4 JOSEPH M. FARLEY NULM PIANT UNIT 1 NARRATIVE SUBNARY OF OPERATIONS July, 1987 There were no unit shutdcwns or significant power reductions during the month of July. 1 The following major safety-related maintenance uns performed in the month of July:

1. Solenoid splices arul motor-operated valve splices that were installed utilizing methods not evaluated by design for environmental qualification were re-terminated in accordance with newly approved EQ terminations on a priority basis. This is still in progress.
2. Control room fire damper 2782BD had new parts installed.
3. Several tube leaks were repaired on the IC CCW heat exchanger.
4. The anchor bolts of the Number 3 service water battery were reworked.
5. Radiation detectors R-2 and R-7 were replaced.
6. Miscellaneous corrective and preventive maintenance was performed on the diesel generators.

}

l l

N 8709030007 870731 PDR ADOCH 05000340 R PDR

[sE Oi

OPERATING DATA REPORT DOCKET NO. 50-364 DATE 8/4/87 COMPLEfED BY J. D. Woodard TELEPHCNE (205)899-5156 OPERATING STA'IUS Notes

1. Unit Name: Joseph M. Farley - Unit 2
2. Reporting Period: July, 1987 1) Cumulative data since
3. Licensed Thermal Power ( Mt): 2,652

~

7-30-81, date of

4. Nameplate Rating (Gross Ne): 860 commercial operation
5. Design Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross M e): 864.9
7. Maximum Dependable Capacity (Net We): 824.1
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Net We): N/A
10. Reasons For Restrictions, If Any: N/A

'Ihis Month Yr-to-Date Cumulative

11. Hours In Reporting Period 744 5,087 52,632
12. Number Of Hours Reactor Was Critical 744 4,729.6 51,085.8
13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
14. Hours Generator On-Line 744.0 4,712.7 45,563.5
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) I T10,667 11,972,772 115,290,762
17. Gross Electrical Energy Generated (MWH) 634,066 3,903,624 37,912,894
18. Net Electrical Energy Generated ( W H) 603,190 3,704,934 35,954,096
19. Unit Service Factor 100.0 92.6 86.6
20. Unit Availability Factor 100.0 92.6 86.6
21. Unit Capacity Factor (Using MDC Net) 98.4 88.4 83.9
22. Unit Capacity Factor (Using DER Net) 97.8 87.9 82.4
23. Unit Forced Outage Rate 0.0 7.4 4.7
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling / Maintenance outage, 10/2/87, approximately eight weeks

25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 05/06/81 05/08/81 INITIAL ELECTRICITY 05/24/81 05/25/81 COMMERCIAL OPERATION 08/01/81 07/30/81 Form 2/30 1

_ _ _ _ _ _ -1

DOCKET NO. 50-348 1

. UNIT DAH Aunust 5, 1987 COMPLEED BY J. D. W d rd O -

TF1 rPHCNE (205) 899-5156 310ffTil Julv /

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (51We-Net) .

(MWe-Net) g 807 37 812 2 807 13 813

~

y ~~~807~- ----- - - - --

g9-. 815

~

4 807 7g 813

$ 806 _ n 809 6 W ,

22 nnr, 806 g 803 7 ,

g 806 74 804 9 804 25- 805 10 804 ,j 806

!! 804 27 807 l

1 g3 802 805 3

33 802 h

- 803 g 802 30 803 g5 R06 33 803 16 810

(?tSTRUGONS On this form::. list the 2venge d:ity unit power !cvelin AtWc tiet for esch d:y in the reporting snunth. Compute io

, the ne:rct whole meg: watt, (9/77)

O l

F W8 0 t e 5 . s .) s e nta nF si M uD5g 0 oa ec

. u . 2 i D i t

J AJ( e e c l

v c u

u tr ftE oi s n fo a

c c Ol.EEyE e ori no i NnTgNA A) O r

e u iis t t ruic . a e e T N DtE H E Cne i iH Gsah K T T P &t ct t pS I E E eAn

. ies b y CN L L s e Y iPs n1 h ie OU P TE u v L x r n

D l a c U EfEE0 o b C a

O P J C F 0 4 l

i T

N O

M E

l i

T S

N G N

0 1 I 1 iu R .

_ C gg U D

m a

U ~

r D S ci St E N R )  : la l a y I duu o

_ R l T o ann E u v,?o C ha ut W J [gm U eAMA t l M123 O D O P

)

I N

N l

i 1

E R

t 3

A E

_ S O e # W

_ l O

_ N h e s t t P

W n ns

_ T e e v op

_ O R c T D O i_ E e R

N A

T P l C

_ H E I

l i

R F

_ S I T  :

N I

-.E}cg5 o t G I

Es@

_ S U )

n wj2U R ia I

O l p

m S

N E

}ge s W (t e e s O

_ 1 D

lrT if u

U a o H F e

_ ggE S t c

_ nn jga T ea g mne

_ I N  : pt el l

l ni o uif n g s qa l e

. ,gH O N

aEkR e - -

RAnCD

~

R 2 E

W E

te R a

D E O T d e

d lu ed c e rb o c o.

FS N FS:

I

JOSEPil M. FARLEi hECLEAR PIANT UNIT 1 NARRATIVE SibMARY OF OPERATIONS July, 1987 There were no unit shutdowns or significant power reductions during the month of July.

The following major safety-related maintenance was performed in the month of July:

l 1. Solenoid splices and motor-operated valve splices that were installed utilizing methods not evaluated by design for environmental qualification were re-terminated in accordance with newly approved EQ terminations on a priority basis. This is still in progress.

