Monthly Operating Rept for May 1987
ML20237K676
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 05/31/1987
From: Mcdonald R, Woodard J
ALABAMA POWER CO.
To:
NRC
References
NUDOCS 8708190364
Download: ML20237K676 (9)


Text

-

OPERATI!G DATA REPmT DOCKET NO.

50-364 DA'IE 6/1/87 CM PLETED BY J. D. Woodard TELEPHCNE M)899-5156 OPERATING STPdUS Notes

1. Unit Name:

Joseph M. Farley - Unit 2

2. Reporting Period:

May, 1987

1) Cumulative data since
3. Licensed Thermal Power (mt):

2,652 7-30-81, date of

4. Nameplate Rating (Gross m e):

860 commercial operation

5. Design Electrical Rating (Net me): 829
6. Maximum Dependable Capacity (Gross N e):

864.9

)

7. Maximum Dependable Capacity (Net We):

824.1 i

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A

9. Power Level To Which Restricted, If Any (Net MWe):

N/A

10. Reasons For Restrictions, If Any:

N/A

'Ihis Month Yr-to-Date Cumm11ative

11. Hours In Reporting Period 744 3,623 51,168
12. Number Of Hours Reactor Was Critical 744.0 3,265.6 49,621.8
13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0 i
14. Hours Generator On-Line 744.0 3,248.7 44,099.5
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 1
16. Gross Thermal Energy Generated (NH) 1,972,677 8,230,611 111,548,601
17. Gross Electrical Energy Generated (MWH) 640,656 2,695,964 36,705,234
18. Net Electrical Energy Generated (NH) 610,058 2,557,806 34,806,918
19. Unit Service Factor 100.0 89.7 86.2
20. Unit Availability Factor 100.0 89.7 86.2
21. Unit Capacity Factor (Using MDC Net) 99.5 85.7 83.5
22. Unit Capacity Factor (Using DER Net) 98.9 85.2 82.1
23. Unit Forced Outage Rate 0.0 10.3 4.8
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling / Maintenance outage, 10/2/87, approximately eight weeks

25. If Shut Down At End Of Report Period, Estimated Date of Startup:

N/A

26. Units In Test Status (Frior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 05/06/81 05/08/81 INITIAL ELECTRICITY 05/24/81 05/25/81 COMMERCIAL OPERATION 08/01/81 07/30/81 l

Form 2/30 k

8708190364 870531 h

h({

PDR ADOCK 05000364 R

PDR a

<s,

,P DOCKET NO.,. 50--364

' UNIT 2

DATE June 1, 1987 COMPLETED BY J. D. Woodard I

TELEPHONE (205)899-5156 i

Morml May 1

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (PWe-Net)

(MWe-Net) i 1

825 17 820 2

824 18 820 3

825 19 818 4

822 20 816 5

824 21 815 6

827 22 815 7

823 23 817 8

823 24 816 9

822 25 817 10 822 26 820 l

11 820 27 819 i

12 823 28 815 13 822 29 817 14 820 30 818 15 822 31 817 16 820 i

l INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in

)

the reporting month. Compute to the nearest whole megawatt.

i

)

Form 13/21 1

L 9 D 5 R 1 O -

A O 9 F

, W 9 4

1 S

5

)

3 M E D 5 N. 2 0

U 0

+

5 J J J

(

E

, E G

V C

E I

N R

T E

U oE E Y E C

R e N N M T B N E O R e

(

A A O

R T U a s T N D D H R

C s t n e E

E P O N E n a e l R T T 2 C O R o D ci C I E

1 I

i i F t f L O N L E

& T E D U P T C

I u

r

)

c o M

E A E R

O S

V r n o E C

U E

t o f L A

R s i

(

C P

n t s t I

a t r

- r o o G a o p

'R e p h e S R r

MP yt

)

r n 1 Y

r t e 6 A

o n v 1 M

ll l I IlII III11i I1IIII!III1I E f E E 0 4

F O

T S

N H

N E

T O

N N

I O

O T

P E M

C M D U

O O E

D C C H

E T

E lll II lI III Ii l II1I II IIII Ill R

M E

Y E

G W

A T E N

O M

S D I

m

)

P Y O R

a n D

H D

m.

