50-309 OPERATING DATA ~ REPORT.

Date:

02/Apr/87 Completed By:

J.M.

TAYLOR Telephone:

207-882-6321

1. Unit Name.......................................

Maine Yankee

2. Re.corting Period................................

March 1987

3.. Licensed Thermal Power (MWt)....................

2630

4. Nameplate Rating fGross MWe)....................

864

~5.

Design Einctrict) Rating (Net MWe)..............

825

6. Maximum DependabO2 Capacity (Gross MWe).........

850

7. Maximum DependaL'.e Capacity (Net MWe)...........

810 8.

If Changes in Capacity. Ratings (Items Number 3-7)

Since 1.ast Report, Give Reasons:

NO CHANGES

9. Power Level to Which Restricted, if Any (Net MWe)

NO RESTRICTIONS 10.~ Reasons for Restrictions, if Any:

THIS MONTH YEAR-TO-DATE CUMULATIVE

11. Hours In Reporting Period 744.00 2.160.00
12. Number of Hours Reactor Was Critical...........

648.43 2.064.43 102.193.32

13. Reactor Reserve Shutdown Hours..................

0.00 0.00 0.00

14. Hours Generator On-line..

647.45 2.063.45 99.403.14

15. Unit Reserve Shutdown Hours..................

0.00 0.00 0.00

16. Gross Thermal Energy Generated.(MWH)........

1.313.599.00 4.832.241.00

.226.089.553.00 '

17. Gross Electrical Energy Generated (MWH)........

414.490.00 1.577.890.00 74.278.900.00

18. Net Electrical Energy Generated (MWH)........

396.930.00

__1.521.981.00 70.950.052.00

19. Unit Service Factor......

87.02 95.53 78.80 79.54

20. Unit Availability Factor..

87.02 95.53

21. Unit Capacity Factor (Using MDC Net)........

65.87 86.99 71.13

22. Unit Capacity Factor (Using DER Net)........

64.67 85.41 69.29

23. Unit Forced Outage Rate..

0.00 0.00 6.37

24. Shutdowns Scheduled Over Next 6 Months:

NONE

25. If Shutdown at End of Report Period, Estimated Date of Startup:

5/12/87 i

f[j8190366870331

~

R ADOCK 05000309 PDR

)

1

7 Docket Nos

50-309 Unit Name:

Maine Yankee Date:

04/Apr/87 Completed By:

J.M.

Taylor l

Telephone:

866-1232-231 I

Report Month: March, 1987 l

NARRATIVE

SUMMARY

OF OPERATIN8 EXPERIENCES i

At the beginning of the month the plant was at 84% power with ref ueling coastdown in progress.

On March 7th, power was reduced for turbine valve testing, extraction i

nonreturn valve testing and excess flow checkvalve testing. Power was increased to 81% on the 7th.

On March 16th, power was reduced to 75% to repair a first point heater-extraction steam valve.

On March 18th,. power was reduced to 73% to repair a chloride leak in the i

"B" waterbox of the condenser.

On March 19th, power was increased to 75%.

Refueling coastdown continued until late on March.27th when the generator was taken off-line to commente the refueling outage.

The plant was in refueling outage for the remainder of the month.

)

iJ i.

1 1

AVERAGE DAILY UNIT POWER LEVEL FOR MARCH 1987 I

Docket No.:

50-309

' ' Maine Yankee Unit:

Date:

31/ Mar /87 Completed By:

J.M.

TAYLOR Telephone:

207-882-6321 1

4 1

Day Avg.' Daily Power Level Day Avg. Daily Power Level t

(MWe-Net)

(MWe-Net) f1' 681 16 607 2

677 17 581 3

673 18 573 4

670 19 589 5

663 20 597 6

657 21 579 7

651 22 570 8

651 23 569 9

647 24 560 10 640 25 549 11 636 26 546 635 27 467 12 13 629 28 D

I

~

14 624 29 O

O 15 622 30 O

l 31 1

)

UNIT" SHUTDOWNS AND POWER REDUCTIONS Docket No.

50-309 FOR MARCH 1987 Units Maino Yankee Date:

02/Apr/87

. ' J.M.

TAYLOR Completed By:

Telephone:

207-882-6321 Number 16-87-9 Date 870327 Type (1)

S Duration (Hours) 96.5 i

Rmason (2)

C l

M3thod (3) 1 LER #

N/A t

System Code (4)

ZZ Component Code (5)

N/A PLANT SHUTDOWN FOR REFUELING OUTAGE.

Cause and q

Corrective Action 1.. TYPE:

2.

REASON: (cont) 4.

SYSTEM CODE:

(F)orced F-Administrative Exhibit G-Instructions (S)cheduled G-Operational Error for Preparation of Data H-Other (Explain)

Entry Sheets for 2.

REASON Licensee Event Report A-Equipment Failure 3.

METHOD:

(LER) File (NUREG.0161)

B-Maintenance or Test 1-Manual C-Refueling 2-Manual Scram 5.

