ML20237F808
| ML20237F808 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 08/25/1987 |
| From: | Allen C COMMONWEALTH EDISON CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| Shared Package | |
| ML20237F811 | List: |
| References | |
| 3483K, NUDOCS 8709010427 | |
| Download: ML20237F808 (2) | |
Text
_
Commonwealth Edison O
One First National Plaza. Chicago, Illinois O
33ress Reply to: Post Office BcWT-Chicago, Illinois 60690 0767 August 25, 1987 U.S. Nuclear Regulatory Commission Attn: Document Control Desk washington, DC 20555
Subject:
LaSalle County Station Units 1 and 2 Proposed Amendment to Technical Specifications for Facility Operating License NPF-ll - Shutdown Cooling Isolation Valve NRC Docket Nos. 50-373 and 50-374 References (a):
Federal Resister Volume 51, No. 44 dated Thursday, March 6, 1986.
Dear Sir:
Pursuant to 10 CFR S0.90 Commonwealth Edison (CECO) proposes to amend Facility Operating License NPF-ll.
This amendment is being submitted for your staff's review and approval and is in accordance with reference (a).
The amendment requested changes the identification of the compartment in which the normal and emergency supply breakers for the Shutdown Cooling Isolation Valve (IE12 F0009) are located. This change was required because CECO has replaced the motor operator with one of the larger capacity to increase the reliability of the valve. The new, larger capacity operator requires the use of larger capacity breakers which will not fit into the existing cubicles. The replacement breakers will be installed in larger compartments within the same Motor conirol Center (MCC's) as the originals.
This change is purely administrative in nat-correct the identification of these new cubicle locations.
Attachment A provides the changes to be made to the Facility License. Commonwealth Edison has reviewed this document and finds that no significant hazards exist. This review is documented in Attachment B.
We request approval for this change as soon as possible as the plant has already been physically modified.
The effective date would be 15 days following issuance.
\\
8709010427 870825 PDR ADOCK 05000373
,)
J P
PDR htC, c h
a l
USNRC August 25, 1987 Commonwealth Edison is notifying the State of Illinois of our request for this amendment by transmitting a copy of this letter and attachments to the designated state official.
I In accordance with 10 CFR 170, a fee remittance in the amount of
$150.00 is also enclosed.
If you have any additional questions regarding this matter, please contact this office.
Very truly yours, G41af C. M. Allen Nuclear Licensing Administrator 1m l
l Attachments cc: Paul Shemanski - NRR Regional Administrator - RIII NRC Resident Inspector - LSCS M. C. Parker - IDNS i
l SUBSCRIBED and SWORN to before me this J/ WL day
/
of OunLLfD 1981
/
7 pgit b k. $
L Lu$)
Notary Public l
l J
3483K l
_ _ _ - _ _