MONTHYEARML20206C8331999-04-26026 April 1999 Summary of 980929 Meeting with Texas Utilities Electric Co Re Licensing Submittals Requesting Exemption to App K & Topical Rept Submitted in Support of Exemption Request .List of Attendees Encl ML20236X4431998-08-0505 August 1998 Summary of 980814 Meeting W/Util Re Use of Caldon Leading Edge Flow Meter for App K Exemption & Power Uprate License Amend on 980714.List of Meeting Attendees Encl ML20198H4361997-12-24024 December 1997 Summary of 971112 Meeting W/Util at NRC Ofcs to Discuss 970228 Responses to 960522 Cable Functionality Safety Evaluation.Licensee Briefly Described Revised Response to Open Item Re Fire Stops.List of Attendees Encl ML20141H9291997-07-30030 July 1997 Summary of 970717-18 Meeting W/Tue Representatives in Glen Rose,Texas Re Licensee Proposed risk-informed Inservice Testing Program.List of Attendees Encl ML20129B5921996-10-16016 October 1996 Summary of 961016 Meeting W/Util in Rockville,Md Re License Amend Request 96-005,inverters & Battery Chargers Mod ML20058J0961993-11-29029 November 1993 Summary of 930920 Meeting W/Util Re Results of Thermo-Lag Tests for Facility Fire Barrier Configurations ML20058F4501993-11-26026 November 1993 Summary of 931006 Meeting Re Possible Implementation of Improved Standard Ts.List of Attendees Encl ML20059K3131993-11-0505 November 1993 Summary of Operating Reactors Events Meeting 93-42 on 931103 ML20057E4861993-08-0606 August 1993 Trip Repts of NRC Observation of Thermo-Lag Fire Barrier Test Specimen Const by Util for Qualification of Thermo-Lag Fire Barriers Installed in Facility & NUMARC for Generic Qualification of Thermo-Lag Fire Barriers in Industry ML20056D9841993-05-18018 May 1993 Summary of Operating Reactors Events Meeting 93-17 on 930512 ML20128K0041993-02-11011 February 1993 Summary of 930107 Meeting W/Utils in Rockville,Md to Provide Forum for Licensees to Present Staff W/Info Re Design, Operational & Testing Experience & Justification for long- Term Operability of Alternate Min Flow Path ML20126M2191993-01-0606 January 1993 Summary of 921217 Meeting W/Util Re Findings from Fire Protection Insp on 921116 & Related Fire Protection Issues. List of Attendees & Handouts Encl ML20128D1731992-12-0202 December 1992 Summary of 921027 Meeting W/Util in Rockville,Md to Discuss Fire Barrier Acceptance Criteria ML20126J7941992-01-0404 January 1992 Summary of Meeting W/Util Re Pressurizer Surge Line leak- before-break Analysis ML20058N9711990-08-0909 August 1990 Summary of Operating Reactors Events Meeting 90-20 on 900808 NUREG-0797, Summary of Meeting on 890905 in Rockville,Md to Discuss Ground Motion Estimates for Criner Tectonic Structure of Southern Oklahoma Aulacongen in Wichita Tectonic Province, Per Section 2.5.2 of Fsar.Viewgraphs Encl1989-09-11011 September 1989 Summary of Meeting on 890905 in Rockville,Md to Discuss Ground Motion Estimates for Criner Tectonic Structure of Southern Oklahoma Aulacongen in Wichita Tectonic Province, Per Section 2.5.2 of Fsar.Viewgraphs Encl ML20245L2621989-08-0909 August 1989 Summary of 890801 Meeting W/Util in Rockville,Md Re Util Proposed Responses to NRC 890711 Request for Addl Info on Plant Operations QA Program.W/Related Info,Including Request for Addl Info,Draft Responses to Questions & Attendee List ML20247K8451989-07-20020 July 1989 Summary of 890710 Meeting W/Licensee in Arlington,Tx to Discuss Options Re Evacuation of Site Personnel During Upcoming Emergency Preparedness Exercise ML20247D3441989-05-16016 May 1989 Summary of Operating Reactors Events Meeting 89-19 on 890510.List of Attendees,Events Discussed & Significant Elements of Events & Rept of long-term Followup Assignments & Summary of Scrams for Wk Ending 890507 Encl ML20246C3261989-05-0404 May 1989 Summary of Operating Reactors Events Meeting 89-18 on 890503 ML20248K5931989-04-11011 April 1989 Summary of 890406 Meeting W/Util Re Proposed Changes to Unit 1 Initial Startup Testing Program.List of Attendees & Slides Used in Util Presentation Encl ML20235G0491989-02-10010 February 1989 Summary of 890123 Meeting W/Util in Rockville,Md Re Revs 9 & 10 to Emergency Plan.Resolutions Proposed for 13 Planning Items ML20205T6041988-11-0707 November 1988 Summary of 880929 Meeting W/Util in Rockville,Md Re Plant Sys Branch FSAR Review.Problem Areas Include Reliability of