Forwards Rev 6 to Updated FSAR for Calvert Cliffs Nuclear Power Plant Units 1 & 2.Submittal of Revised Chapter 11 Re Waste Processing & Radiation Protection Estimated by 880331. Attachment 1 Identifies Changes Made
ML20237J830
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 08/28/1987
From: Tiernan J
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20237J832 List:
References
NUDOCS 8709040089
Download: ML20237J830 (5)


Text

,_-, -

[ y;

}-

I BALTIMORE gJ GAS AND ELECTRIC

[

CHARLES CENTER P. O. BOX 1475 BALTIMORE, MARYLAND 21203 JOSEPH A.TIERNAN Vict PmtsiotNT NUCLEAR ENEROY August 28, 1987 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:

Document Control Desk

SUBJECT:

Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 Uodated Final Safety Analysis Report

REFERENCE:

(a) Letter from Mr. J. A. Tiernan (BG&E) to NRC Document Control Desk, Request for Exemption from Annual Reporting Requirements in 10 CFR 50.54(a)(3) and 10 CFR 50.71(e)(4), dated June 11, 1987 Gentlemen:

Enclosed 'for your-information and use is one signed original and ten additional copies of Revision' 6 to our Updated Final Safety Report (FSAR). These copies are provided in accordance with 10 CFR 50.71(e) and 50.4(b)(6) with two exceptions. Although 10 CFR. 50.71(c)(4) requires licensees to submit revisions at least annually, we are submitting Revision 6 one year and two m9nths later than Revision 5 for reasons given in Reference (a).'

Also, Chapter ' 11, Waste Processing and Radiation Protection, needs to be revised to account for changes we made in processing radiological waste since we were originally licensed. Our Offsite Dose Calculation Manual (ODCM) contains the current methodology and parameters used in the calculation of offsite doses due to radioactive gaseous and

' liquid effluents, in the calculation of gaseous and liquid effluent monitoring alarm / trip setpoints, and in the conduct cf the environmental radiological monitoring program. The ODCM was submitted to you when we amended ' our Ra1.n*ive Effluent Technical Specifications. We are currently updating Chapter 11 using informate in the ODCM. We estimate we will submit a revised Chapter 11 by March 31,1988. In the attached revision, we have added a note at the beginning of Chapter 11 to inform the reader that'information in the chapter is not currcnt and may not be correct.

Attachment I to this letter identifies facility changes made under the provisions of 10 CFR 50.59 and reflected in this revision, but not previously reported to the Commission. The List of Effective Pages for the FSAR is included with the enc!, sed

revision,

{R09040089 B70828

(

l g

ADocR 0300oa27

l PDR

\\i '

nT.

  • ^^^

i(

Document Control Desk August 28, 1987 Page 2 Please replace the appropriate pages of your copies of the Updated FSAR with the enclosed pages and then complete and return the Transmittal of Document form included as Attachment 2 to the letter.

i-Very truly yours,

/*

&dtA-- -

STATE OF MARYLAND :

L TO WIT:

COUNTYOFCALVERT :

i E

Joseph A. Tiernan, being duly sworn states that he is Vies President of the Baltimore Gas and Electric Company, a corporation-of the State of M trciand; that he provides the foregoing response for the purposes therein set forth; tha; the statements made are true and correct to the best of his knowledge, information, and belief; and that he was authorized to provide the response on behalf of said Corporation.

J$

WITNESS my Hand and Notarial Seal:

' t t 74 / A/ - h M /

Notary Public

/ <e/ / / /9f 7 My Commission Expires: Qolt$; /9@

/

)

0 Date '

JAT/ WPM / dim Attachmaats Enclosures I

cc:

D. A. Brune, Esquire (w/o Attachment 2 and Enclosures)

J. E. Silberg, Esquire R. A.Capra, NRC

, S. A.McNeil, NRC

)

W. T. Russell, NRC T. Foley/D. C. Trimble, NRC i

I I

Document Control Desk August 28, 1987 Page 3 1

bec: WITIIOUT ATTACIIMENT 2, or ENCLOSURES J. A. Tiernan R. F. Ash /R. C. L. Olson l

C. H. Cruse /P. E. Katz R. E. Denton/J. A. Mihalcik R. M. Douglass/S. E. Jones, Jr.

T. N.

Pritchett/M. Gavrilas/E.

I.

Bauereis J. R. Lemons /R. P.11eibel W. J. Lippold/A. R. Thornton F. J. Munno R. B. Pond /R. E. Cantrell L. B.

Russell /J.

T.

Carroll R. C. DeYoung C. M. Rice R. G. Staker W. R.

Ilorlacher, ll!

D. L. Shaw, Jr.

L. S. Larragoite W. P. McCaughey, Jr.

P. E. McGrane M. E. Bowman /L. E. Salyards

}

ATTACIIMENT I List of Facility Change Requests reflected in Revision 6 of the Updated FSAR and not yet reported in an Annual Report, per Paragraph 50.59(b).

80-!6 81-1061 82-45 83-1029 83-1049 84-96 84-119 84-150 84-1079 84-1090 85-1015 85-1048 86-17 86-123 86-142 86-3004 87-59 85-60 87 63 87-64 87-65 87-71 1

h

\\

l

]

ATTACHMENT 2 FINAL SAFETY ANALYSIS REPORT TRMISMITTAL LETTER #87-01 Copy 1 thru 11 TO:

4RC Document Control Desk FROM
Paul E. McGrane, Technical Librarian Quality Assurance and Staff Services Dept.

Baltimore Gas & Electric Company Calvert Cliffs Nuclear Power Plant Lusby, Maryland 20657 DATE: 09-01-87 Please update your. copy (ies) of the Updated Final Safety Analysis Report with the enclosed changes / revisions. The attached pages constitute Revision #6.

Upon completion, please return thfs form signed and dated.

NOTE:

Individual page revisions should now be located immediately following each Chapter Table of Contents The changes / revisions to the Updated Final Safety Analysis Report have been received and incorporated.

l Signef' Date b-

-