Mod 8,providing Addl Funds & Definitizing Task Order 10,to Fuel Cycle Licensing Technical Assistance
ML20237J322
Person / Time
Issue date: 07/23/1987
From: Wiggins E, Wright N
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM), SCIENCE APPLICATIONS INTERNATIONAL CORP. (FORMERLY
To:
Shared Package
ML20237J320 List:
References
CON-FIN-D-1067-7, CON-NRC-02-87-004, CON-NRC-2-87-4 NUDOCS 8708180095
Download: ML20237J322 (5)


Text

, _

1. CON 1 RACT 10 CODE PAGE OF PAGES l

}

MENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT.

1 l-2

2. AMENOMENT/MOOlFICAY 60N NO.
3. EF F ECTIVE DAYE 4 REQUI$lilON/ PURCHASE REQ. NO.
5. PROJECT NO. (11applicade) 8-7/16/87 1MS-87-004-dtd 6/26/87 CODEI CODE!
6. ISSULO uv U.S. Nuclear Regulatory Commission Division of Contracts Washington, DC 20555 j
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) y)

9A. AMENOMENT OF SOLICITATION NO.

Sciench Applications International Corporation 3

Attn:

Nancy Wright, Contract Representative I

Environmental Technology Group

90. DATED (SEE / TEM J J) 1710 Goodridge Drive, MS G-6-1 I

McLean, VA 22102 20^ gO4F6 CATION OF CONTRACT / ORDER 4

X NRC-02-87-004

-1 108. DATED (SEE ATEM 13)

CODE l FACILITY CODE 10/10/86

)

11. TH!S ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

'd The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not ex-Unded.

Of fers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

]

I (a) By completing items 8 and 15. and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of ". lie of fer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG-MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted,such change may be made by telegram or letter. provided each telegram or letter makes reference to the solicitation and this amendment,and is re ived prior to the opening hour and date specified

12. ACCOUNTING AND APPROPRI ATION DA r A (1/ requiredi 50-19-01-00 FIN: D1067-7 31X0200.507 Obligate:

$60,000.00

13. THIS ITEM APPLIES Of 'tY TO MODIFICATIONS OF CONTRACTS / ORDERS, IT MODIFIES THE CONTRACT / ORDER NO. AS DESCRIBED IN ITEM 14.

A.

S HANG OR E SS EO PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CON.

]

g

6. THE ABOVE NUMBEREO CONTR ACT/ ORDER IS MOOtFIED TO REFLECT THE ADMINISTR ATIVE CHANGES (such as changes in paying office, appropriorion date, etc.) SET FORTH lN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C.1 HIS SUPPLEMENT AL AGR EEMLNT IS EN rEREO INTO PURSUAN T 10 AU1HORIT Y OF X

Paragraphs G.1 and G.10 of the contract, and mutual agreement of the parties, w O we A <spus im or mosmcatwn and aufnarilsJ B708160095 B 3808 PDR CONTR NRC-02-B7-OO4 PDR l

_E Contractor b is not, b is required to sign this docurnent and return copies 10 the issuing Of fice.

E. IMPORT ANT:

l MESC R LPT SON OF AMENOMENT/MODIF ICA i SON (Organized by UCF section headings, including sohcitation/ con tract su bject rnatter where (e:ssitde.)

^

l This modification definitizes Task Order No. 010. " Environmental Review, All Chemical Isotope Enrichment, Inc., Isotope Enrichment Plants, Oak Ridge, Tennessee," and provides additional funding under the contract.

1.

Pursuant to paragraph G.10, Task Orders, the contractor is autnorized to perform Task Order No. 010 in accordance with the Jiily 8,1987 proposal which is incorporated herein by reference and with the attached Statement of Work.

t Task Order No. 010 shall be in effect. for the period of July 16, 1987 through January 15, 1988.

Euc6 as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in f ull force 15A. NAME AND T 4TLE OF SIGNER (7'ype orprint) 16A. N AME AN D TIT tJ. OF CONT R ACTING OFFICER (Type or print) k(90L ]~ CD$6Wogy.

Nancy P. Wright Contract Representative Elois J. Wiggins O ST ATES OF MERICA ltC.DATE SIGNED 150. CONT R AC T OR/OF F E ROR A SC. DATE SIGNED pp. UNIT 7/ ~JGP C l#-

a M. 1 44[

sy (Syfature of QfatmetingT (scer)

~~} )) f]

(Ssgnalure of person esfortsed to sign) 0/0/0 V

STANDARD FORM h ( V.10-83)

NSN 75t0-01 152 8070 30 105 f PREVIOUS ColTION UNUSAULE Prescritwd by GSA.

j FAR (48 CFR) 53.243

F

'.4 NRC-02-87-004 Modification No. 8 Page 2 of 2 l

l The total cost ceiling of this task is $59,473.00, of which $55,068.00 l

represents the total estimated cost and $4,405.00 represents.the fixed i

fee (8%).

l l

2.

Under Section G - Contract Administration Data, paragraph G.1, Contract l

Ceiling Amount, the second sentence is revised to read:

l "The amount of funds available for performance under this contract is l

increased by $60,000.00, from $498,900.00 to fr5587900r00."

