Responds to Re Meeting Scheduled on 870814 W/Util to Acquaint NRC of Technical Details Associated W/Proposed Demonstration Program for Consolidating Spent Fuel at Plant. Requests That Meeting Site Be Switched to St Paul,Mn Denied
ML20237F990
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 08/06/1987
From: Wigginton D
Office of Nuclear Reactor Regulation
To: Donna Anderson
MINNESOTA INSTITUTE OF CONCERN FOR PUBLIC HEALTH
References
NUDOCS 8708130264
Download: ML20237F990 (2)


Text

_

AUG 0D 1987 Docket Nos. 50-282 and 50-306 Mr. Dick Anderson DISTRIBUTION:

Minnesota Institute of Concern Docket. Files =

PKreutzer for Public Health DWigginton DMossburg, PMAS HCR84 Box 13978 GHolahan NRC PDR Walker, Minnesota 56484 DDilanni Local PDR OGC-Bethesda

Dear Mr. Anderson:

Thank you for your letter of July 27, 1987 regarding the meeting scheduled on Friday, August 14, 1987, with Northern States Power Company (the licensee). The meeting will serve to acquaint the NRC of the technical details associated with a proposed demonstration program for consolidating the spent fuel at the Prairie Island Nuclear Generating Plant. The meeting was requested by the licensee to inform the NRC of the planning phase of the demonstration program. A copy of the meeting notice with attached agenda is enclosed.

In regard to a change of the meeting place from Bethesda, Maryland, to St. Paul, Minnesota, we are unable to meet this request at this time i

because of time and budget constraints. We articipate the meeting will cover highly technical details (i.e., structural and system analysis, physics, etc.) related to the spent fuel rod consolidation program and that a large complement of the NRC staff will be involved. This issue is being treated in the same manner as other licensing issues with potential safety implications. We plan to place all of the licensee's preliminary submittals, meeting handouts, and the meeting summary on the Prairie Island docket, thus making all the information received by NRC regarding this matter available to the general public at the NRC public document room located in Washington, DC and the local public document room in the Environmental Conservation Library, Minneapolis Public Library, 300 Nicollet Mall, Minneapolis, Minnesota.

Since you expressed interest in this matter, we will furnish you with a copy of all information received by NRC including meeting summaries.

In the meantime, if you have further questions, feel free to contact the Prairie Island Project M6 nager, Dominic C. Dilanni (301-492-7743).

Sincerely, 8708130264 070 Bob ADOCK0500g2 David L. Wigginton, Acting Director PDR P

Project Directorate III-3 Division of Reactor Projects Office of Nuclear Reactor Regulation

Enclosure:

As stated cc: See next page h

Office:

LA/PDIII-3 PM/PDIII-3 PD/ DIII-3 Surname:

PKTfther DDilanni/tg DWigginton Date:

08/g/87 08/6 /87 08/(,/87

F 1

1 Mr. D. M. Musolf Prairie Island Nuclear' Generating Northern States Power Company Plant cc:

Gerald Charnoff, Esq.

Mr. R. Anderson Shaw, Pittman, Potts and Trowbridge Minnesota Institute of Concern 2300 N Street, N.W.

for Public Health Washington, OC 20037 hCR 84 PO Box 13978 Walker, Minnesota 56484 Dr. J. W. Ferman Mr. C. Laszewski Minnesota Pollution Control Agency St. Paul Pioneer Press 520 Lafayette Road 345 Cedar Street St. Paul, MN 55155 St. Paul, Minnesota 55104 Mr. E. L. Watzl, Plant Manager Joseph Campbell, Sr.

Prairie Island Nuclear Generating Plant Prairie Island Cosuunity Council Northern States Power Company 5750 Sturgeon Lake Rd.

Route 2 Welch, MN 55089 Welch, Minnesota 55089 Jocelyn F. Olson, Esq.

Special Assistant Attorney General i

Minnesota Pollution Control Agency i

1935 W. County Road, B2

~

Roseville, Minnesota 55113

}

U.S. Nuclear Regulatory concission Resident Inspector's Office 1719 Wakorade Drive East i

Welch, Minnesota 55089 1

(

Regional Adef.tistratcr Region III I

~

U.S. Nuclear Regulatory Cournission Office of Executive Director for Operations 799 Roosevelt Road Glen Ellyn, Illinois 60137 Mr. William Miller, Auditor l

Goodhue County Courthouse Red Wing, Minnesota 55066

T 6

s e

}2 ~.

UNITEDsTATES NUCLEAR REGULATORY COMMISSION i

suAaHWSTON.O. C,30555 JUL 2 71987 Docket No. 50-282 and 50-306 MEMORANDUM FOR:

David L. Wigginton, Acting Director PW ject Directorate III-3 Division cf Reactor Projects FRON:

Dominic C. D11 anni. Project Manager ProjectDirectorateIII-3 Division of Reactor Projects

SUBJECT:

FORTHCONIM MEETING WITH NORTHERN STATES POWER C0i4PANY REGARDIM TE DEMONSTRATION OF SPENT FUEL R00 CONSOLIDATION PROGRAM 3

DATE'& TIME:

August 14, 1987 8:00 AM - 5:00 PM LOCATION:

Room P-114, Phillips Bldg.

Bethesda, MD J

PURPOSE:

Northern States Power Cospany will describe a proposed demonstration program for spent fuel rod consolidation for the spent fuel assemblies existing at the Prairie Island Nuclear Generating Plant. The meeting has been requested by the licensee for the purpose of keeping the RC informed on the planning phase of the demonstration program gad a copy of the meeting agenda is encloseds participants:

NRC NSP Hansraj Ashar Laura McCarten Dick Clark Tom Parker Tim Collins

' Dom:Dilannia.

Dave'Jeng Westinghouse Nu Tech Elmer Bassler Dr. J. K. Smith Bill Boyd Wayne Henniger Bob Laubhas

)

h w. (, }l9%- J 1,

,a Dominic C. D11 anni Project Manager

$ q fNdO.2-i u

Project Directorate III-3

)

~

Division of Rea r Projects t

23I.

\\

Meetings between 85tc technical staff and ::"<.)---._. L cs are open fo@ interested ass 6ers of the public, petitioners interveners, or other

{

tes to attend.as absorvers to Nesting Statement.sf.IItC

,... [

M -t w Y ' S N'

I

l i

1 NSP/NRCINFORMATIONALMEETIN(ON PRAIRIE ISLAND SPENT FUEL ROD CONSOL10ATION PROGRAM l

DATE: AUGUST 14, 1987 TIME: 8:00 AH LOCATION: Room P-114. Phillips Bldg.

4 I.

Introduction Tom Parker NSP

{

l II. Project Overview Laura McCarten NSP.

III. Process Description Elmer Bassler W

l IV. Analysis Criticality Bill Boyd W

Thermal-Hydraulic Bob Laubham W

1 Accident Wayne Henniger W

Structural Dr. J. K. Smith NUTECH

~

V.

Conclusion Laura McCarten NSP l

i

+

4 h

9 I

l 1