COMPONENT CODE:

D-Regulatory Restriction 3-Automatic Scram Exhibit I-Same source E-Operator Training &

4-Other (Explain) as above.

l License ED< amination

Form No. ZU-304-4.

l

]

R::v. No.

0

~

Rsvised; MONTH March 1987 MAINE YANKEE LOAD REDUCTION TIME DURATION

-l TIME' l TIME l TIME l TIME l

l TOTAL l l START

% l STAB-l START l STAB-l% l TIME l

DAY l DOWN IPWR I ILIZED lPWR I UP l ILICED lPVR I (HRS) l REASON 1

1 I

I I

I I

I I

I

. _2.1._ I I

I I

I I

i l

i u?

3' ?M_

l i

1 l

i I

I I

I 4 ' l' I

I I

I I

I i

l i

5 I

I I

I I

I I

I I

q 6

I I

I I

I I

I I

I i

7' I 0300 l 81 1 0315 1 80 l 0345, l 0359 1 81 l 1.0 ITurbine valve testing. EFCV testing '

8' I I

I I

I I

I I

I

)

9 I

l l

l l

l l

l l

{

a 10 l

I I

I I

I I

l, 11 l'

I I

I I

I I

I I

i 12 I

I I

I I

-1 I

I i

13 I

I I

I I

I I

I i

14 l

l

~l I

l l

l I

l j

f 15 I

i l

l l

l l

1 I

16 l 1546 178.81 1810 1 75 l l

l l

l Repair first point heater i

17 l

l l

l

'l l

l l

lextraction steam valve 10, 1 1438 174.81 1530 1 73 l l

l l

IRepair chloride leak in "B" water 18 l

1 l

l l

1 l

lbox 5

l l

l l,,,. 1 0500 1

0820 1 75 l IHolding for xenon to stabilize 19 l

l l

l l 1830 l

2245 176.11 74.73 1 20-22 l

l l

l 1

1 I

l l

23 1

l l

1 I

I l

l l

.24 I

I I

I I

I I

I I

25-1 I

I I

L I

I I

I 26 1

l l

I l

l 1

l l

27 l 1800 1 69 l 2327 l 10 l l

l 1

5.45 IShutdown; generator off-line; 28 l

l l

0000 l

0l l

l l

leefueling outage in progress 29 I

I i

i l

i l

i l

30 l

I I

I J

l l

I I

'31 I

I I

I I

I I

I I

)

0020n

f I

Form to. 20-404-5 Rev. No. 0 Revised:

MONTH March 1987 OUTAGE & AVAILABILITY TIMES (SUB CRIT)

( 500'F)

(OFF-LINE)

TIME l TIME TIME l TIME l TIME l TIME l

RX l, RX

. RX NOT l RX l UNIT l UNIT l

l l

DAY l REASON l TRIP l CRIT. I AVAIL. I AVAIL l TRIP l PHASED l 1

l l

l l

l l

l l

2 I

I I

l l

l l

l 3

l I

I I

I I

l l

4 I

I I

I I

I l

l 5

1 1

I I

I I

I l

6 I

I I

I I

I I

l 7

I I

I I

I I

I l

8 I

I I

I I

I I

l 9

l l

l l

l I

l l

10 1 I

I I

I I

I l

11 1

I I

I I

i l

l 12 I

I I

I I

I I

l 13 I

I I

I I

l' l

l 14 I

I I

I I

I I

l 15 I

I I

I I

I I

l 16 I

I I

I i

i I

l

_1.]

I I

I I

I I

I l

18 I

I I

I I

I I

i 19 I

I l

l I

I l

l 20 1

I I

I i

l l

l 21 I

I I

I I

i I

l 22 I

I I

l l

1 I

l 33 I

I I

I I

I I

l 24 I

I I

I I

I I

l 25 I

I i

I I

I I

l 26 1

I l

l I

I l

l 27 IManual reactor shutdown to commence l

I J

l l 2327 l l

28 Irefueling outage 1 0026 l l,0148 1

I I

l 29 I

l l

l l

l l

l 30 l

I l

l l

l l

31 1

I l

l I

I i

l 0020n i

a

w vsa s" "

s.fs 04 sOCs w

sD e

A e

er

_I

--Q-

~

A

- OJ 04 04 W

~~e m

J m

w w <o og b

w u==

?

04 3

O CJ W

~">

- m.

W O -. J

.p e e=e Z r.

& DC tra w o w w

yM p.

4 6-aCI" O

s0Cs c CA.

