ML20237K220
| ML20237K220 | |
| Person / Time | |
|---|---|
| Site: | Byron, Braidwood, 05000000 |
| Issue date: | 08/07/1987 |
| From: | Hunsader S COMMONWEALTH EDISON CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| Shared Package | |
| ML20237K223 | List: |
| References | |
| NUDOCS 8708190144 | |
| Download: ML20237K220 (2) | |
Text
,
/
- Comntnwrith Edison 3
[C ) One First National Plazu. Chicago, Illinois O
(
Address Reply tFPost Office 60x 767 Chicago, Illinois 60690 0767 l
August 7, 1987 l
Mr. Thomas E. Murley, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555
Subject:
Byron Station Unit 2 Braidwood Station Units 1 and 2 Application for Amendment to Facility Operating Licenses NPF-66 and NPF-72 Appendix A, Technical Specifications NRC Docket Nos. 50-455, 50-456 and SO-457-
Dear Mr. Murley:
Pursuant to 10CFR 50.90, Commonwealth Edison proposes to amend Appendix A, Technical Specifications, of Facility Operating Licenses NPF-66 i
and NPF-72.
The proposed amendraent requests a change to Technical 4
l Specification 4.8.1.1.2f to extend, on a one-time basis, the 18 month l
surveillance testing requirement for the diesel generator, for an additional 13 months, until the first refueling outages for Byron Station Unit 2 and Braidwood Station Unit 1.
The revised Technical Specification pages are l
contained in Attachment A.
A summary of the prcposed changes is included in l
Attachment B.
l The proposed changes have been reviewed and approved by both On-site and Off-site review in accordance with Commonwealth Edison Ccmpany procedures. Westinghouse and the diesel generator manufacturer (Cooper Industries - Energy Services Group) have also reviewed this change and found it to be acceptable. Commonwealth Edison has reviewed this proposed amendment in accordance with 10 CFR 50.92(c) and determined that no significant hazards considerations exist.
This evaluation is documented in Attachment C.
Commonwealth Edison is notifying the State of Illinois of our application for this amendment by transmitting a copy of this letter and its attachments to the designated State Official.
An expedited NRC review is requested so that the revised Technical Specification can be in place prior to the Braidwood Unit 1 surveillance outage, scheduled to start in early October, 1987. Acceptance of this amendment will allow the surveillance outage to be shortened from 6 weeks to 3 weeks and provide for an earlier cubsequent return to service of Braidwood Unit 1.
\\f 1
9708190144 R70807 PDR ADOCK 05000455 P
())lCSkLsl fD0 'O p
4 Mr. Thomas E. Hurley August 7, 1987 In accordance with 10 CFR 170, a fee remittance in the amount of
$150.00 is enclosed.
Please direct any questions you may have concerning this matter to this office.
very truly yours, S. C. Hunt.ader Nuclear Licensing Administrator crs
Enclosure:
Fee Remittance Attachments (A): Proposed Technical Specification Changes (B): Sutmary of Proposed Changes (C):
Evaluation of Significant Hazards Considerations l
cc: Reside..t Inspector - Byron l
Resident Inspector - Braidwood L. N. Olshan - NRR l
J. A. Stevens - NRR Regional Office RIII M. C. Parker - State of Ill.
SUBSC IBED and y' RN to me this'l g-day befora of llL Lc u m"$ T
, 1987 N
AWh l
t
' Notary Putilic j
3427K
_ _ _ _ _ _ _ _