : : = = :
8 R
9 CCD E
1 PPT S
00 00 0 000000000000000000000000 00 U
HNH O
RTRP P
R DULWUF A
CHF MBL C
M U
I S
000 0 00000000000 00000 00000 000 00 0 M
O
)
T A
SLS D
E RMR S
00 000 00000000 0000 0000000001000 0 E
UI U P
OT O N
H H
A E
J LLN AOI 00000 0000000000000 000000 0004000 E
MA C
N RLL T
44 4 4 4 4 44444 444 44 4 4 44 4 44 444 40 0 00
^
I EI A 222222222222222222222222222 A
HAC TI M
I VI AT S l
I NS RR WP 00 0 00 0 0000 0000 000 000 0 00 0 0 0 0 60 0 0 l
AOCObS A
WT CiM H
4 4 4 4 4 4 4 44 44 4 4 4 4 44 4 44 4 44 44 441 0 0 0 ACL1 k A 22222 2222222222222222222222 GAM 0AR m
LLI hI C i
FHT SSS u
m h
- : = : : :
0 0 00 0 0 000 0 0 000 0 0 0000 000 C 0 000 0 00 b
H 0 6694 0 970 220 22 6 924 59669' 47 7 0 0 0 0 01 3320 656221 23/5660 0 4 4 364b 4 I
I k A CLL W
5 6 3 t 7 4 070 t0 7 d5 0 03 1 1 391 5 6 35 5 MRT SSS M
22221 1 1 01 1 1 00 95 67 6/7 554 4 4 68 b5555555555 554 4 4 4 4 4 4 4 4 4 4 4 43 A
// 7 / 7 /1 7 7 //7 / 7 /7 7 / /7 7/7 //77 / 7/7 t 6 8E 6 6 6e6 F 6 6 LE 66866668 66 66886 88 5 9 9999 999999S 59599999999999 9 9 92 E
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 T
/ / / / / / / / / / / / // // / / / / / / //// / / ///
A 1 2 ahtt7 e5 0 1 2d 4 56/8 50 1 22 4 5 t/6 30 1 05 D
1 1 1 1 1 1 1 1 1 1 2222 22222 y/ / -
/. / / / / / / /. /. / / / / / / / / / / / / / /
/ / / / /
e
,l ll(
'l l i 111111.2111111111.1111111111111111111111111111111111111111111 A 1 A 11111111111111111 M
- ". - 1 1
e 1
MAINL YANKtt AIOMIC FGktR COMPANY LIECASSEI, FAINE MONIHLY Rt POR T FOR FAR. 1987 LLLC1RIC LO G *
$231H li AR TD_MATL GRobb LLECiklC GENLMA110N (MWH) 414490 0 1577890.0- 74278900 0 blA110N SLRVICL ( A UX. TRANS.) ( M W H')
636 00
'636.00 33.4599.00 STAl10N SLRVICE (S T A. TRANS.) (MWh) 17560 00 55909 00 3328851 00 NL1 LLLCIRIC GLNLRATION (MWH) 396930.00 1521981.00 -70950052.00--
ON L.NL TIML ( H OUR S) 647.45 2063.45 99403 12 SHUI DOWN llME ( FO UR S ).
96.55 96 55 26744.20 PLANI C AP ACI T Y F AC TO R - (DLSI GN NET) 64.67
'85 41-69.30--
- PLANT PERFO RM ANCE LOG
- MgNIH 1[AE S.C.0.
NLT PLANT HLAT H AI E (Blu/KWH) 11292 20-
-10833 51-10870.21--
(PER'ENT).
67.133 85 063 70 775 PLANT lHERMAL C APA C11 Y C
RLACl0K PLANT AV AI LA BILITY ( P E R C E r, T )
87.339 95.639 85 476 PLANT AVAILABILITY (PLHCtNI) 87.023 95 530 78 858
- NUCLLAR LCG
- UgNJh 1[f3 JO_ pal {
GROSS THERMAL bEf.EHATION (MWH).
13135.99.0 4832241.0 226089553.0 SIAhlVPb 0
0 166 HLATUPS 0
0 32 SCRAMS 0
0 104 000LCOLAS 1
1 32 bHUlDCLNb 1
1 163 FULL LOAD R L J L C I 10 NS 0
0 29 AVLHAGL COHL BUR AU P (MWu/ TON) 6b0.210 2502.239 14361.707*
S.C.O.
- VALUt P RO M 1hL START OF COMMLbLIAL CPtkATION, 12/28/1972 A1 0000
- ; VALUL FOR lH L PklSLNI C0kt 1111111111111111111111111111111111111111111111111111111111111111111111111111111111'
A3 t
MAIRE HARHEE 'ATOMICPOWERCOMPARUe
,uaugr,Tl,,?n"g%,
(207) 623 352:
.we April 7, 1987 HN-87-45 G0H-87-91 Office of Resource Management United States Nuclear Regulatory Commission Washington, D. C.
20555 Attention:
Mr. Richard A. Hartfield, Chief Management Information Branch
References:
(a)
License No. OPR-36 (Docket No. 50-309)
(b)
NUREG-0020, Licensed Operating Reactors Status Summary l
Report
Subject:
Maine Yankee Monthly Statistical Report Gentlemen:
Enclosed you will find the Monthly Statistical Report for the Maine Yankee Atomic Power Station for April, 1987.
3 Very truly yours, MAINE YANKEE ATOMIC POWER COMPANY
-4Bw)W G. D. Whittier, Manager Nuclear Engineering and Licensing GDH/bjp Enclosure cc: Mr. Asbok C.'Thadani Dr. Thomas E. Murley Mr. Pat Sears Mr. Cornelius F. Holden L
gi 8619L-LM0 I