Forwards Schedule for Submittal of Program to Meet Intent of 10CFR50,App J in Area of Valve Stem Packing
ML20237F686
Person / Time
Site: Peach Bottom  
Issue date: 08/07/1987
From: Alden W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Martin R
Office of Nuclear Reactor Regulation
References
NUDOCS 8708130128
Download: ML20237F686 (2)


Text

_.

l, a

1 PH ILAD E LPHI A-ELECTRIC ' CO M PANY l

s 23ol MARKET STREET P.O. BOX 8699 l

PHILADELPHIA A PA.19101 1215)841 4000 August 7, 1987 J

Docket Nos., 50-277 50-278 l

I Mr. Robert E. Martin Project' Manager Project Directorate I-2 Division of Reactor Projects I/II i

U.S. Nuclear Regulatory Commission l

Attn: Document Control Desk

~

Washington, D.C.

20555

Dear Bob:

In our meeting of July 30, 1987, we committed to providing you with a. schedule for our submittal of our program to meet the intent of 10 CFR 50 Appendix J in the area of valve stem packing.

Our schedule for this work is attached.

I Very truly yours, W. M. Alden Engineer-In-Charge l

Licensing Section cc:

Addressee 0lf l

l i l.\\\\

i 8708130128 B70807 PDR ADOCK 05000277 p

PDR

~.

7, 3

i PROGRN4 FOR APPENDIX J TESTING OF l'

. VALVES WITH PACKING EXPOSED TO PRib%RY CONTAltNENT SCHEDULE FOR SUBMITTAL OF PROGRAM TO NRC

,e

- Ac t. l v l t y '

Completlon'Date g sponsible Party f.

1.

Prepare list of. valves 8/28/87 (UM.E. Division"

-that are outside containment'

,., t/

but that functton as inboard

.]

Isolation valves.

i l

.2.

Identify those valves with 8/28/87 M.Ej Division:'

packing exposed to primary containment that are not Type C tested.

l

/

'3.

Develop an action plan for 9/30/87 M.E. Division and:

l addressing Appendix J Nuclear Operations t'

requirements for each of the (Test Engineers)

Item 2 valves.

4.

Prepare a draft response to NRC, '\\i0/16/87 M.E. Divislon

. with a sunmary of the program /

i s

action plan for all Item 2 valves.

S.

Have the draft response. reviewed 10/30/87 Nuclear Operations and. approved by PORC.

(Licensing Section)MM q

6; Have the draft response reviewed 11/5/87 Nuclear Operations and' approved by NRB.

(Licensing Section)MM 7.

Submit the response to the NRC.

11/20/87 Nuclear Operations Licensing Section) l l

With-support from Nuclear Operations (Tdst Engineers)

M MM With support from M.E. DIvlsion i

\\

L

{

1^

JFOR/cmv/08068705