Station Svc Water Sys & Util Relief Request from broad-scope Rule Amend GDC 4 Concerning Pressurizer Surge Line.W/Agenda ML20205N7911988-10-31031 October 1988 Summary of 881019 Meeting W/Util in Rockville,Md Re Unit 1 Tech Specs.Meeting Notice,Corrected Agenda & List of Attendees Encl ML20206E9051988-10-31031 October 1988 Summary of 881005-06 Meetings W/Util in Rockville,Md Re Proposed Changes to Tech Specs.Related Info,Including Meeting Notice W/Agenda,List of Attendees & Annotated Summary of All Unreviewed Generic Changes Encl ML20207P1081988-10-0404 October 1988 Summary of 880922 Meeting W/Util in Rockville,Md Re Tech Specs & Util Prioritization of 64 Unreviewed Generic Changes Proposed for Facility ML20155G3311988-10-0404 October 1988 Summary of 880111-15 Meeting in Glen Rose,Tx Re Proposed Changes to First Draft Tech Specs.List of Attendees & Viewgraphs Encl ML20207L5201988-10-0404 October 1988 Summary of 880412 Meeting W/Util in Rockville,Md Re Planned Changes to Tech Spec 6.0 Concerning Administrative Controls, Tech Spec Development & Review Schedule & NRC Review of Proposed Tech Spec Changes ML20155G2041988-09-30030 September 1988 Summary of 880317-18 Meeting W/Util in Rockville,Md Re Fire Protection Programon Program in Response to Open & Unresolved Items in Insp Rept 50-445/87-22.Util Attends to Submit Advanced Draft FSAR Changes by Early May 1988 ML20155C7271988-09-30030 September 1988 Summary of 880921 Meeting W/Util in Rockville,Md Re Chemical Engineering Branch Review of Fsar.List of Attendees,Meeting Notice & Agenda Encl ML20155C7241988-09-30030 September 1988 Summary of 880321 Meeting W/Util in Rockville,Md Re Attenuation of Jets from high-energy Line Breaks.Meeting Notice,List of Attendees & Handouts on Jet Impingement Loadings Encl ML20154L7101988-09-20020 September 1988 Summary of 880908 Meeting W/Util in Rockville,Md Re Changes to Emergency Plan Since Rev 8 Was Reviewed by Staff & Results of Review Documented in Safety Ser.Meeting Notice & List of Attendees Encl ML20154J8911988-09-19019 September 1988 Summary of 880907 Meeting W/Util in Rockville,Md Re Bounding Analysis for Stress Condition Pressurizer Surge. List of Attendees & Presentation Matl Encl.Proprietary Version of Presentation Slides Also Encl ML20154C1601988-09-0202 September 1988 Summary of 880830 Meeting W/Licensee Representatives at Util Site Re Operator Training Program & License Exam Results. W/List of Attendees,Agenda & Viewgraphs ML20153F0431988-08-31031 August 1988 Summary of 880818 Meeting W/Util & Westinghouse in Rockville,Md Re Application of leak-before-break Methodology to Pressurizer Surge Line.Meeting Notice,Agenda,List of Attendees & Slides Used in Presentation Encl ML20151P1841988-07-28028 July 1988 Summary of 880614 Meeting W/Util Re Radiation Protection Organization.Meeting Notice,Agenda,List of Attendees & Util Presentation Encl ML20206H5171988-07-26026 July 1988 Summary of Allegation Review Committee 880721 Meeting Held by Telephone Re Encl Listed Allegations ML20155F4811988-05-31031 May 1988 Summary of 880523-26 Audit of Util Corrective Action Program in Glen Rose,Tx.Audit Included Review of Util Reasons for Establishing HVAC Design Validation Effort & Review of Scope of QA Technical Audit Program ML20154G3471988-05-16016 May 1988 Summary of 880512 Meeting W/Util in Rockville,Md Re Design Change Involving Backup Meteorological Monitoring Tower at Plant.List of Attendees & Viewgraphs Encl ML20150D9191988-03-17017 March 1988 Summary of 880205 Meeting W/Util in Rockville,Md Re NRC Comments on Ebasco Svcs,Inc Jet Attenuation Calculation, CPE-SI-CA-0000-645 ML20149M0791988-02-18018 February 1988 Summary of 871112 Meeting W/Util in Bethesda,Md Re Jet Impingement Effects in Break Exclusion Region of Main Steam & Feedwater Piping at Plant.Meeting Notice & List of Attendees Encl ML20149H0141988-02-12012 February 1988 Summary of 871207-11 Audit Re Implementation of Procedures for Train C Conduit Supports Less than or Equal to 2 Inches. Lists of Persons Involved W/Audit & Documents Reviewed Encl ML20149D7401988-02-0101 February 1988 Summary of 871216 Meeting W/Util Re leak-before-break Piping Analysis & Amplified Response Spectra for Floors.List of Attendees & Presentation Slides on leak-before-break & Amplified Response Spectra Encl ML20236V9001987-11-25025 November 1987 