r i S C U

c a A

N lll I Il II III IIi I iI I IIIIIIIi a S l N

T r

p O

S c c x S

M E

S N

S i E N

E O

t

(

W T

S T

I l l a

O R

N T R T

a a m r D

O E N O C

d u u o e T

P C E P U

o n n t h U

E I V E D

h a a u t H

R L E R E

t M M A O S

R e - - - -

T lll IIlIIIIIIIlII IIIIIIIIIi M 1 2 3 4 I

N U

R O

T R

F C

E O G A W

n N E O

o D I R P

i O T t

H T N T

a T U W N

n E H O A

i M S D C

m I

ax lll Iil IIII IIIiIIIIIIIIIIIl E

F I

N N

)

e O

G n

s I

i n

M S

a e

E l

c R

R p

ni O

x o L l

ll Ill I IIIIIIII I I IIIIIII Ii E

i

(

t t E s

c O

)

S e e i g N

N r T r n I S W

u t i R

O l

r s n T '

D i o e i v A

t T

a R a i R o U H U

F e r

D

(

H c

yT a a S

t n g r lll Iil III IIIII I IIIII IIII1I n a n o r t o E e ni t o

m e l a t i

pt e l a n a r E

ni n u u r i r P

T o uif g e m eh Y

I s q a e e p d p t

.T N

a E M R R O A U

e - - - - -

lll IilII IIIIIII III I II IIIiI R A 8 C D E F G ON ET E

d A

R e

D E

l W

d u lll IIlIIIIII IIIII!IlIIII iI e d c e r h E

o c E

F S O

H F

N T

F S lll IIlIII11I1I1IIIIlI1IIiI I

=

JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE SUlHAIn" OF OPERATIONS May, 1987 There were no unit shutdowns or significant power reductions during the month of May.

The following major safety-related maintenance was perfornwxi in the month of May:

1.

The turbine driven auxiliary feedwater pump thrust bearing was replaced.

2.

Miscellaneous corrective and preventive maintenance was perfomed on the diesel generators.

t t

i I

1

f OPERATING DATA REPORT DOCKET NO.

50-364 DA'IE 6/1/87 C m PLETED BY J. D. Woodard TELEPHONE (205)899-5156 OPERATING STPGUS Notes

1. Unit Name:

Joseph M. Farley - Unit 2

2. Reporting Period:

May, 1987

1) Cumulative data since
3. Licensed Thermal Power (NWt):

2,652 7-30-81, date of

4. Nameplate Rating (Gross MWe):

860 comercial operation

5. Design Electrical Rating (Net MWe): 829
6. Maxim'un Dependable Capacity (Gror,s MWe):

864.9

'a

7. Maximum Dependable Capacity (Net MWe):

824.1

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A

9. Power Level To Which Restricted, If Any (Net MWe):

N/A

10. Reasons for Restrictions, If Any:

N/A

'Ihis Month Yr-to-Date Cumulative

11. Hours In Reporting Period 744 3,623 51,168
12. Number Of Hours Reactor Was Critical 744.0 3,265.6 49,621.8
13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
14. Hours Generator On-Line 744.0 3,248.7 44,099.5
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MNH) 1,972,677 8,230,611 111,548,601 l
17. Gross Electrical Energy Generated (MWH) 640,656 2,695,964 36,705,234 l
18. Net Electrical Energy Generated (MWH) 610,058 2,557,806 34,806,918 l

l

19. Unit Service Factor 100.0 89.7 86.2
20. Unit Availability Factor 100.0 89.7 86.2 l
21. Unit Capacity Factor (Using MDC Net) 99.5 85.7 83.5 j
22. Unit Capacity Factor (Using DER Net) 98.9 85.2 82.1
23. Unit Forced Outage Rate 0.0 10.3 4.8 i
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling / Maintenance outage, 10/2/87, approximately eight weeks

25. If Shut Down At End Of Report Period, Estimated Date of Startup:

N/A

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 05/06/81 05/08/81 INITIAL ELECTRICITY 05/24/81 115/25/81 COMMERCIAL OPERATION 08/01/81 07/30/81 Form 2/30

,s DOCKET No.

50-364 UNIT 2

DATE June 1, 1987-CCEPLETED BY J. D. Woodard f

TELEPHONE (205)899-5156 i

Motml May DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL I

(MWe-Net)

(MWe-Net) 1 825 17 820 I

2 824 18 820 3

825 19 818 4

822 20 816 5

824 21 815 6

827 22 815 7

823 23 817 8

823 24 816 9

822 25 817 10 822 26 820 11 820 27 819 12 823 28 815 l

13 822 29 817 14 820 30 818 15 822 31 817 l

16 820 1

INSTRUCTIONS on this format, list the average daily unit power level in MNe-Net for each day in l

the reporting month. Compute to the nearest whole megawatt.

