.Etscraic 1
- a 1901 Gratiot Street St. Louis Donald F. Schnell Hoe President August 13, 1987 i
4 U.S. Nuclear Regulatory Commission ATTN:
Document-Control Desk Washington, D.C.
20555 Gentlemen:
ULNRC-1576 DOCKET NUMBER 50-483 CALLAWAY PLANT RESPONSE TO ADDITIONAL INFORMATION REQUEST REGARDING CYCLE '3 RELOAD APPLICATION References 1)
ULNRC-1470 dated March 31, 1987 2)
NRC Letter dated August 3,1987 from T. W. Alexion to D.
F.
Schnell Reference 1 transmitted the licente application for Callaway Cyc le - '3.
Attached to this letter is the response to your request for additional information t.ransmitted by Reference 2.
If there are any further questions, please contact us.
Very truly yours, g--
/
Don ld F.
chnell DS/ mat cc:
E.
F. Branagan, Jr.
8708180131 870813 0l1 PDR ADOCK 05000483
-P PDR
~
Maihng Address: P.O. Box 149 St. Louis, MO 63166
r d
STATE OF MISSOURI )
)
i Robert J.
Schukai, of la4ful age, being first duly sworn upon oath says that he is General Manager-Engineering (Nuclear) for Union Electric Company; that he has read the foregoing document and knows the content thereof; that he has executed the same for and on behalf of said company with full power and authority to do so; and that the facts therein stated are true and correct to the best of his knowledge, information and belief.
f
(
tw By _
Robe t'J.~ "chukai Gene ager-Engineering Nuclear SUBSCRIBED and sworn to before me this /Jbday of
, 198 7
' Yh/A4J '
)
UAiGAR/d PTA8 O[/
h01 arf FUBUC, STATE OF MISSOURI MY COMMISSION EXPIRES APRIL 22, 1983 ST. LOUIS COUNW
(
t
U LNRC-1576 RESPONSE TO ADDITIONAL INFORMATION REQUEST REGARDING CYCLE 3 RELOAD APPLICATION Question Provide an estimate of the burnup (in megawatt-days per metric ton of uranium) for the highest power assembly in the Cycle 3 reload core.
Provide the basis for the estimate.
Response
The ful1~ power end-of-life cycle burnup for Cycle 3 is 18,200 MWD /MTU.
A two dimensional quarter core pin-by-pin l
diffusion theory model (Westinghouse TURTLE code) was developed for the Cycle 3 loading pattern.
.This model was depleted to 19,000 MWD /MTU to include a possible coastdown at the end of Cycle 3.
Based on the 19,000 MWD /MTU model, the burnup of the highest power assembly in Cycle 3 is 23,87 0 MWD /MTU.
l i
f l
4 l
t u--_--
1
t cc:
Gerald Charnoff, Esq.
Shaw, Pittman, Potts & Trowbridge 2300 N. Street, N.W.
Washington,.D.C.
20037 Dr. J. O. Cermak CFA, Inc.
4 Professional Drive (Suite 110)
Gaithersburg, MD 20879 W.
L.
Farney Chief, Reactor Project Branch 1 U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road l
Glen Ellyn, Illinois 60137 Bruce Little Callaway Resident Office U.S. Nuclear Regulatory Commission RR$1 Steedman, Missouri 65077 Tom Alexion (2)
Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 316 7920 Norfolk Avenue Bethesda, MD 20014 Ron Kucera, Deputy Director Department of Natural Resources I
P.O. Box 176 Jefferson City, MO 65102 Manager, Electric Department Missouri Public Service Commission P.O. Box 360 Jefferson City, MO 65102 l
I l
l 4
1
-