Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217A0001998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Haddam Neck Plant ML20217D7381998-02-28028 February 1998 Revised MOR for Feb 1998 Haddam Neck Plant ML20216D6531998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Haddam Neck Plant CY-98-012, Monthly Operating Rept for Jan 1998 for Connecticut Yankee Haddam Neck Plant1998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Connecticut Yankee Haddam Neck Plant ML20198N6681997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Haddam Neck Plant ML20203K4271997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Haddam Neck Plant ML20199B1141997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Haddam Neck Plant ML20198J8811997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Haddam Neck Plant ML20210U9301997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Haddam Neck Plant ML20210L0521997-07-31031 July 1997 Monthly Operating Rept for July 1997 for HNP ML20149E4451997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Haddam Neck Plant ML20140H5241997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Haddam Neck Plant ML20141D4141997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Connecticut Yankee Haddam Neck ML20137W8051997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Haddam Neck Plant ML20137A0801997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Haddam Neck Plant ML20138K5721997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Haddam Neck Plant.W/ ML20133M6121996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Yankee Haddam Neck Plant ML20132B9861996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Connecticut Yankee Haddam Neck Plant ML20134K7331996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Haddam Neck Plant ML20128Q7661996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Connecticut Yankee Haddam Neck Plant ML20058P2691993-11-30030 November 1993 Monthly Operating Rept for Nov 1993 for Haddam Neck Plant ML20059M1881993-10-31031 October 1993 Monthly Operating Rept for Oct 1993 for Haddam Neck Plant.W/ ML20057G0561993-09-30030 September 1993 Monthly Operating Rept for Sept 1993 for Connecticut Yankee Haddam Neck Plant ML20057B3041993-08-31031 August 1993 Monthly Operating Rept for Aug 1993 for HNP ML20128H6131993-01-31031 January 1993 Monthly Operating Rept for Jan 1993 for Haddam Neck Plant.W/ ML20127E5711992-12-31031 December 1992 Monthly Operating Rept for Dec 1992 for HNP ML20126A5011992-11-30030 November 1992 Monthly Operating Rept for Nov 1992 for Haddam Neck Plant.W/ ML20217A1991990-10-31031 October 1990 Monthly Operating Rept for Oct 1990 for Haddam Neck Plant ML20058A0891990-09-30030 September 1990 Revised Monthly Operating Rept for Aug 1990 for Haddam Neck Plant Unit 1 ML20059J1301990-08-31031 August 1990 Monthly Operating Rept for Aug 1990 for Haddam Neck Plant.W/ ML20247F6141989-08-31031 August 1989 Monthly Operating Rept for Aug 1989 for Haddam Neck Plant ML20245L8191989-07-31031 July 1989 Monthly Operating Rept for Jul 1989 for Haddam Neck Plant ML20246K1831989-06-30030 June 1989 Monthly Operating Rept for June 1989 for Haddam Neck Plant ML20244E1511989-05-31031 May 1989 Monthly Operating Rept for May 1989 for Haddam Neck Plant ML20247A1291989-04-30030 April 1989 Monthly Operating Rept for Apr 1989 for Haddam Neck ML20244D0831989-03-31031 March 1989 Monthly Operating Rept for Mar 1989 for Connecticut Yankee Haddam Neck Plant ML20236C7591989-02-28028 February 1989 Monthly Operating Rept for Feb 1989 for Haddam Neck ML20206F6931988-10-31031 October 1988 Monthly Operating Rept for Oct 1988 for Haddam Neck Plant ML20207N6241988-09-30030 September 1988 Monthly Operating Rept for Sept 1988 for Haddam Neck.W/ ML20154H7701988-08-31031 August 1988 Monthly Operating Rept for Aug 1988 for Haddam Neck Plant.W/ ML20151U8221988-07-31031 July 1988 Monthly Operating Rept for Jul 1988 for Haddam Neck Plant ML20151D4601988-06-30030 June 1988 Monthly Operating Rept for June 1988 for Haddam Neck Plant ML20155D2141988-05-31031 May 1988 Monthly Operating Rept for May 1988 for Haddam Neck Plant ML20154C5771988-04-30030 April 1988 Monthly Operating Rept for Apr 1988 ML20151F9941988-03-31031 March 1988 Monthly Operating Rept for Mar 1988 ML20150B9331988-02-29029 February 1988 Monthly Operating Rept for Feb 1988 ML20148G7771988-02-29029 February 1988 Reactor Coolant Data for Feb 1988 ML20149H3401988-01-31031 January 1988 Monthly Operating Rept for Jan 1988 ML20147D8761987-12-31031 December 1987 Monthly Operating Rept for Dec 1987 ML20237B9861987-11-30030 November 1987 Monthly Operating Rept for Nov 1987 1998-03-31