1

  • l1A >--

532 2 o

eM M gy C C rill$ Q C4

..e

>w t9 O

O El18 C

,W LaJ

=

cr :- -t C rac w

eeW 4

51l$ D N

C lE

~

o

--e I

- e

-e s

3o

_o y

-r

  • 7N Efs 04 b--

n-e u

a

" 7 O

O O

O 4. L.-e

- h-aCD O

sCD sCD sCD G

sCD G

Ce sCD scD O sTe O

O CD sD sCD sEs scD eD o

O scD sD O

O s"I_s CD eXs e.D 4

C4 O

CG 4.fo 4

C4 sCD OCs e.gs v

CJ scq (Q

sN sN 04 e

e n.e

,.e

,.e C D-LaJ g g C s.3 Lig

= = p- ;"E i

e e

i er-u..

i

_-.-m_

PERFORMANCE PROGRAM WUNKUNet t r>s>dnn i 4 ad *

""~

AEPO.W PLMOO iTeiiT

  • March 1987, Actual Maine Yankee

~

PERFORMANCE D ATA Unit Rating =

855 MWe Net P'""x8 Hou's i PH 744 WNC (Normal) i"*aaaa

'ei u.a....au ici no,ae toisen : -

its a* a.

umi,outa9a 96.5 0

0 0

0 Hou s Partial i,3 u,,,

aa

,oi s.non..

im>rman.o Psena.o ovuee sten ost, ffgn,tfa 0

0 156,682-March 28, 1987 c

im o, o.a.i iul>

m o.a.,.r.cuw.3 wci 1,313,599 396,930

$ 1,998,893.0

> CALCULATED DATA 96.5

=

647.5 Service Hours a SH = PH - (a + b + c + d + e) =

744 Avadable Hours

  • AH = SH + e -

647.5

+

0

=

647.5 183.3 et l

156,682

+

855

=

E4,u a EUNDH = (f + ks + rating 9

o

=

0 Equivsfent Seasonal 0

+

855 Derated Hours = ESDH = g + rating =

4483050.7 x 103 Thermai MeTu s h = 3.4128 =

1,313,599 x

3.4128

=

> CALCULATED PERFORMANCE FACTORS AVAILABILITY FACTOR = AF = (Availabie Hours

  • Period Hours = 100 =

AF = ( AH + PH) = 100 =

647.5

+

744 x 100 =

87

/

Equivalent Equivalent i

Seasonal Hours / x 100 =

EQUIVALENT AVAILABitlTY FACTOR = EAF = Available Hours - \\ Oersted Hours

+

Period Hours 647.5 183.3+

0 AH -(EUNOH + ESOH) p, 744

100

CAPACITY FACTOR = CF = Peri d o

a U it Rating 396,930 i

x 100 =

62.4 %

CF>

100

PH = Rating x

855 744 FORCEO OUTAGE RATE = FOR =

Forced O tage Ho

+ Service Hours 0

C x 100 =

0

FOR,

= 300 l.

C + SH 0

+

647.5 (JNIT HEAT RATE

Not Generation (MWe) 4483050.7x10'"

=

11,294.3 eTu "B**

=

KW - H A Hn 396,930 k APPRO M l'Al I' Ant D tlY 7

OATE REVIEWEO By OATE

,/

mW 4/3/87 y

i.

    • AMN ANO4ofNDDDDb&44aNAANT>Nk >>

Q e e a e e e e e e e e e e e e e e e o e e o e e e e e e e e e M

et eenANNM M oDDN44 NOD 44M DDNDAAAAA I

oNe4DcNe4DO MADNmMA44DOMAD4DDDDD L

coocoMMM M M NNNNNNAAAnAq q4 q.4 <<qqq L

DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD W

DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD Wx U

U

@HNNO 4cADe>M NO44M ANNc4 NDDONNN NN

.W U

.e o e o e e o e e e e e o e e e e e e e e e e e e e e e e a e w

L D4Ao% AoANPDND4 >47AN N47NDDM M M M M M 2

4 2

0947M 4NDN7NONDM ONDNON*NTM t 44444 J

Q x

NNNN DDDD@ 3PocooM M M M NNNNNADAAAAA D

l 3

AAAAAAAAAAA444 44q444 4 < < <<<<<<<<

W 0-D MM M M M M M M M MM M MM M M M M M M M M M M MM MM M M M x

w A

W x

x ocococococo.oooooooooooooooooooo o

O e e e e o e e e e e e e e e e o e e o e e e e e e e e e e e a w

'O U

DeatnANTDMAADNDeWoDeo4DbAONNNNN JL L

q & c A 4 4 A*D 4 D M N4NDA 744NN4c4M o44 4 qq WX X

M NM MDNAoM angNWHA44DDDTDDDDDDDDD xO%

w t emM N*D4% DP000DDDNTBNNNN M De<

'i J

JNJ4ZM M

04JOX3 o

4 043W30 V

ocooooooooooooooooooooooooooM oo 3

UZA EDJ t

I l

N ll ll ll Il Il il D

x U00 W

H 11H W

Occocococococococococococococco 3

ZZZ O

e gWg1 1

x 03J33A

)

4 UIAEDJ U

E D

M M

o c c o c o c o.c o c o c o c o c o ci o c o c o c o c c o o o E

~

O i

w 4

-WWA 3

W XEx i

M o c o c c o c o c o c o c c o o o c o c o.o c o c o M o o c o

'W DM D

+

'i M'