2. Control room fire damper 2782BD had new parts installed.
3. Several tube leaks were repaired on the 1C CCW heat exchanger.
1. The anchor bolts of the Number 3 service water battery were reworked.
5. Radiation detectors R-2 and R-7 were replaced.
6. Miscellaneous corrective and preventive maintenance was performed on the diesel generators.

l

OPERATING DATA REFORT DOCKET No. 50-348 DATE 8/4/87 COMPLETED BY J. D. Woodard TELEPHONE (205)899-5156 OPERATING STARIS Notes

1. Unit Name: Joseph M. Farley - Unit 1
2. Reporting Period: July, 1987 1) Cumulative data since
3. Licensed Thermal Power (MWt): 2,652 12-1-77, date of
4. Nameplate Rating (Gross MWe): 860 commercial operation
5. Design Electrical Rating (Met MWe): 829
6. Maximam Dependable Capacity (Gross Pfde): 856.0
7. Maximum Dependable Capacity (Net MNe): 825.1
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A l

9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions, If Any: N/A

'Ihis Month Yr-to-Date Cumulative

11. Hours In Reporting Feriod 744 5,087 84,719
12. Number Of Hours Reactor Was Critical 744.0 4,836.3 61,745.8
13. Reactor Reserve Shutdown Hours 0.0 0.0 3,650.0
14. Hours Generator On-Line 744.0 4,774.3 60,396.7
15. Unit Reserve Shutdown Hours 0.0 0.0 0.D~
16. Gross Thermal Energy Generated (&H) 1,973,035 12,480,288 153,807,956
17. Gross Electrical Energy Generated (PEH) 630,744 4,046,964 49,410,008
18. Net Electrical Energy Generated (%H) 599,826 3,836,924 46,561,258
19. Unit Service Factor 100.T- 93.9 71.3
20. Unit Availability Factor 100.0 93.9- 71.3
21. Unit Capacity Factor (Using MDC Net) 97.7 91.4 68.3
22. Unit Capacity Factor (Using DER Net) 9 7. T- 91.0 66.3 l l 23. Unit Forced Outage Rate 0.0 1.6 9.9 l 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A

25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY 08/06M7 08/09M7 INITIAL ELECTRICITY 08/20M7 08,'18M 7 COMMERCIAL OPERATION 12/0147 12/01M 7 1

l Form 2/34

)

I

DOCKET NO. 50-348 UNIT I DAIT. Aucust 5, 1987

]

C05fPLETED BY J. D. Woodard TT.LEPHONE (205) 899-5156

.%t0NT11 3 " h' '

DAY AVERAGE DAILY FOWER LEVEL DAY AVERACE DAILY POWER LEVEL

($1We Net) (31We Net) 807 812 g 37 2 807 13 813

~~'807 - - - - - - -

g9 815 3

4 807 ;g 813 806 21 809 5

l 6 00' 22 90A 806 g 803 7 _

g 806 ;4 804 _

7 805 23' 805 804 806 10 26

))

804 3 807 g .,

802 ,. 805 i

l 13 802 ;9 803 l

14 802 30 803 j 15 806 31 803 ,

OIO 16 l'GTTrCCDONS On ilus form:1. list the :venge daily unit power levet in AtWe-Net for e:ch ey in the reporting month. Campute to

, thC nearc t whuie megawatt.

(9/77) l

F W8 e 0 t s

e 5 . s .)

nta nF s

M uD5 oa e g 0 c J A

. u I, (

2 e e iDil t

c f1 v c u o n i - tr na m s' t

e s c

O.EEYE MTliN e

s s torsu it t t N A A . ar ee DO oic C na e Gah T

E ND Ei l

iR pS K T T P &t t it e I E E eAn t

. b r yt iPin1 CN L L s e Y L h x ro t O P E D U u v a c U MT C P a

J EfEE0 O

C F 4 0

l Ti N

O M

C I

I T

S N G N

O I I

T 3o R .

C -

U m a

U - a D r

) ci S

I E N  : la la S

R )

v I do uu R

E l

v, ?u T h a nn a u u C W I. [gm U teMM - - - -

O E D M123 P ,

t

) f ,

I l 3 N i R

A N E S O e # W O

N M P e tn s

n t

s W T e e v p o

T O R kE e N D O L R A 1 P C u E I li R F S I T c G

?

NI "

i o 6 I U

$y5 S )

1 n

c,j R i

a O

lp x

S E Ec N (t

}g W O e es r

D i

luT f U' F iao H e Eg$ c S tnn ea j3$ T mn I el N  :

ninu pt i o uif s qa e

,QF O aEMI e - -

N RA1 C 1 R 2 E

W e E t

a R E

D H

?T d s.Y - a P

_ J, d leu

't ed rc he o c s

FS

o.  :

N FS:

i

Mailing Address Alabama Power Company 600 North 18th Street Post Office Box 2fA1 Birmingham. Alatiama 35291 -

Telept.one 205 7834090 R. P. Mcdonald Sun or Vice President Fhntndge Butiding g ()

August 13, 1987 i

l Docket No. 50-348 l

l Director, Office of Resource Management V. S. Nuclear Regulatory Commission Washi ngton, D.C. 20555

Dear Sir:

1

! RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies of the July 1987 Monthly Operating Report for Joseph M. Farley Nuclear Plant Unit 1, required by Section 6.9.1.10 of the Technical Specifications.

l If you have any questions, please advise.

Yours very ruly,,

( L ],-

R. P. McDonal d 1

RPM /BCE:mab/F-2 1 Enclosures xt: Director, IE (10 copies)

Director, R11 (1 copy)

I 1

d w/h) \

/ T