pok t=rr E Communications 3 M L%' M Report 11111111111ll1111!!!I111111111 l Company:

CES Telecon @ Conference Report Project. Job No. 84056 TV Electric CPSES IAP Phase 4 cate- 8/11/87 l t

""*** T ' "'*

Conduit Support Design Review 11:00 a.m. 4 P'8C': New York, NY Ebasco Audit t

Participants:

of Ebasco B. Shakibnia Cygna Required item Comments Action By Load Factor Application In the conduit span verification calculation for configurations where dynamic analysis was done using CQC method, a new analysis using the 10% combination method is j used. For cases where computed "g" values are greater 1 than design "g" values, 2 correction methods are used:

span reduction method and tributary load factor method.

Cygna asked how these two methods are implemented.

Ebasce stated that the SAG-CP-25 will be revised to reflect load factor application. During ISO verification, the new support loads will be calculated using L' = (L + Ws)L.F. - Ws L = old trib. wt.

L' = new trib. wt..

Ws = support wt.

If the original S.0910 spans were found to ,be overstressed, their lengths would be reduced using the ,

, span reduction method, and the revised lengths would be incorporated in the new S.0910.

8709040220 870811 S PDR ADOCK 0500 A

lj jf (V . , 3 Distribution ' ' ' " " ~ ~ V See Attached Distribution Sheet.

1020 0t a

DISTRIBUTION LIST Mr. J. Redding Mr. L. Nace Mr. W. Counsil Mr. D, Pigott Ms. A. Vietti-Cook Mr.'C.1 Grimes Mr. E. Siskin Ms. N. Williams Mr. J. Russ Mr. W. Horstman Mr. K. Parikh Mr. B. Atalay Ms. D. Leong Mr. B. Shakibinia Project File

-_-_______