OH O

  • Z L

E t

4 W

M JJ2 4DM ococoooooooooooooooooooooooeoco W

E4 U

e e e e e e o e e o e e e e e e e e o e e e e e e e e o e e e Z

xJJ M

< < t44 @ q@ @ ed q#### et ##qqq tt#4o0 00 M

WM 4 NNNNNNNNNNNNNNNNNNNNNNNNNNN

.i 4

Iqu g-E

>M 4& A l

M M za

-1131 ooooooooooooccoooooooooooooDoom 40VOOM 4

e e e e e e e o e e e e * *

  • e e a e e e o e e e o e e e e e 3M owe x

44 q< < t te44 q < Js oDAN M ApM Jr w n Js Jr EXM A A *4 E

NNNWM M M cM M M oo?PDN 4N N DD# ee9D DDDDDDDDDDDDD4 t<**4 4 44 444 #A h

N

,N hh b

b b.

b h hb hb h DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD.

P P 7 D T P p p D P W 7 ?J'D p D D D 7 7 D P P P > P P P 7 b W

H M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M w

NN N N N N N N % % % % % % %% % %%% % % % % % % % % % % %

4 M N A 45 4 8 4) N:DPoM NA#D4% :'O P o N NA 4 D4N D P o.tM C

M M M MM M M M M H N N N N N N N N'N NAA s..

n

tiltAttiatoa 111116: 1 A 111111111111111111211111111111 A A A A 11111 A A A 11111 A l11 A l t 1111111, t

1 i

MAINL YANKLL A10MIC F0btR COMPANY i

l hISCASSET, FAINE NONIHLY RLPORT FOR FAR. 1987

  • LLLClHIC LO G *,

H2dlH 1[ AR TD_ pati

('

GROSb LLECTRIC GENER A T ION (MWH) 414490 0 lb77890.0 74278900.0 l

biA110N SLRVICE ( A UX.. IR ANS. ) (MWH) 636.00

'636.00 334599 00 l

STAI10N SERVICE (S TA. TRANS.) (MWH) 17560 00 55909 00 3328851.00 j

l i.

396930.00 1521981.00 70950052.00-.

i NLT LLLCIMIC GENLR AT ION (MWH)

ON LINL TIME ( H OUR S)-

647.45 2063.45 99403.12 l

SHdl 00WN IIME ( FO UR S )

96.55 96.55 26744.20 l

PL ANT C AP ACITY F AC TOR - (OLSIGN NET) 64.67 85 41

,69.30

[

MONTH YEAR S.C.0.

  • PLANT PERFORM ANCE LOG

+

NLT PLANT LFFICILNCY (PERCENT) 30.217 31.496 31.390 l

NLT P L A N T 'H E A T. R A T E (BTU /KWH) 11292 20-10833 51

-10870.21

~

PL-ANT 1HERMAL C APA CI T Y ( P E R 'C E N T ).

67.133

'85 063 70.775 RLAC10R PLANT A V AI LA B ILI T Y (PERCEhT)

.B7 339 95.639 85.476 PLANI AVAILABILITY (PERCLNT) 87.023 95 530 78.858 I

MONTH 1[AR TO QAT[

  • NUCLEAR LOG
  • GROSS THERM AL GE NE RA T ION (MWH) 13135.99 0 4832241.0 226089553.0 STAH10PS 0

0 166 HLATUPS 0

0 32 SCHAMS U

0 104 C00LCOWNS 1

1 32 SHU1006NS 1

1 163 FULL LOAD HLJEC T IO NS 0

0 29 l

AVLHAGL COHL b u R NU P (MWD / TON) 660.210 2502.239 14361.707*I S.C.O.

VALUL FROM THL START OF COMMLbCIAL OPtkATION, 12/26/1972 Al 0000
  • : VALUL FOR 1HL PklSENT CORL 1

111111111111111111111111111111111111111111111111111111111111111111111111111111111

_ _ - ~ _ _

APR - 6 Es/

]

6 '. s t

Maine gankee

~

1 Mor at h 1 y St at i sat i c a l R e p o r-t f= o r-Mar ch 1987 w..

'4 Docket No.:

50-309 OPERATING DATA REPORT e

a

'Date:

02/Apr/87 Completed By:

J.M.

TAYLOR i

Telephone:

207-882-6321

-1.

Unit Name........................................

Maine Yankee

2. Reporting Period................................

March 1987

3. Licensed Thermal Power-(MWt)....................

2630 4.

Nameplate Rating (Gross MWe)....................

-864

5.. Design Electrical Rating (Net MWe)..............

825

6. Maximum Dependable Capacity (Gross MWe).........

850

'7. Maximum Dependable Capacity.(Net MWe)...........

810 L

8.

