Responds to NRC Re Open Item Noted in Insp Rept 50-483/87-17.Corrective Actions:Procedure EIP-ZZ-00224 Will Be Revised to Ensure That Medical Emergency Response Team (Mert) Has Mert Contamination Control Kit Available
ML20237F704
Person / Time
Site: Callaway Ameren icon.png
Issue date: 08/11/1987
From: Schnell D
UNION ELECTRIC CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
ULNRC-1573, NUDOCS 8708130134
Download: ML20237F704 (2)


Text

s

,p.

7 Etscraic yg,og m

1901 Gratiot Street, St. Louis Donald F. Schnell Vce Ptsident August 11, 1987 U.S. Nuclear Regulatory. Commission Document Control Desk Washington, D.C..

20555 ULNRC-1573 Gentlemen:

INSPECTION REPORT NO. 50-483/87017 1

This responds to Mr. W. D.

Shafer's letter dated June 30, 1987 which transmitted the report of the inspection conducted at Callaway Plant during the period June 2 through 4, 1987.

Our response to the exercise weakness identified is presented below.

None of the material in this response is considered proprie-tary by Union Electric Company.

(50-483/87017-01) OPEN ITEM (Exercise Weakness)

The Medical Emergency. Response Team (MERT) adequately demonstrated their capability to assess the extent of the man's injuries and adequately administered first aid.

However, the coordinated effort of the MERT and the HP technician to adequately demonstrate a meaningful, disci-plined response for a contaminated injured man was unsstis-factory and did not comply with EIP-ZZ-00224.

Response

Corrective Actions Taken or Planned To Be Taken 1

o Procedure EIP-ZZ-00224, Injury or Illness for Callaway Plant, vill be revised to ensure that the Medical Emergency Response Team (MERT) has available a llERT Contamination Control kit when responding to an injury outside the RCA involving actual or suspected contami-nation.

\\

8708130134 870811 60 f)/ V }{}

PDR ADOCK 05000403 V

G PDR l

s Maing Address: P.O. Box 149, St. Louis, MO 63166 J

I.

i ULNRC-157 3

)

Page 2 of 2 i

i o

The plant emergency vehicle will be supplied with a MERT Contamination Control kit and will be available for use outside the power block.

o Coordination of activities that involve the use of f

MERT, Fire Brigade, Health Physics and other affected

{

personnel will be added as a topic to the training j

provided for MERT Leaders.

(T68.1140.6)

{

o Increased emphasis will be placed on contamination control techniques for medical emergencies in Health Physics Technician training.

(T68.1050.6)

Estimated Date When Corrective Actions Will Be Achieved The procedure revision, placement of the additional MERT Contamination Control kit and upgrade of training courses should be completed by December 31, 1987.

If you have any qLestions regarding this response or if additional information is required, please contact Mr. Milton A.

Stiller.

Very truly yours, y

Donald F.

Schnell cc:

A. B. Davis - Regional Administrator, Region III W.

D. Shafer - Chief Emergency Preparedness and Radiological Protection Branch W. L. Forney - Chief, Reactor Projects, Section lA Tom Alexion - Licensing Project Manager (2 Copies)

B. H. Little - NRC Senior Resident Inspector B.

J. Washburn - Manager, Utility operations, Missouri

)

Public Service Commission r