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217K3301999-10-19019 October 1999 Safety Evaluation Supporting Amend 195 to License DPR-61 ML20206C8761999-04-28028 April 1999 Safety Evaluation Supporting Amend 194 to License DPR-61 CY-99-047, Ro:On 981217,identified Unsuccessful Dewatering of Cnsi HIC, Model PL8-120R,containing Resins.Caused by Apparent Failure of Dewatering Tree.Other HICs Have Been Procured,Recertified & Returned to Plant for Use1999-03-23023 March 1999 Ro:On 981217,identified Unsuccessful Dewatering of Cnsi HIC, Model PL8-120R,containing Resins.Caused by Apparent Failure of Dewatering Tree.Other HICs Have Been Procured,Recertified & Returned to Plant for Use ML20206F1971998-12-31031 December 1998 Annual Rept for 1998 for Cyap. with CY-99-027, Annual Rept for 10CFR50.59, for Jan-Dec 1998.With1998-12-31031 December 1998 Annual Rept for 10CFR50.59, for Jan-Dec 1998.With ML20198G9101998-12-22022 December 1998 Proposed Rev 2 of Cyap QAP for Haddam Neck Plant. Marked Up Rev 1 Included ML20238F2131998-08-28028 August 1998 SER Accepting Defueled Emergency Plan for Emergency Planning for Connecticut Yankee Atomic Power Co CY-98-136, Ro:On 980727,flow Blockage Occurred & Caused Pressure in Sys to Increase,Resulting in Relief Valve Lifting & Pipe Vibration,Which Caused Leaks to Develop.Caused by Nearly Closed post-filter Inlet Valve.Repaired 2 Leaks in Line1998-08-12012 August 1998 Ro:On 980727,flow Blockage Occurred & Caused Pressure in Sys to Increase,Resulting in Relief Valve Lifting & Pipe Vibration,Which Caused Leaks to Develop.Caused by Nearly Closed post-filter Inlet Valve.Repaired 2 Leaks in Line ML20237B7461998-07-22022 July 1998 1998 Defueled Emergency Plan Exercise Scenario Manual, Conducted on 980722 ML20202D1621998-06-30030 June 1998 Safety Evaluation Supporting Amend 193 to License DPR-61 CY-98-068, Follow-up to Verbal Notification on 980413 of Film on Discharge Canal.Investigation Continuing.Samples Collected for Petroleum Analyses & Biological Characterization at Intake Structure & Discharge Canal.Replaced Sorbent Booms1998-04-15015 April 1998 Follow-up to Verbal Notification on 980413 of Film on Discharge Canal.Investigation Continuing.Samples Collected for Petroleum Analyses & Biological Characterization at Intake Structure & Discharge Canal.Replaced Sorbent Booms CY-98-045, Ro:On 980212,0219,0225 & 0312,separate Sheens of Approx One Cup of oil-like Substance Was Observed at Discharge Canal. Cause Has Not Been Clearly Identified.Called in Vendor Spill to Install Sorbent Booms to Absorb Sheen.W/One Drawing1998-04-13013 April 1998 Ro:On 980212,0219,0225 & 0312,separate Sheens of Approx One Cup of oil-like Substance Was Observed at Discharge Canal. Cause Has Not Been Clearly Identified.Called in Vendor Spill to Install Sorbent Booms to Absorb Sheen.W/One Drawing ML20217F0611998-03-31031 March 1998 Historical Review Team Rept ML20217A0001998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Haddam Neck Plant ML20217K2101998-03-27027 March 1998 Safety Evaluation Supporting Amend 192 to License DPR-61 CY-98-046, Follow-up to 980311 Verbal Notification of Film on Discharge Canal.Cause Not Yet Determined.Film Is Contained & Will Be Absorbed by Containment & Sorbent Booms That Were in Place in Discharge Canal1998-03-12012 March 1998 Follow-up to 980311 Verbal Notification of Film on Discharge Canal.Cause Not Yet Determined.Film Is Contained & Will Be Absorbed by Containment & Sorbent Booms That Were in Place in Discharge Canal ML20216D6531998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Haddam Neck Plant