If Changes in' Capacity Ratings (Items Number 3-7)

LSince'Last Report, Give Reasons:

NO CHANGES c

9. Power Level to Which Restricted, if.Any (Net MWe)

NO RESTRICTIONS

10. Reasons f or Restrictions, if Any:

?

h

't a

THIS MONTH YEAR-TO-DATE CUMULATIVE g.

11. Hours In Reporting Period 744.00 2.160.00
12. Number of Hours Reactor Was Critical...........

648.43

-2.064.43 102.193.32 s

-13. Reactor Reserve Shutdown Hours..................

0.t0 0.00 0.00

14. Hours Generator On-line..

647.45 2.063.45 99.403.14

15. Unit Reserve Shutdown O.00 0.00 0.00 Hours..................

-16. Gross Thermal Energy Generated (MWH)........

1.313.599.00 4.832.241.00 226.089.553.00

17. Gross Electrical Energy Generated (MWH)........

414.490.00 1.577.890.00 74.278.900.00 18.' Net Electrical Energy J

Generated (MWH)........

396.930.00 1.521.981.00 70.950.052.00 l

19. Unit' Service Factor......

87.02 95.53 78.80 l

79.54
20. Unit Availability Factor..

87.02 95.53

21. Unit Capacity Factor

{

(Using MDC Net)........

65.87 86.99 71.13

22. Unit. Capacity Factor (Using DER Net)........

64.67 85.41 69.29

23. Unit Forced Outage Rate..

0.00 0.00 6.37

24. Shutdowns Scheduled Over Next 6 Months:

NONE

25. If Shutdown at End of Report Period, Estimated Date of Startup:

5/12/87

.+

S 6

i

' e. t i s

t l

Docket No:

5p-309 Unit Name:

Maine Yankee

+

Date:

04/Apr/87 Completed By:

J.M.

Taylor 4

-Tel ephone 866-1232-231 4

/

l

. Report Month: March, 1987 l

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCES

'At'the beginning of the month the plant was at 84% power with refueling coastdown in progress.

On March 7th, power was reduced for turbine valve testing, extraction nonreturn valve. testing and excess flow checkvalve testing. Power was increased to 81% on the'7th.

q On March-16th, power was reduced to 75% to repair.a first point heater.

extraction steam valve.

A' po'er was reduced.to 73% to repair a chloride leak in the On March 18th, w

"B" waterbox.of the condenser.

On March 19th, power'wat increased to 75%.

Refueling coastdown continued until late on March 27th when the generator was taken off-line to commence the refueling outage.

The plant was in refueling outage for. the remainder of the-month.

4 i

)

l I

1

'hVNAbEDAILYUNITPOWERLEVEL l

FOR MARCH 1982 t.

Docket No.:

50-309 l

Unit:

Maine Yankee i

Date:

31/ Mar /87 Completed By:

J.M.

TAYLOR Telephone:

207-882-6321 l

l-Day Avg. Daily Power Level Day Avg. Daily Power Level (MWe-Net)

(MWe-Net).

)

1 681 16 607 L

2 677 17 581 s

3 673 18 573

'4 670 19 589 5

663 20 597 6

657 21' 377 i

7 651 22 570 I

8 651 23 569 r

9 647 24 560 10 640 25 549 11-636 26 546 12 635 27 467 13 629 28 O

14 624 29 O

l 15 622 30 O

j 31 O

l 4

1 l

l l

i

______d

UNIT SHUTDOWNS AND' POWER REDUCTIONS

- Docket No.:

50-309 3

t FOR MARCH'1987 Unit:

Maine ~ Yankee Date:

. 02/Apr/87 Completed By: ' J.M.

TAYLOR Telephone:

207-882-6321 Number-16-87-9 Date 870327 Type (1)

S Duration (Hours) 96.5 Reason (2)

C Method-(3) 1 LER #

N/A System Codec(4)-

ZZ.

Component' Code (5)

N/A PLANT SHUTDOWN FOR REFUELING OUTAGE.

Cause and l

Corrective Action

?

1.

TYPE:

2.. REASON: (cont) 4.

SYSTEM CODE:

(F)orced F-Administrative Exhibit G-Instructions (S)cheduled G-Operational-Error for Preparation of Data t

H-Other (Explain)

Entry Sheets for l

l 2.

REASON Licensee Event Report A-Equipment Failure 3.

METHOD:

(LER) File (NUREG.0161)

D-Maintenance or Test 1-Manual I

C-Refueling 2-Manual Scram 5.

COMPONENT CODE:

'D-Regulatory Restriction 3-Automatic Scram Exhibit I-Same source E-Operator Training &

4-Other (Explain) as above.

I License Examination I

l I

l

l Form No. 20-304-4

/

Rev. No.