Form 13/21

-i

lil a.-

lll IilIIIIIIlII IiiIIIIIlII

=

?

T I

NU T

7 E

8 L

9 R

1 AF 4

1 8

6 3

M E

N O

U 0

5 J

J E

E G

V C

E I

N R

T L

U UE E E

C R

e N E M T E O R e

(

A A O

R T U a s T M D R

C s t n e e

E O N E n a e l c

I T C O R o D ci r

C I I

i i F u

O N

& T T t f L

)

s o

D U C N c o E A E u

r R S

V r n o E e

U E

t of L v

A R

s i

(

a C

P n t s t S

I a t r

- r e o G a e p I

ph e t e S R t.

i r i

b P yt b

)

Y i

r n1 i

A h r t e6 h

M x o n v 1 x

l ll IIliIIIIIIIIIIlIIIIIiII E f E E 0 E

F O

. T S

.N H

N E

T O

N N

I O

O T

P E M

C M D U

O O E

D C C H

E T

R l ll IIllI!IIII1IIIiIIIIIiII R

M E

Y E

G W

A T E N

O M

S D I

m)

P Y O R

a n S C U

. r i D

H D

m c a N

T a S l A

N lll IIli IIIIII 1IIIiI IIIIiII r

p O

S c c x S

M E

5 N

S iE N

E O

t

(

W T

T I

l l a ET R

T

a a m r O

R D

O E N O C

d u u o e T

P C E P U

o n nt h U

E I V E D

h a a u t H

R L E R E

t M M A O R

e - - - -

S hll IIllII 1IIIiIiIiIII1IIiI M 1 2 3 4 T

I N

U R

O T

R F

C E

O G A W

n N E O

o D I R P

i T

t wT N T

a s

a, U W N

n

H O A

i ur S D C

m I

ax lll IIliII1IIII IiIIIIIilIlI E

F I

N N

)

e

)

O G

n s

n S

I i

n i

A S

a e

a E

l c

l R

R p

ni p

O x

o L x

lll IIlIIIiIII IIiIi IIIIiIiI E

i E

(

t t &

(

s c

N S

e e i g r

O M

r T r n o

)

I S W

u t i r

)

T R O

l r

s n e r n A U D

i o e i v E i R O T

a R a i a

U H U

F e r t l l D

(

H c

yT a a p S

t n g r r n x lll IIl1IIIIIII IIIiII!I iI1I n a n o r t o E e nit o s i

(

m e l a t it pt el a n a r E

nin u a r i r e P

T o uif g e m eh Y

I s q a e e pd p t T

N a E M R R oA O O U

e - - - - - - - -

lll IIl1IIIIIIIIIIIIIIIiIII R A B C D E F G H O

N ET E

d 2

A R

e

/

D E

l 1

lll 1IllIIIIIIIII1IIIIIIIlI d u W

t e d n

c e x

r h R

F S

7) R E

o c

/M 7

E O

H N

T F S 9

(

lll 1IllIIIIII!IIIiIIIIIIiI

Des Alabama Power Company d-600 Nor% 18th Street Post Office Box 2641 Birmingham. Alabama 35291-0400 Telephone 205 250-1835 l

R. P. Mc Donald Senior Vice President Alabama Power l

the southern electic S6 tem l

June 9, 1987 Docket No. 50-364 Director, Office of Resource Management i

U. S. Nuclear Regulatory Commission l

Washington, D.C.

20555

Dear Sir:

1 RE: Joseph M. Farley Nuclear Plant j

Unit 2 l

Monthly Operating Data Report j

i Attached are two (2) copies of the May 1987 Monthly Operating Report l

for Joseph M. Farley Nuclear Plant Unit 2, required by Section 6.9.1.10 of j

the Technical Specifications.

j 1

If you have any questions, please advise.

l d 6 g[u i

Yours very 7

R. P. Mcdonald i

RPM /BCE:mab/F-2 Enclosures xc: Director, IE (10 copies)

Director, RII (1 copy)

+

s N

's t

1 I

JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE SUltARY OF OPERATIONS May, 1987 There were no unit shutdowns or significant pouer reductions during the month of May.

The following major safety-related maintenance was perfonned in the month of May:

1.

The turbine driven auxiliary feedwater pump thrust bearing was replaced.

i 2.

Miscellaneous corrective and preventive maintenance was perfonned on the diesel generators.