n- -

.Q-

. TENNESSEE VALLEY AUTHORITY CH ATTANOOG A. TENNESSEE 374o1 SN 157B Lookout Place AUG 071987 U.S. thelear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of ) Docket Nos. 50-327  !

Tennessee Valley Authority ) 50-328 SEQUOYAH NUCLEAR PLANT (SON) UNITS 1 AND 2 - NRC INSPECTION REPORT NOS.

50-327/87-13 AND 50-328/87-13 By my letter dated June 26, 1987, TVA committed tc call NRC to discuss the milestones for modifications to the control room barrier. Specific actions showing completion of this commitment, related to the subject inspection report, are enclosed.

If you have any questions, please telephone M. R. Harding at 615/870-6422.

To the best of Iny knowledge, I declare the statements contained herein are complete and true.

Very truly yours, TENNESSEE VALLEY AUTHORITY .

1 l

1 R. G diey, Dir ctor Nuclear Safety and Licensing i

Enclosures cc: See page 2 4

8708170421 870007 j PDR ADOCK 05000327 G i PDR ,

\ i i

An Equal Opportunity Employer

t U.S. Nuclear Regulatory Commission. /400 071987 cc (Enclosures) l' Mr. G. G..Zech, Assistant Director

(: .for Inspection Programs Office of Special Projects U.S. Nuclear Regulatory Commission 101 Marietta Street, NW, Suite 2900 l

Atlanta, Georgia 30323 Mr. J. A. Zwolinski, Assistant Director for Projects Division of TVA Projects Office of Special Projects i U.S. Nuclear Regulstory Commission

l. 4350 East West Highway EWW 322 Bethesda. Maryland 20814 Sequoyah Residunt Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road.

Soddy Daisy, Tennessee 37379 t

I t

l l

t

- - - _ - _ - _ _ _ _ _ _ _ _ - i

1 r

ENCLOSURE 1 SEQUOYAH NUCLEAR PLANT (SQN) UNITS 1 AND 2 NRC INSPECTION REPORT MOS. 50-327, -326/87-13  !

During a TVA/NRC meeting on June 1, 1987, it was agreed that TVA would provide NSC with specific schedular information related to the control room barrier modifications discussed in the subject inspection report. 'This commitment, documented by a TVA letter dated June 26, 1987, was completed July 24, 1987.

1 During an announced NRC inspection (50-327, 328/87-53) conducted July 22-24, ,

1987, the specific activities and schedules for the proposed modifications were discussed with the NRC inspector. It was a'groed during the exit meeting on July 24, 1987, that the modifications would be completed on or before October 22, 1987. It is my understanding that NRC concurs with the TVA position that the schedule will not be tied to the unit 2 restart schedule.

This is based on the agreement that the compensatory measures specified in the June 26, 198) TVA letter will continue until modifications are complete and control room barrier modifications will not interfere with unit 2 restart activities.

a j l

l

ENCLOSURE 2 COMMITMENTS

1. Modifications to the control room barrier will be complete on or before October 22, 1987. .
2. Compensatory measures will remain in effect until modifications to the control room barrier are complete.

l l #

i E Y t

l l

1