0 Revised:

MONTH tiarch 1987 j

MAINE YANKEE LOAD REDUCTION TIME DURATION l TIMP l

l TIME l

l TIME l TIME l

l TOTAL l l START l % l STAB-l% [ START l STAB-l% l TIME l

l DAY l DOWN. lPWR I ILIZED IPWR l UP l ILIZED IPWR I (HRS) l REASON l

1 I

1 I

I I

I I

I I

2 I

I I

I I

I I

I I

3 I

I I

I

'l I

I I

I 4

1 1

I I

I I

I i

1 5

I I

I I

I I

I I

I l

6 I

I I

I I

I I

I l

7 L 0301) l 81 1 0315 i 80 1 0345 1

0359 I 81 1 1.0 ITurbine valve testing. EFCV testing 8

I I

I I

I I

I I

I

(

1 9

I I

I I

I I

I I

i l

10 1

I I

I I

I I

I I

11 1

1 I

I I

I I

I I

12 I

I I

I I

I I

I I

q 13 1

1 I

I l

l 1

I I

f 14 1

_. I I

I I

I I

I 4

is I

I I

I I

I I

I 16 l 1546 178.81 1810 1 75 l i

l I

1 Repair first point heater 17 l

__ l l

l

'l l

l 1

lextraction steam valve j

18 l 1438 174.81 1530 1 73 I l

l 1

l Repair chloride Jeak in "B" water 18 I

l 1

i i

l I

l lbox 19 1

l I

l 1 0500 1

0820 1 75 I IHolding for xenon to stabilize 19 I

l l

I i 1830 1

2245 176.11 74.73 1 20-22 I

I I

I I

I I

i 23 I

I I

l I

I I

I I

.24 I

I I

I 1

I I

I I

25 I

I i

l I

I I

1 l

26 1

I I

I I

I I

I I

27 l 1800 1 69 l 2327 1 10 I l

l l

5.45 IShutdown; generator off-line) 28 I

I l

0000 1

0 l l

l l

leefueling outage in progress 29 I

I I

I I

I I

I I

30 l

I l

l l

I l

1 l

31 l

l l

1 I

I l

l l

0020n

Form rio. 20-404-5

?

- 1 Ray. No. O J

Revised:

MONTH March 1987 l

l OUTAGE & AVAILABILITY TIMES l

l (SUB CRIT)

( 500*F)

(OFF-LINE) l TIME l TIME l TIME l TIME l TIME TIME l

RX

j. RX l RX NOT l RX l UNIT UNIT l

DAY l REASON 1 TRIP l CRIT. I AVAIL. I AVAIL. 1 TRIP l PHASED l 1

l l

l I

l l

I l

2 I

I I

I I

I I

l l

3 I

I I

I I

I I

l 4

I I

I I

I I

I l

5 I

I I

I I

I I

l 6

I I

I I

I I

I i

7 I

I I

I I

I I

l

__-8 I

I I

I I

I I

l 9

l l

l l

l l

1

[

_10_

I I

I I

I I

I i

11 I

I I

I I

I I

l 12 I

I I

I I

I I

l 13 I

I I

I I

l' I

l 14 I

I I

I I

i 1

l 15 I

i i

i I

I I

i 16 I

I I

I I

I I

i 17 I

I I

I I

I I

i 18 I

I I

I I

I I

l 19 I

I I

l l

l l

l 20 I

I I

l 1

I I

I 21 I

I I

I I

I i

l 22 I

I I

I I

I I

I 23 I

I I

I I

I I

l 24 I

I I

I I

I i

l 25 I

I I

I I

I I

l 26 l

l l

l l

l l

l 27 l Manual reactor shutdown to commence I

l I

i l 2327 l l

28 leefueling cutage 1 0026 I I

0148 I

I I

l 29 I

I l

l I

i l

l 30 l

l 1

l l

l l

l 31 I

I i

l l

I I

l 0020n

6 2

8

\\-

1 0

i 1

R R

A A

M,, 2 M

'v A.

A 2

2 g

4 1

B B.

F E.

6

)

\\

oH F

F CT A

T 9

W rM 2

e(

w 1

L o

2 E

P V

E 3

cL 1

i N

N.

mR h

i 5 E oE J

J T

W t

T A

A O

A 8 0 P

2 eY eL kI

~

0 nA 2

aD 2

Y E 1

G C

0 nR D

E.

eA E

4 C.

iE T

A.

aV 6

A M

2 1

8 1

0 1

V V

O O..

N.

2 N

v A.

. 5

. 2 7

1 T.

9 T

0 0.

0 0

t A. 1 0

0 0

0 0

0 0

0 0

0 g

0 0

0 0

0 0

0 0

0 0

0 0

0 0

g 0

0 0

8 6

4 2

0 8

6 4

2 0

g 6

4 2

0' 2

2 z

ne.

1 1

1 1

1 AyERAuE MWTH l

PERFORMANCE PROGRAM WUNKuHeti ehmeria ' a na i

g76 "

AEPORY PERIOO Maine Yankee March 1987, Actual PERFORMANCE DATA Nc"(*[o",8 "

855 MWe Net Period Hours PH 744

,n i)

'C'*

d'"*'*"*

una outana. ""^*9 6. 5 0

0 0

0 Hours Partial iniua, aa.4 ici s..

.i in e aco et.aa.o cui.e. st.<i o.i.