ML20217D7381998-02-28028 February 1998 Revised MOR for Feb 1998 Haddam Neck Plant CY-98-012, Monthly Operating Rept for Jan 1998 for Connecticut Yankee Haddam Neck Plant1998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Connecticut Yankee Haddam Neck Plant CY-98-010, Annual Rept for 10CFR50.59,Jan-Dec,19971997-12-31031 December 1997 Annual Rept for 10CFR50.59,Jan-Dec,1997 ML20198N6681997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Haddam Neck Plant ML20217P4861997-12-31031 December 1997 1997 Annual Financial Rept, for Cyap ML20199L5891997-12-24024 December 1997 Independent Analysis & Evaluation of AM-241 & Transuranics & Subsequent Dose to Two Male Workers at Connecticut Yankee Atomic Power Plant ML20203K4271997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Haddam Neck Plant ML20199B1141997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Haddam Neck Plant ML20198M8101997-10-14014 October 1997 SER Accepting Proposed Revs to Util Quality Assurance Program at Facility ML20198J8811997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Haddam Neck Plant ML20210P8721997-08-31031 August 1997 Post Decommissioning Activities Rept, for Aug 1997 ML20217Q3171997-08-31031 August 1997 Addl Changes to Proposed Rev 1 to QA Program ML20210U9301997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Haddam Neck Plant CY-97-082, Special Rept:On 970708,routine Surveillance Testing of Seismic Monitoring Sys Instrumentation Revealed,Data Was Not Being Reproduced by Portion of Playback Sys.Station Presently Pursuing Replacement of Seismic Monitoring Sys1997-08-14014 August 1997 Special Rept:On 970708,routine Surveillance Testing of Seismic Monitoring Sys Instrumentation Revealed,Data Was Not Being Reproduced by Portion of Playback Sys.Station Presently Pursuing Replacement of Seismic Monitoring Sys ML20210L0521997-07-31031 July 1997 Monthly Operating Rept for July 1997 for HNP ML20149E4451997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Haddam Neck Plant ML20141A0041997-05-31031 May 1997 Independent Assessment of Radiological Controls Program at Cyap Haddam Neck Plant Final Rept May 1997 ML20140H5241997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Haddam Neck Plant ML20141K4201997-05-22022 May 1997 Safety Evaluation Supporting Amend 191 to License DPR-61 ML20141D4141997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Connecticut Yankee Haddam Neck ML20138G5901997-04-25025 April 1997 Proposed Rev 1 to Cyap QA Program for Haddam Neck Plant ML20137W8051997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Haddam Neck Plant ML20137H3031997-03-31031 March 1997 Rev 2 to Nuclear Training Loit/Lout Audit Reviews ML20137C6281997-03-14014 March 1997 Redacted Version of Rev 1 to Nuclear Training Loit/Lout Audit Reviews ML20137A0801997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Haddam Neck Plant ML20135C5101997-02-26026 February 1997 1996 Refuel Outage ISI Summary Rept for CT Yankee Atomic Power Co B16268, Special Rept:On 970205,declared Main Stack-Wide Range Noble Gas Monitor Inoperable.Caused by Inadequate Calibr Methods. Will Revise Calibr Procedure to Technique to Demonstrate Accuracy & Linearity Over Intended Range of Monitor1997-02-19019 February 1997 Special Rept:On 970205,declared Main Stack-Wide Range Noble Gas Monitor Inoperable.Caused by Inadequate Calibr Methods. Will Revise Calibr Procedure to Technique to Demonstrate Accuracy & Linearity Over Intended Range of Monitor ML20135E3221997-02-13013 February 1997 Independent Review Team Rept 1996 MP -1 Lout NRC Exam Failures ML20134L2751997-02-0303 February 1997 Draft Rev to GPRI-30, Spent Fuel Storage Facility Licensing Basis/Design Basis ML20138K5721997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Haddam Neck Plant.W/ ML20134L2791997-01-10010 January 1997 Rev 0 to QA Program Grpi ML20134L2911997-01-0808 January 1997 Rev 0 to UFSAR Rev Grpi ML20134L2721996-12-31031 December 1996 Commitment Mgt Grpi 1999-04-28
[Table view] |
Text
Q CONNECTICUT YANKEE ATOMIC POWER COMPANY HADDAM NECK PLANT HADDAM, CONNECTICUT l
MONTHLY OPERATING REPORT NO. 87-07 FOR THE MONTH OF JULY 1987 ERS S&M 858@kh3 .
