Forwards Insp Rept 50-346/98-13 on 980623-0807.No Violations Noted.Conduct of Activities at Davis-Besse Facility Was Characterized by safety-conscious Operations & Conservative decision-making
ML20237F238
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/25/1998
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jeffery Wood
CENTERIOR ENERGY
Shared Package
ML20237F240 List:
References
50-346-98-13, NUDOCS 9809020147
Download: ML20237F238 (2)


See also: IR 05000346/1998013

Text

.

August 25, 1998

-

Mr. John K. Wood

~ Vice President - Nuclear

Davis-Besse Nuclear Power Station

Centerior Service Company

5501 North State Route 2

!

Oak Harbor, OH 43449

I

SUBJECT:

. DAVIS-BESSE INSPECTION REPORT 50-346/98013(DRP)

Dear Mr. Wood:

On August 7,1998, the NRC completed an inspection at your Cavis-Besse site. The enclosed

report presents the results of that inspection.

During the 6-week period covered by this inspection report, your conduct of activities at the

Davis-Besse facility was characterized by safety-conscious operations and conservative

decision-making. Your staff was challenged throughout the inspection period and generally

performed very well. At the beginning of the period, operators reacted conservatively and

efficiently by ensuring the plant was in a stable condition following a loss of offsite power caused

by a tomado which touched down in the vicinity of the plant. Conservative decisions delaying

reactor restart and then to shut down the reactor on two occasions were made to reduce

secondary system sulfate levels. Although some operator performance issues conceming

. attention-to-detail during the reactor restarts are noted in the report, operators generally

performed very well during the reactor restarts and shutdowns.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosures will be placed in the NRC Public Document Room.

Sincerely,

/s/ G. E. Grant

Geoffrey E. Grant, Director

Division of Reactor Projects

f

Docket No.: 50-346

j

License No.: NPF-3

l-

1

,.

Enclosure:-

Inspection Report 50-346/98013(DRP)

DOCUMENT NAME: g:\\davi\\dav98013.drp

' To receive e easy of 9ds docusment. Ine6 cess in me bos "C" * Copy without attactWonci"f" * Copy wetti sitectWenci "N" * No cop!'

OFFICE

Rill

Rlli

Rlli

l

NAME-

DuPont:$

Kozak ME

Grant C[.9)[

DATE

08/v198

08/W/98

08f[/98

O

OFFICIAL RECORD COPY

9909020147 990825

PDR

ADOCK 05000346

G

PM

,

-

_ - _ _ _ , _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ - _ _ _ _ _ _ - _ _ - _ _ -

.

J. Wood

-2-

cc w/ encl:

J. Stetz, Senior Vice President - Nuclear

J. Lash, Plant Manager

J. Freels, Manager, Regulatory Affairs

M. O'Reilly, FirstEnergy

State Liaison Officer, State of Ohio

R. Owen, Ohio Department of Health

C. Glazer, State of Ohio Public

Utilities Commission

Distribution:

Project Mgr., NRR w/enci

- J. Caldwell, Rill w/enct

C. Pederson, Rlli w/enci

B. Clayton, Rill w/enct

SRI Davis-Besse w/ encl

DRP w/enci

TSS w/enci

DRS (2) w/enct '

Rlli PRR w/enct

PUBLIC IE-01 w/enci

Docket File w/enci '

GREENS

LEO (E-Mail)

DOCDESK (E-Mail)

i

i

l

20005

t

r

_