Reduct'oa 0

0 156,682 March 28,1987 MW brs.

(H) o#ges o4aed ab0a (WWin)

(6),6et o.ne#eion (WWe) f uel Cost 1,313,599 396,930

$ 1,998,893.0 i

b CALCULATED DATA 647.5 96.5 Service Hours

  • SH = PH - (a + b + c + d + e) =

744

=

647.5 Available Hours = AH = SH + e =

647.5 s

0

=

183.3 156.682

+

855

=

r$

o

= EUNDH = (f + k) + rating l

Equivalent Seasonal 0

+

855 0

Oerated Hours = ESOH = g + rating.

I 3

4483050.7 x 10 Therrnal MBTU's a h a 3.4128 =

1,313,599 x

3.4128

=

% CALCULATED PERFORMANCE FACTORS AVAILABILITY FACTOR = AF = (Available Hours + Period Hours) x 100 =

AF * ( AH + PH) = 1M "'

647.5

+

744 x 100 =

87 Equivalent Equivalent i

Available Hours - ( Oersted Hours Seasonal Hours J x 100 =

+

EQUIVALENT AVAILABILITY FACTOR = EAF =

Period Hours 647.5 183.3+

0 AH -(EUNDH + ESOH)

EAF5

100

x 100 =

62.4 %

744

100

CAPACITY FACTOR = CF = pg 396,930 i

CF*

100

x 100 =

62.4 %

p 744 x

855 FORCED OUTAGE RATE = FOR =

Forced Outage Ho s + Service Hours 0

{

C 100 =

0 FOR'

= 100 c. SH 0

+

647.5 N88 G*n'r8ti n (MW8) 4483050.7x100 UNIT HE AT RATE

  • Hn 11,294.3 eTu Maius KW.HA 396,930 k APPROJAth o

l'Oi l'AHf () OY

/

OATE REVIEWEO DY OATE

,/

c# L/

4/3/87

l ll(l 0 47 86b997661 2632977/ 77 44 a1 7 37 0 4

D T

44 4433221 1 0987 6420 6641 852833333 H

02 4680 24 680 1 35791 3 4 6801356888 e6 P

00 00 O 1 1 11 1222222333334 4 4

4. 4 4 4 4 s4 F

68 88b6886868688888b e88U6886b es8 E

E886E66686 88E8E886t666E 6888b ee8 E

R C

C 91 220 6038491 20461 37204788577777 E

C P

8630 / 30 529b284 949372692581 1 1 1 1 1 T

l N

A N

03691 47 9247 02b7 02570247 91 4 66666 E

D R

7 777 e68e999000 01 1 1 1 222223333333 S

U 33333333333444444 4 4 4 4 4 4 4444 4 4 4 4 E

0 B

1 1 1 1 1 11 1 1 11 1 11 1 1 1 1 1 1 1 1 1 1 1 1 11 1 1 1 R

1 F

S R

R 00 000 0 0 0000 000000 0 00000 0 0 000 00 0 O

U F

O C

64 0 9332991335754605406593077777 EH P

4 60 366 38691 247 51 9667260 61044 4 4 4 SR H

1 71 1 82301 67 47673645889959988888 ROK I

4 691 24 b6789000 98529627 27 1 b44 4 4 4 SUCE W

7 2738383836 49483637271 605933333 NO W

M 4556677889900 1 1 2 2 3 3' 445566677777 OHT O 66666666666777777777 77777777777 G

I NP 2222222222222222222222222222222 O

T LE L

CASL R

LMEL L

00000000000000000 00000000000000 S

JRRU F

R EEPF E

RH B

T Rl M

S D

Oh U

U N

AT FL H

000 00 00 00000000 00000000000 00000 N

WSOI L

OPLAPA Y

DU WUV L

LTLAN1 I

OALGRU D

A OtUEUG C

00 0 000 0000 0000000 000 00 0 000 0 0 1 00 D

ChF MLL 7

: : = = :

8 R

9 CCD E

1 PPT S

00 00 0 000000000000000000000000 00 U

HNH O

RTRP P

R DULWUF A

CHF MBL C

M U

I S

000 0 00000000000 00000 00000 000 00 0 M

O

)

T A

SLS D

E RMR S

00 000 00000000 0000 0000000001000 0 E

UI U P

OT O N

H H

A E

J LLN AOI 00000 0000000000000 000000 0004000 E

MA C

N RLL T

44 4 4 4 4 44444 444 44 4 4 44 4 44 444 40 0 00

^

I EI A 222222222222222222222222222 A

HAC TI M

I VI AT S l

I NS RR WP 00 0 00 0 0000 0000 000 000 0 00 0 0 0 0 60 0 0 l

AOCObS A

WT CiM H

4 4 4 4 4 4 4 44 44 4 4 4 4 44 4 44 4 44 44 441 0 0 0 ACL1 k A 22222 2222222222222222222222 GAM 0AR m

LLI hI C i

FHT SSS u

m h

: = : : :

