Summary of 870723 Conference W/Ebasco in New York,Ny Re Conduit Audits & Audit Summary.List of Participants Encl
ML20237K078
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 07/23/1987
From: Williams N
CYGNA ENERGY SERVICES
To:
CYGNA ENERGY SERVICES
References
NUDOCS 8709040182
Download: ML20237K078 (4)


Text

_ _ - -

A

, , E552:3 Communications A D3'fd Report lillllllllllillllllillllllllli Company: CES o Teiecon g Conference Report Project Job No.

TV Electric 84056 CPSES IAP Phase 4 D8t':

_ 7/23/87 Subject Conduit Audits Time 5:00 p.m.

Audit Summary Place:

EbasCo (NY)

Participants:

l R. Alexandru. H. Gandhi . K. T. Wu, H. S. Yu ot Ebasco l B. Atalav. D_ t#nng. B Sha kibnia. J. Russ of Cyana of a

item Comments Reg'd Action By Cygna stated that, during the week, they had determined all calculations, pre:edures, etc. which needed to be audited to resolve RiL issues and also detcrmined the location and status of each of those items. Because of the activity still remaining on the cable tray MRM issue and the priority for the resolution of that issue, conduit review activities were limited.

Cygna reviewed procedures for consideration of systems with non-rigid CA-typa supports. Cygna understands that

. if a system contains a non-rigid CA-type support, it is considered a flexible system. All spans are considered to be LS-spans, and the supports are designed accordingly.

Cygna has begun the review of the thermal studies and understands that there are four studies: two junction box studies for accident and normal temperatures, and two conduit studies for accident and normal temperatures.

Some of the studies are still in progress. Cygna has esolved some questions during the week, but the review is still on-going, pending Ebasco's completion of work.

Cygna understands that grouted penetrations are not considered to be supports, which is conservative for both 8709040182 870723 PDR ADOCK 05000445

% PDR 1 3 See Attached Distribution Sheet.

signed

  • Page of Distnbution.

toro 00

L_

~

Communications l 64M'M Report J

111111111111111111111111111111 Reowed J Comments Action By ltem the conduit span and conduit support evaluations. Cygna reviewed calculations for embedded conduits, which are

- considered to be thre -way supports. As a result of this review, Cygna has two ruestions.

First, Cygna asked why the following equation was used to determine the concrete capacity:

9.5 f'c D

instead of the more conservative:

6.7 f'c D

Cygna stated that the latter equation was used for top bars in case of bubbles forming under the bars, which decreases the bonding. Ebasco explained that both equations were used; they used different allowables for  ;

conduits embedded in walls and floors. I Cygna's second concern was that Ebasco had not shown that l the ACI allowables were applicable for embedded conduits with larger diameters than #18 bars, since allowables decrease with size. Ebasco stated that the plot of .

allowables vs. bar size was more or less linear, and extrapolation of that plot was possible for larger embedments. Ebasco agreed to provide that documentation to Cygna for review.

Cygna also reviewed the systems concept and determined '

that internal Cygna discussions are required. Ebasco is also revising the calculation to demonstrate that the concept is acceptable for hinged boundary conditions, which forces more load into the supports. The revised calculation will be reviewed during the next audit.

Cygna is also in the process of reviewing Calculation Book 44, the procedure to develop the design "g" values, and the calculation which developed the load factors to

? ,

See Attached Distribution Sheet.

1C20 01D

hy5ebssg -

Communications

[416tfJ '

lll111!!Ill!l111111111111ll111 Report Required item Comments Action By correct between CQC results and Reg Guide 1.92 results.

t Page of See Attached Distribution Sheet.

1C20Cib

4 i

DISTRIBUTION LIST ]

Mr. J. Redding Mr. L. Nace l Mr. W. Counsil l Mr. D, Pigott  ;

Ms. A. Vietti-Cook l Mr L C5)Gkimesl7, Mr. E. Siskin Ms. N. Williams Mr. J. Russ Mr. W. Horstman Mr. K. Parikh Mr. B. Atalay Ms. D. Leong Mr. B. Shakibinia Project File l

l l

I l

q l

l l

1

)

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _