JOSEPII M. FARLEY NUCIEAR PIANT UNIT 1 1

NARRATIVE

SUMMARY

OF OPERATIONS April, 1987 i

k There was one unit shutdown during the month of April. On 4-5-87, the unit was shut down to repair various leaking components. During this shutdown, at 2338 on 4-5-87, with the unit in Mode 3 (flot Standby) and the control Innks inserted, a reactor trip signal was generated when source range nuclear instrument N-31 failed high. The shutdown banks, which had i

remained fully withdrawn, inserted on the reactor trip signal. The detector for N-31 was replaced and, following testing, N-31 was returned to service. The unit returned to power operation on 4-15-87 following completion of the planned outage.

l The following nnjor safety-related maintenance was performed in the month of April:

1.

leaks were repaired on the C loop RTD bypass manifold, the A steam generator manway, and the A residual heat removal pump. Leaks were also repaired on both the normal and alternate charging isolation valves.

2.

The detector for source range nuclear instrument N-31 was replaced.

3.

Radiation mani tor R-20 was repaired.

j l

4.

Miscellaneous corrective and preventive maintenance was performed I

on the diesel generators.

)

)

B708190298 870430 PDR ADOCK 05000348

\\

PDR R

OPERATING DATA REPORT DOCKET NO.

50-348 DATE 5/4/87 l

COMPLETED BY J. D. Woodard TELEPHONE (205)899-5156 OPERATING STA'IUS Notes

1. Unit Name:

Joseph M. Farley - Unit 1

2. Reporting Period:

April, 1987

1) Cumulative data since
3. Licensed Thermal Power (m t):

2,652 12-1-77, date of

4. Nameplate Rating (Gross We):

860 commercial operation

5. Design Electrical Rating (Net W e): 829
6. Maximum Dependable Capacity (Gross me):

856.0

7. Maximum Dependable Capacity (Net MWe):

825.1

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A

9. Power Level To which Restricted, If Any (Net We):

N/A

10. Reasons For Restrictions, If Any:

N/A

'Ihis Month Yr-to-Date Cumulative l

l

11. Hours In Reporting Period 719 2,879 82,511 j
12. Number Of Hours Reactor Was Critical 505.1 2,640.6 59,550.1 1
13. Reactor Reserve Shutdown Hours 0.0 0.0 3,650.0 l
14. Hours Generator On-Line 484.7 2,586.2 58,108.6
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated '(MWH) 1,216,358 T691,324 T48,018.992
17. Gross Electrical Energy Generated (WH) 7 3,874 TI86,152 47,549,196
18. Net Electrical Energy Generated (WH) 370,148 2,070,514 44,794,848
19. Unit Service Factor 67.4 89.8 70.5"
20. Unit Availability Factor 67.4 89.8 70.5
21. Unit Capacity Factor (Using MDC Net) 62.4 87.2 67.5
22. Unit Capacity Factor (Using DER Net) 62~ 1 86.8 65.5
23. Unit Forced Outage Rate 0.0 2.2 10.2 24.. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A

25. If Shut Down At End Of Report Period, Estimated Date of Startup:

N/A

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 08/06M 7 08/09M 7 INITIAL ELECTRICITY 08/20M 7 08/18/77 COMMERCIAL OPERATION 12/0147 12/01/77 Form 2/34

DOCKET NO.

50-348 UNIT 1

DATE May 4, 1987 COMPLETED BY J. D. Woodard TELEPHONE (205)899-5156 MONTH April DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MNe-Net)

(MWe-Net) 1 828 17 689 2

825 18 826 3

823 19 830 4

826 20 830 5

688 21 826 6

0 22 828 7

0 23 821 8

0 24 825 9

0 25 827 10 0

26 827 11 0

27 826 12 0

28 821 13 0

29 830 14 0

30 823 15 17 31 16 189 INSTRUCTIONS On this format, list the average daily unit power level in MNe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

Form 13/21

R 9 O -

t M g

c e u h

A 1 O 9 o

l t d a r t r t 8

, W 9 t g n o s n a e e e F

S n i r a e h r s r w f 4

. 4

)

ni t w m a

o o 3 M D 5 w r t n

uh e w s p Y

0 o u i o l r c h a

n 0

A. 2 5

J.