/'
R L _ _ __ ___
PLANT OPERATIONS SIMfARY - J_ULY 1987 The following is a summary of plant operations for July 1987.
Connecticut Yankee operated at 100 percent power until July 18, 1987.
On July 18 at 0001 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, a load reduction was commenced for the scheduled refueling and maintenance outage. At 0334 hours0.00387 days <br />0.0928 hours <br />5.522487e-4 weeks <br />1.27087e-4 months <br />, the generator was separated from the grid. At 1145 hours0.0133 days <br />0.318 hours <br />0.00189 weeks <br />4.356725e-4 months <br />, the reactor was' shutdown and hot standby Mode 3 was obtained. ]
On July 19 at 0502 hours0.00581 days <br />0.139 hours <br />8.300265e-4 weeks <br />1.91011e-4 months <br />, the plant transitioned to hot shutdown Mode 4. At 2312 hours0.0268 days <br />0.642 hours <br />0.00382 weeks <br />8.79716e-4 months <br />, cold shutdown Mode 5 was obtained.
On July 25 at 2315 hours0.0268 days <br />0.643 hours <br />0.00383 weeks <br />8.808575e-4 months <br />, refueling Mode 6 coumenced.
The outage continued for the remainder of July 1987.
I i
i L_ _--
~ E OCR
- TAEG NRN E I KRR =
AOU
_ TFD t
N OT a I N .
- TE
. CVN
- AEORI EPT
_ V I I OT TTE C - P ENE
- RER RK
- OA
- CT N
O 1
Er NF K OAR SE P
O 7
8 9
1 T L
Y U L S U E J R N
S L
O I
O T R C T N N U O F C L
& A M
T E N S E
M U U A R C T
S lf I
7 8
r9 o1 f
y sl T mu N eJ 1-E t D N oif TRO SOP n o e
Y M el h S O rbt C aant o erm ro .
epe h eh T rt I 4 % & i I + r '
I F l
- EG NRN E I KRR AOU TFD -
7 N
OT
TE CVN AIO P I E P' T
- V I IOT E
C T.P T
ENE RER RK OA CT N
O I
ET NFA OAR SE
' P O
7 T 8 L 9 U 1
S Y E L R U N J O I T
C N
U F
L A
M E
C E N S A U N A E C T
N I
A M
t .
re7 oh8 T pt9 N e 1 M E rr E - N oy TRO ofl SOP n u Y M sJ S O C
em ref at o i
e h ret el n hb o Tam
[j i! 4 : , , ; i + 1) ji ,
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-213 Conn. Yankee UNIT Haddam Neck DATE August 15, 1987 COMPLETED BY C. B. Dean TELEPHONE (203) 267-2556 MONTH: JULY 1987 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) ,
1 541 17 527 2 540 18 20 3
542 19 0 4 541 20 0 ,
539 0 5 21 537 0 6 22 536 0 7 23 0
8 24 9 25 10 532 26 0 11 529 27 0 12 526 28 0 13 522 29 0
-14 521 30 0 15 523 31 0 16 526 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Complete the nearest whole megawatt.
(9/77)
4 1
, ~ ,
g, I-
. e p
I
, r3 s .
9 .