$ %9,200 00

$rsg 700. 00. %%

All other terms and conditions remain the same, l

l l

l l

l 1

l l

i

q

.?

(

,1.

l

{

ENVIRONMENTAL REVIEW ALL CHEMICAL IS0 TOPE ENRICHMENT, INC.

1 IS0 TOPE ENRICHMENT PLANTS.

0AK RIDGE, TENNESSEE l

TASK 10 B&R NO. 50-19-01 FIN: -01067-7

1.0 Background

)

On September 25, 1986, All Chemical Isotope Enrichment, Inc., (A1ChemIE)-

requested that the Commission " initiate whatever process is necessary for-us to obtain a ' License to Utilize Centrifugal Machines '.to Enrich;Non-radioactive Isotopes. '"' The non-radioactive isotopes would be used ~ "in medical, industrial, environmental and energy conservation areas." As stated in their letter, AlChemIE has discussed with the Department of Energy (DOE) the utilization of " surplus" DOE ' centrifuge inachines for i

their purpose. DOE vigorously supports this prospective ose of the i

centrifuge machines, even though they were designed for a different purpose.

Nevertheless, the Atomic Energy Act-states that a license is-required for.such a facility pursuant to 10 CFR Part 50, Domestic Licensing of Production and Utilization Facilities.

')

AlChemIE has informed the NRC that applications will be submitted for two facilities: one for the existing Centrifuge Plant' Demonstration Facility (CPDF), located at the Oak Pidge Federal reservation, and one for a new i

facility located near Oak Ridge, Tennessee.

An environmental report for

'l each facility will be submitted with the applications.

The NRC intends i

to prepare environmental assessments of the proposed activities to support

'j the issuance of licenses for the facilities. Since much of the work I

required for preparation of the environmental assessments is common to both facilities, the work is described in one task.

I 2.0 Work Reauired q

The Contractor shall meet with AlChemIE representatives at Oak Ridge, E

Tennessee, for the purpose of discussing the planned environmental reports and visiting the proposed facility locations.

Upon receipt of the applications (and environmental reports), the Contractor shall review the applications and existing related environmental assessments, impact statements and data, and prepare an environmental assessment of each proposed facility.

If environmental information provided l

by the applicant is incomplete or inadequate, the Contractor :. hall prepare.

questions' about the information.for submittal to: the applicant to elicit 3

the necessary additional information. The Contractor' may also need to meet

~

with the applicant to discuss the original or additional information.

(

(

2 This task does not include technical assistance for support of staff participation in an adjudicatory hearing, if one is held, or for prepara-tion of an environmental impact statement, if one should be indicated or l

required.

3.0 Scope of Review Inasmuch as the requirement to prepare an environmental assessment for non-radioactive isotope enrichment plants is unusual, and would otherwise not be an NRC requirement, the scope of review for both subtasks shall be the minimum necessary to comply with the in'.ent of the Council on Environmental Quality (CEQ) and 10 CFR Part 51.

Keeping this in mind, the scope of review shall include the following:

o The need for the proposed action, o

Alternatives as required by Section 102(2)(E) of the National Environmental Policy Act (NEPA),

l o

The environmental impacts, including non-radiological impacts of the proposed action and alternatives as appropriate, o

A list of agencies and persons consulted, and identification of sources used.

l Collection of new environmental data (measurements, information, etc.)

shall not be required.

References shall be use from the applications and existing environmental assessments, impact statements, and data to l

the maximum extent feasible.

Data common to both facilities shall be i

R used for both environmental assessments to the maximum extent feasible.

M gings and Travel 4.0 3

1he Contractor will visit both prospective sites during one visit to Oak Ridge to obtain the information required to perforn' the work required in l

Section 2.0.

The Contractor will meet with the applicant at offices in j

Cak Ridge, Tennessee to discuss the environmental review.

The Contractor may meet with the applicant and with the NRC Project Manager at NRC offices l

in Silver Spring, Maryland, for clarification of information.

l i

5.0 Reports j

i i

Drat t and final task reports suitable for use as environmental assessments shall be as described in Section F Contract No. NRC-02-87-004. Separate -

reports shall be submitted for each environmental assessment. The draft l

report for the CPDF will be due one month after receipt of the environmental i

report accompanying the application. The final report for the CPDF will be due one month after receiving NRC comments on the draft, if any. The draft report for the other facility will be due within three months after receipt of its environmental report. The final report for the other facility will be due two months following NRC comments, if any. Monthly reports shall be j

submitted in accordance with the terms and conditions of the basic contract.

j

(

c

\\

i 3

l 6.0 Level of Effort l

The estimated level of effort to accomplish this tash is six staff-months.

7.0 P_eriod of Performance The completion date for the CPDF environmental assessment is October 15, 1987.,

The completion date for the new facility

{

environmental assessment is January 15, 1988.

8.0 NRC Supplied Information The NRC Pro. ject Manager will provide copies of A1ChemIE's applications, including environmental reports.

The Contractor shall be responsible for obtaining copies of other existing related environmental assessments, impact statements, and data.