h:-*'

b C E Comminw cith Edison

'/ $ ;

One First National Plaza, Chicago, Illinois

.k'v Address Reply to: Post Offica Box 767

(

_ Chicago, Illinois 60690 - 0767 1

)

August 10, 1987 1

l Mr. Thomas E. Murley, Director Office of Nuclear Reactor Regulation U.S. Nuclear. Regulatory Commission

)

Washington, DC 20555 l

1 1

i

Subject:

Byron Station. Units 1 and 2 Braidwood. Station Units I and 2 Application for Amendment to Facility Operating' License NPF-37, NPF-66, and NPF-72, Appendix A,' Technical Specifications NRC Docket Nos. 50-454, 50-455, 50-456 & 50-457 Reference (a): July 28, 1987 letter from S. C. Hunsader to j

T. E. Murley, l

I

Dear Mr. Murley:

Reference (a) provided the request to amend Technical Specifications i

3.8.1.1 and 4.8.1.1.2 to clarify how the gradual loading of.the diesel engine is applied to minimize the mechanical stress and wear on the diesel generator.

This letter provides a correction to the wording included in Attachments B and C to reference (a).

I Attachments B and C state, in part:

"...The proposed change clarifies that all surveillance tests, with

.j the exception of the one performed once per 184 days may be preceded j

by warmup procedures and may also include gradual loading as i

recommended by the manufacturer."

j To be consistent-with the' revised footnote to Technical Specification 1

page 3/4 8-3 provided in reference (a), the above wording should be changed to the following:

e 1-

,e ggwyq ?&

'W e

a

s i

Q C.

T. E. Murley 2-August.10, 1987 I

L

...The proposed change clarifies that a'1 surveillance tests, may 1

be preceded by warmup procedures and, with the exception of the one

- performed once per 184 days, may also include gradual loading as recommended by the manufacturer."'

l This information is being prov'ided for your use inconjunction with

-your review of reference (a).

Please direct any questions you may have concerning this matter to this office.

3 Very truly.yours, l

C.

=_=:.

S. C. Hunsader R

Nuclear Licensing Administrator 1m i