0 0 00 0 0 000 0 0 000 0 0 0000 000 C 0 000 0 00 b

H 0 6694 0 970 220 22 6 924 59669' 47 7 0 0 0 0 01 3320 656221 23/5660 0 4 4 364b 4 I

I k A CLL W

5 6 3 t 7 4 070 t0 7 d5 0 03 1 1 391 5 6 35 5 MRT SSS M

22221 1 1 01 1 1 00 95 67 6/7 554 4 4 68 b5555555555 554 4 4 4 4 4 4 4 4 4 4 4 43 A

// 7 / 7 /1 7 7 //7 / 7 /7 7 / /7 7/7 //77 / 7/7 t 6 8E 6 6 6e6 F 6 6 LE 66866668 66 66886 88 5 9 9999 999999S 59599999999999 9 9 92 E

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 T

/ / / / / / / / / / / / // // / / / / / / //// / / ///

A 1 2 ahtt7 e5 0 1 2d 4 56/8 50 1 22 4 5 t/6 30 1 05 D

1 1 1 1 1 1 1 1 1 1 2222 22222 y/ / -

/. / / / / / / /. /. / / / / / / / / / / / / / /

/ / / / /

e

,l ll(

'l l i 111111.2111111111.1111111111111111111111111111111111111111111 A 1 A 11111111111111111 M

". - 1 1

e 1

MAINL YANKtt AIOMIC FGktR COMPANY LIECASSEI, FAINE MONIHLY Rt POR T FOR FAR. 1987 LLLC1RIC LO G *

$231H li AR TD_MATL GRobb LLECiklC GENLMA110N (MWH) 414490 0 1577890.0- 74278900 0 blA110N SLRVICL ( A UX. TRANS.) ( M W H')

636 00

'636.00 33.4599.00 STAl10N SLRVICE (S T A. TRANS.) (MWh) 17560 00 55909 00 3328851 00 NL1 LLLCIRIC GLNLRATION (MWH) 396930.00 1521981.00 -70950052.00--

ON L.NL TIML ( H OUR S) 647.45 2063.45 99403 12 SHUI DOWN llME ( FO UR S ).

96.55 96 55 26744.20 PLANI C AP ACI T Y F AC TO R - (DLSI GN NET) 64.67

'85 41-69.30--

  • PLANT PERFO RM ANCE LOG
  • MgNIH 1[AE S.C.0.

NLT PLANT HLAT H AI E (Blu/KWH) 11292 20-

-10833 51-10870.21--

(PER'ENT).

67.133 85 063 70 775 PLANT lHERMAL C APA C11 Y C

RLACl0K PLANT AV AI LA BILITY ( P E R C E r, T )

87.339 95.639 85 476 PLANT AVAILABILITY (PLHCtNI) 87.023 95 530 78 858

  • NUCLLAR LCG
  • UgNJh 1[f3 JO_ pal {

GROSS THERMAL bEf.EHATION (MWH).

13135.99.0 4832241.0 226089553.0 SIAhlVPb 0

0 166 HLATUPS 0

0 32 SCRAMS 0

0 104 000LCOLAS 1

1 32 bHUlDCLNb 1

1 163 FULL LOAD R L J L C I 10 NS 0

0 29 AVLHAGL COHL BUR AU P (MWu/ TON) 6b0.210 2502.239 14361.707*

S.C.O.

VALUt P RO M 1hL START OF COMMLbLIAL CPtkATION, 12/28/1972 A1 0000
  • ; VALUL FOR lH L PklSLNI C0kt 1111111111111111111111111111111111111111111111111111111111111111111111111111111111'

A3 t

MAIRE HARHEE 'ATOMICPOWERCOMPARUe

,uaugr,Tl,,?n"g%,

(207) 623 352:

.we April 7, 1987 HN-87-45 G0H-87-91 Office of Resource Management United States Nuclear Regulatory Commission Washington, D. C.

20555 Attention:

Mr. Richard A. Hartfield, Chief Management Information Branch

References:

(a)

License No. OPR-36 (Docket No. 50-309)

(b)

NUREG-0020, Licensed Operating Reactors Status Summary l

Report

Subject:

Maine Yankee Monthly Statistical Report Gentlemen:

Enclosed you will find the Monthly Statistical Report for the Maine Yankee Atomic Power Station for April, 1987.

3 Very truly yours, MAINE YANKEE ATOMIC POWER COMPANY

-4Bw)W G. D. Whittier, Manager Nuclear Engineering and Licensing GDH/bjp Enclosure cc: Mr. Asbok C.'Thadani Dr. Thomas E. Murley Mr. Pat Sears Mr. Cornelius F. Holden L

gi 8619L-LM0 I