)
Q. ,
CONNECTICUT YANKEE REACTOR COOLANT DATA N- MONTH JULY 1987 ,
[ n' REACTOR COOLANT ANALYSIS HINIMUM AVERAGE MAXIMUM
- ..+ .. . ....... ........ .... .......................... ... ... .... .... . .
.PH.0 25. DEGREES C,c : 4.58E+00 : 5.32E+00 : - 7.63E+00 5f. CONDUCTIVITY (UMHOS/CM). : 3.20E+00 : 5 73E+00 : 1 60Ef01
- CHLORIDESL(PPM) : <5 00E-02 : <5.00E-02 : <5.00E-02 :
DISSOLVED OXYOEN (PPB) : <5.00E+00' 1 03E+01 : 1.00E+02 :
BORON (PPM) : 1.90E+01 : 1.06E+03 2 72E+03~
' LITHIUM =(PPM) : 1.70E-02 : 2.57E-01 : 9 90E-01 :
TOTAL GAMMA ACT. (UC/ML) : 1.53E-03 2 58E-01 : 8.40E-01 :
- . IODINE-131 ACT. (UC/ML) : '4.20'E-03 :. 1 32E-0? 1.48E-01 :
1-131/I-133; RATIO : l1,47 E +00 2 10E+00 1 8 37E+00 :
CRUDc(MG/ LITER) : <1.00E-02-: <1 00E-02 : <1.00E-02 :
TRITIUML(UC/ML) ! 1.47E-01 t' 6.21E-01 : 9 38E-01 :
HYDROGEN (CC/KG) , 1. 00 E . + 00 : 2 18E+01 : 2.98E+01 :
1 f
a
, ..AERATEDLLIQUID WASTE PROCESSED (GALLONS): 3.75E+05
- WASTE LIQUID PROCESSED'.THROUGH BORON RECOVERY (GALLONS): 1.84E+05 AVERAGK PRIMsRY LEAK RATFf4GAO.DNS PER MINUTE): 3. 47E-M1 ',
PRIMARY-TO. SECONDARY LEAK' RATE (GALLONS'PER MINUTE): 0.00E+00 5
i
\
n
. Shutdown for Refueling / Maintenance outage July 18,1987 i
" t, i
a .
I L
l 1 . , ., ,
.I
. j
~. .. 4- lNRC;Dperating Status' Report
.Haddam Neck
.ibocket:50-213-
- 2. Reporting Feriod: 07/87 Outage + Dn-line Hours:- 332.4 + 411.6 = 744.0 3.' Utility
Contact:
J. Stanford (203) 267-2556 ext 325
.4. Licensed 'Thersal. Power (MWt): 1825 5.'Naseplate Rating 16ross MWe): 667 x 0.9 = 600.3
.J
- 6. Design Electrical Rating-(Net MWe): 582 1
- 7. Muinus Dependable Capacity (Gross MWe): 595.8
' 8. Maxieus Dependable Capacity (Net MWe): 569 ]
- 9. lf changes occur aboYe since last report, reasons are: NONE j
- 10. Power level to thsch restricted, if any (Net MWe): N/A j
!!. Reasons for restriction, if any: N/A l MONTH YEAR-10-DATE CUMULATIVE L 12. . Report period hours: 744.0 5,C87.0 171,647.0 l-l- 13i Hours reactor cr.' als 419.8 4,728.9 146,199.0
- 14. Reactot reserve shutarwn hours: . 0. 0 /. 0 1,285.0'
- 15. Hours generator 'on-line: 411.6 4,700.2 140,187.9
- 16. Unit reserve shutdown hours: 0.0 0.0 398.0
- 17. Gross thermal energy generated (MWtH): 747,648.0 8,389,543.0 242,770,004.0 2 18.-Gross electrical energy generated (MWeH): 229,363.0 2,667,885.0 79,4b0,807.0 t
- 19. Net electrical energy generated (MWeH): 216,382.0 2,539,158.8 75,569,646.0 1
- 20. Dait service fact 9' 55.3 92.4 81.7
- 21. Unit availability f actor: ,
55.3 92.4 B1.9
- 22. Unit capacity factor using MDC net: 51.1 87.7 B0.6
- 23. Unit capac,ity f actor using DER net: 50.0 85.7 75.7
- 24. Unit forced outage rate: 0.0 1.1 6.0
- 25. Forced outage hours: 0.0 54.4 B,975.6 l^
- 26. Sheldowns schedaled over next 6 aorP5 (type,dEtt, duration): NCHE
- 27. If currently shutdown, estimated startup date: 10!!5/87 l-l^
! Cun!stive values free the first criticality (07/24/67). (The remaining cueulative values are from the first date of coneertiel operation, 01/01/68).
