Summary of 870811 Conference W/Ebasco in New York,Ny Re Conduit Support Design Review & Ebasco Audit.List of Participants Encl
ML20237K154
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 08/11/1987
From: Williams N
CYGNA ENERGY SERVICES
To:
CYGNA ENERGY SERVICES
References
CON-84056 NUDOCS 8709040220
Download: ML20237K154 (2)


Text

pok t=rr E

Communications M L%' M Report 3

11111111111ll1111!!!I111111111 l

@ Conference Report Company:

CES Telecon Project.

TV Electric Job No.

84056 CPSES IAP Phase 4 cate-8/11/87 t

T ' "'*

Conduit Support Design Review 11:00 a.m.

4 P'8C':

Ebasco Audit New York, NY t

Participants:

of Ebasco B. Shakibnia Cygna Required item Comments Action By Load Factor Application In the conduit span verification calculation for configurations where dynamic analysis was done using CQC method, a new analysis using the 10% combination method is j

used. For cases where computed "g" values are greater than design "g" values, 2 correction methods are used:

span reduction method and tributary load factor method.

Cygna asked how these two methods are implemented.

Ebasce stated that the SAG-CP-25 will be revised to reflect load factor application. During ISO verification, the new support loads will be calculated using L' = (L + Ws)L.F. - Ws L = old trib. wt.

L' = new trib. wt..

Ws = support wt.

If the original S.0910 spans were found to,be overstressed, their lengths would be reduced using the span reduction method, and the revised lengths would be incorporated in the new S.0910.

8709040220 870811 PDR ADOCK 0500 S

A lj jf (V 3

Distribution ' ' ' " " ~ ~

V See Attached Distribution Sheet.

1020 0t a

DISTRIBUTION LIST Mr.

J. Redding Mr.

L.

Nace Mr.

W.

Counsil Mr.

D, Pigott Ms. A.

Vietti-Cook Mr.'C.1 Grimes Mr.

E.

Siskin Ms. N. Williams Mr. J.

Russ Mr.

W.

Horstman Mr.

K.

Parikh Mr.

B. Atalay Ms.

D.

Leong Mr. B.

Shakibinia Project File

-_-_______