Summary of 871028-30 Audit W/Util & S&W in Cherry Hill,Nj Re Implementation of Piping Design Criteria ML20236W2641987-11-25025 November 1987 Summary of 870908-10 Audit of as-built Field Verification Program for Conduit Support Trains a & B & Train C Greater than 2 Inches at Plant.List of Personnel Involved & Walkdown Packages Reviewed During Audit Encl ML20236Q4351987-11-0606 November 1987 Trip Rept of 871007 Visit to Corporate Consulting & Development Co,Ltd,In Raleigh,Nc Re Static Tests of HVAC Ductwork ML20236L6241987-11-0505 November 1987 Summary of 870928-1001 Audit of Comanche Peak Response Team third-party Review of Cable Tray/Supports at Ofcs of Tenera in Berkeley,Ca.List of Persons Involved in Audit & Attending Exit Meeting Encl ML20236F1201987-10-20020 October 1987 Summary of 870914 Meeting W/Util & Ebasco Svcs,Inc in New York,Ny Re Resolutions to Generic Technical Issues Re Design of Conduit Supports ML20236F7621987-10-19019 October 1987 Summary of 870915 Meeting W/Util & Util Design Contractors in New York,Ny Re Resolutions to Generic Technical Issues on Structural Integrity of HVAC Design ML20236C3851987-10-16016 October 1987 Summary of 870922-24 Audit at Ofcs of S&W in Cherry Hill,Nj Re Implementation of Pipe Design Criteria.Attendance List Encl 1999-04-26
[Table view] Category:MEETING MINUTES-INTERNAL (NON-TRANSCRIPT) MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20237K7581987-08-14014 August 1987 Summary of 870814 Meeting W/Ebasco in New York,Ny Re Conduit Support Design Review & Ebasco Audit ML20237K1591987-08-11011 August 1987 Summary of 870811 Conference W/Ebasco in New York,Ny Re Conduit Support Design Review & Ebasco Audit.List of Participants Encl ML20237K1541987-08-11011 August 1987 Summary of 870811 Conference W/Ebasco in New York,Ny Re Conduit Support Design Review & Ebasco Audit.List of Participants Encl ML20237K0781987-07-23023 July 1987 Summary of 870723 Conference W/Ebasco in New York,Ny Re Conduit Audits & Audit Summary.List of Participants Encl ML20237K7551987-06-25025 June 1987 Summary of 870625 Meeting W/Ebasco in State of Ny Re Conduit Support Design Review & Ebasco Audit - Program Review. General Flowchart & Related Diagrams Encl ML20237K7461987-06-24024 June 1987 Summary of 870624 Meeting W/Ebasco in State of Ny Re Conduit Support Design & Cable Tray Review & Ebasco Audit ML20237K0631987-04-10010 April 1987 Summary of 870410 Conference W/S&W in Boston,Ma Re Pipe Stress & Supports.Calculation Sheets Encl ML20237K7721987-03-0404 March 1987 Summary of 870304 Meeting W/Impell in Bannockburn,Il Re Cable Review & Impell Audit ML20237J8991987-02-12012 February 1987 Summary of 870212 Meeting W/Ebasco,Impell & Util at Site Re Cable Tray Support Design Review Audit 1987-08-14
[Table view] |
Text
pok t=rr E Communications 3 M L%' M Report 11111111111ll1111!!!I111111111 l Company:
CES Telecon @ Conference Report Project. Job No. 84056 TV Electric CPSES IAP Phase 4 cate- 8/11/87 l t
""*** T ' "'*
Conduit Support Design Review 11:00 a.m. 4 P'8C': New York, NY Ebasco Audit t
Participants:
of Ebasco B. Shakibnia Cygna Required item Comments Action By Load Factor Application In the conduit span verification calculation for configurations where dynamic analysis was done using CQC method, a new analysis using the 10% combination method is j used. For cases where computed "g" values are greater 1 than design "g" values, 2 correction methods are used:
span reduction method and tributary load factor method.
Cygna asked how these two methods are implemented.
Ebasce stated that the SAG-CP-25 will be revised to reflect load factor application. During ISO verification, the new support loads will be calculated using L' = (L + Ws)L.F. - Ws L = old trib. wt.
L' = new trib. wt..
Ws = support wt.
If the original S.0910 spans were found to ,be overstressed, their lengths would be reduced using the ,
, span reduction method, and the revised lengths would be incorporated in the new S.0910.
8709040220 870811 S PDR ADOCK 0500 A
lj jf (V . , 3 Distribution ' ' ' " " ~ ~ V See Attached Distribution Sheet.
1020 0t a
DISTRIBUTION LIST Mr. J. Redding Mr. L. Nace Mr. W. Counsil Mr. D, Pigott Ms. A. Vietti-Cook Mr.'C.1 Grimes Mr. E. Siskin Ms. N. Williams Mr. J. Russ Mr. W. Horstman Mr. K. Parikh Mr. B. Atalay Ms. D. Leong Mr. B. Shakibinia Project File
-_-_______