L
- ng - i n e 0 ou 3 t e R - reo6 c r G a e p1 5 CAC0 ph e0 2 e r V t eSR -
.EEY r s X i r OMTBE roc bP ytE NAA N ot e R
i rnR NDDO C n h rt eU T EH V xonvN ET TP & ot I EfEE(
KI EE in X 4
CN LL et e OU PE scv e r
D MT uAe O a r o m C C P C a) rn mci aS a r
~
X ccp o" X S i x tE o O'0 l ll a(
~
n" e u
- aa mr d uu oe F onn th h aa ut 1
t MM AO e - - -
M1 2 34 3
$0 -
S N
4 eU m C O R I
T C
U D
E .
n R R T a i E F / a R 7 L R n l E 8 p W 9 g" 2M x O 1 m E P
Y hO (
r D L w5. i @,*
j 1 e N U h A J
. ua e. 8,y? t S .
O N H W H ,o E5 O T D N N C T O U M H )
S T n R .
i T O s I P r a N E h l p
U R 3oO" :
5 x fuNE 2 E
( t 4 s 2 ee 3 rT u
l r i o eS* a F e S c t ngr nanort enit os mel at
- pt el an ninuurir ouif ge me 7 s q a e e p e 8 t -
aEMRROA a 8 e - - -
D 1 RABCDEF 2
7 d
e l
d u ed
. ce o 3 rh N 0 oc
- FS 7
8 FS 1
Y u cy- . V
'I -REFUELING INFORMATION REQUEST 4, .
- 1. 1Name'of facility-
' Connecticut Yankee Atomic Power' Company-L "2. Scheduled date for next refueling shutdown.
L Began present. refueling outage July 18, 1987
<3. Scheduled date for restart following refueling.
October 15.-1987 (firstfday at full power)
- 4. (a) . Vill refueling or resumption of operation thereafter require a technical-speci-fication change or other license amendment?
.YES' (b) If answer'is yes, what, in general, will these be?
. Technical Specifications'related to revised physics reload _ methodology and transient {
analyses design basis. '
(c) If answerJis no, has the reload fuel design and core configuration been reviewed by your Plant Safety. Review Committee to determine whether any unreviewed safety questions are associated ' with the et,t e reload (Ref. ' 10 CFR Section 50.59)?
Not applicable'.
' (d). .If no such review has taken place, when is it scheduled?
-Not applicable.
- 5. Scheduled'date(s) for= submitting proposed licensing action and supporting information.
Submitted 6/1/87:
- 6. Important licensing considerations, associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
NO .
.7. -The number of fuel assemblies (a) in the core and (b).in the spent fuel storage pool. j l
- (a). 157 (b) 653 1 8.- The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or 1.s planned, in number of fuel assemblics.
-1168 9.= .. The projected date of the last refueling that can be discharged to the spent fuel
. pool assuming the present ideensed capacity, j 1906 n
l l
En2_1____ ____ _ __. _ . _ _ _ _ _ _ _ _
i CONNECTICUT YA'NKEE ATOMIC POWER COMPANY HADDAM NECK PLANT RR#1
Dear Sir:
In accordance with reporting requirements of Technical Specification 6.9.1d, the Connecticut Yankee Haddam Neck Plant Monthly Operating Report 87-07, covering oporations for the period July 1, 1987 to July 31, 1987, is hereby forwarded.
Very truly yours, Donald B. Miller, Jr.
Station Superintendent DBM/mdw Enclosures cc: (1) Regional Administrator, Region i U. S. Nuclee.r Regulatory Commission 631 Park Ivenue King of Prussia, PA 19406 (2) T. Shedlowsky Sr. Resident Inspector Connecticut Yankee 4b g l