M J

(

d D n c a t i t 1 w o o u

n s h 3

t i E

E t

h g n w n - 1 t

G V

C u. e t i i I

N h s h g s

, o N 3 d e E

- e l R

T E

s t t n r s d r N n p U

O. E E Y E C

R n

e p a k e o r m e

(

N N M T B N E O R s e h l i e n t f

, u o e

A A O

R T U a n t r l a r g t c

a s T N D D H R

C w o i l t cb e r n e s t n e E

E P O N E p w l u

s o i r g n a e l K T T E C O R t m, f o wi c s t i i

i F u r n n n t t n

o D c i C I E L I

i o O N L E

& T T n c7 t e o e e i w t f L D U P T C N u

8 e c g d c o

)

M E A E g - h a n t n, t t n o.

u r R e

u l O

S V

e n 5 t e a u wd g l

e r n o E C

U E

h i -

r r h a n e o g t o f L A

R t k 4 d s r e i h f a s i

(

C P

a n a e d h w T t

n t s t 7, e n a, r h t l

8 o

r e o c e h T o 7 u I a t r l

o d u T i l

G a e p 8

)y e o w. o e5 d p h e

- s 8 5 u 3 b t s l f c 1 e

t e S R

- o 3 d r

. y a

- n i r

,i 4 i 2 n e n h l n

v 4 n

b P yt

)

r a s e g l g d r a

i r n 1 n a t t n h i ui n e n l h r t e 6 O v s S i w h f s a s o p x o n v 1 lll llll l l

l ll llll l I l II I II I I E f E E 0 T

S N

N E

O N

X I

O X

T P E X

C M D I

U O O I

D C C I

ER l ll

]

llll l

llll l

l l

i I iI II I Il I L

R I

M E

R E

W P

T E B

O A

S D A

m

)

P Y O S C a n N

T m.

r i D

H c a A

N lll ll l l

lll l

l l

l l

l i

I iII 1 II i l a S l O

r p

c c x S

M E

t 0

N E

0 S i E W

T S

T t

(

l l a O

R N T R 7

D O

E N O 0

a a m r d u u o e T

P C E P 0

U E

I V E o n n t h H

R L E R 7

h a a u t S

8 t M M A O e - - - -

T l] l l

l ll l ll l l

ll l l

i I

iI ! 1 I I i i M 1 2 3 4 I

NU P.

OT F

C C.

A N E D I P-O T E T N T U W 1

E H O M S D lll l}l l

l l

l l

l l

l l

ll I III ll I 1 i NO

)

S n

A B

i E

a R

lp ni x

o L l

l l l

l l

l l

l l

l l

l l

l l

i i 1 Iil l I li E

i N

(

t t &

s c

O

)

e e i g r T r n I S 3

T R u

t i A U 4

l r s

R O 3

i o e i U H 2

a R a D

(

F e c y T l l l l

ll l l l l l

ll l l l iI i I ll ii l i t n g r n a n o r e ni t o s m el a t E

p t e l P

ni n u u r i Y

S o uif g e m e T

s q a e e pd p a E M R R O e - - - -

lll l

l l l

l l

l lj l l

l l

i 1 I I i l

i l l

I R A B C D E 5

E 0

T 4

A 0

d D

7 e

8 l

ll l

l l

l l

l l

j l

j l

l l

l 1

l II il ii l

i d u e d c e r h o c O.

7 F S 0

N 0

lll l

ll l

ll l l l ll llll I I i li il i F S

,e as l

\\

4 I

I 9678970 1

11 4h

/n 14 4

/

5

$1 5 6..

m O

E'i C

RECE @

Nf' l

w pinunh ej/

MGR N C

s m

g#

%,yp% 'l f

l

.I I

l i

~

- Alabama Power Company I

o GOO North 18th Street Post Office Box 2641 Birmingham, Alabama 35291-0400 Telephone 205 250-1835 n

kn"O?te";s,oent Ahm he the Solflem eft?Clfic SySlem May 8, 1987 Docket No. 50-348 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C.

20555 j

Dear Sir:

RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report l

Attached are two (2) copies of the April 1987 Monthly Operating Report for Joseph M. Farley Nuclear Plant Unit 1, required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

Yours very t uly,

(

}')A 4/

R. P. Mcdonald RPM /BCE:mab/F-2 Enclosures xc: Director, IE (10 copies)

Director, RII (1 copy) h Ih i