Forwards Insp Repts 50-456/98-09 & 50-457/98-09 on 980609-0727.Non-cited Violation Noted Re Failure of non-licensed Operators & Work Ctr Supervisor to Identify That Specific Gravity in Battery Did Not Meet TS Criteria
ML20237F233
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 08/25/1998
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kingsley O
COMMONWEALTH EDISON CO.
Shared Package
ML20237F234 List:
References
50-456-98-09, 50-456-98-9, 50-457-98-09, 50-457-98-9, NUDOCS 9809020144
Download: ML20237F233 (4)


See also: IR 05000456/1998009

Text

. _ _ _ - - _

_ - - __ ____ _ _-__

- - _ _ - _ - _ _ _ _ - _ _ _ _ - _ _

_ - _-_ _ _ _ - - - - _ _ - - _ -

e

.-

August 25, 1998-

' Mr. Oliver D. Kingsley

President, Nuclear Generation Group

Commonwealth Edison Company

ATTN: Regulatory Services

Executive Towers West til

1400 Opus Place, Suite 500

Downers Grove,IL 60515

SUBJECT:

BRAIDWOOD INSPECTION REPORT 50-456/98009(DRP); 50-457/98009(DRP)

Dear Mr. Kingsley:

' On July 27,' 1998, the NRC completed an inspection at your Braidwood Units 1 and 2 reactor

facilities. The enclosed report presents the results of that inspection. During the 7 weeks

. covered by this inspection period, your conduct of activities was generally characterized by

safety-conscious operations, sound engineering and maintenance practices, and careful

radiological work controls.

Two non-cited violations are discussed in this report. The first non-cited violation involved an

event wherein a system engineer identified that non-licensed operators and a work center

supervisor failed to identify that specific gravity on a safety-related battery did not meet the

acceptance criteria identified in the. Technical Specification. The second non-cited violation

- involved an identified event where two fire watch personnel documented the performance of

hourly fire watch inspections of the upper cable spreading room, but later your staff reviewed

security records and determined they did not actually perform the inspections,

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and the

enclosure will be placed in the NRC Public Document Room.

Sincerely,

/s/ M. L. Dapas for

Geoffrey E. Grant, Director

Division of Reactor Projects

Docket Nos.: 50-456; 50-457

License Nos.: NPF-72; NPF-77

..

Enclosure:

Inspection Report 50-456/98009(DRP);

50-457/98009(DRP)

See Previous Concurrence

DOCUMENT NAME: G\\BRAl\\ BRA 98009.DRP

To seesive a copy of thle stocunient,insecate in the box *C" = Copy without attmehment/enclosuse 'E' = Copy with attachment / enclosure

,e = o ..o.

OFFICE

Rill

l

Rill

l

Rlll

l

Rlil

l

Rlli

l

NAME

Tongue:ml

Gardner

Jacobson

Jordan

GrantblTf r

DATE

08/ /98

08/ /98

08/ /98

08/ /98

08L:5f98

OFFICIAL RECORD COPY

9909020144 980825

PDR

ADOCK 05000454.

G

PDR

- _ _ _ _ - _ _ _ _ _ _ _

-_

_ - _ - _ _ _ - _ - _ _ _ - _ _ - _ _ -

.s,

g.

O. Kingsley

-2-

cc w/ encl:

M. Wallace, Senior Vice President

D. Helwig, Senior Vice President

' G. Stanley, PWR Vice President

J. Perry, BWR Vice President

D. Farrar, Regulatory Services Manager

I; Johnson, Licensing Director

l

DCD - Licensing

l

T. Tulon, Site Vice President

i

K. Schwartz, Station Manager

l

T. Simpkin, Regulatory Assurance Supervisor

R. Hubbard, MHB Technical Associates

,

l

N. Schloss, Economist

Office of the Attomey General

l

State Liaison Officer

i

Chairman, Illinois Commerce Commission

{

Distribution:

f

!

l-

SAR (E-Mail)

1

Project Mgr., NRR w/enci

J. Caldwell, Rlll w/enci

C. Pederson, Rlli w/enci

q

B. Clayton, Rlli w/enci

SRI Braidwood w/ encl

DRP w/enci

,

TSS w/enct

l

DRS (2) w/enct

L

Rlli PRR w/ encl

PUBLIC IE-01 w/enci

i

Docket File w/enci

GREENS

IEO (E-Mail)

DOCDESK (E-Mail)

i

t

i

'

4

i

o

l

-

,.

^

,,u..

)

J

l

,

.

.

. Mr. Oliver D. Kingsley

President, Nuclear Generation Group

Commonwealth Edison Company

- ATTN: Regulatory Services

Executive Towers West lli

'1400 Opus Place, Suite 500 -

Do,vners Grove,IL 60515

SUBJECT:

BRAIDWOOD INSPECTION REPORT 50-456/98009(DRP); 50-457/98009(DRP)

Dear Mr. Kingsley:

On July 27,1998, the NRC completed an inspection at your Braidwood Units 1 and 2 reactor

facilities.' The enclosed report presents the results of that inspection. During the 7 weeks

covered by this inspection period, your conduct of activities was generally characterized by

. safe:p conscious ooerations, sound engineering and maintenance practices, and careful

radiologicd' work controls.

Two non-cited vhlations are discussed in this report. The first non-cited violation involved an

event wherein a s/ stem engineer identified that non-licensed operators and a work center

supervisor failed to Mentify that specific gravity on a safety-related battery did not meet the

acceptance criteria lo0ntified in the Technical Specification. The second non-cited violation

involved an identified ev ant where two fire watch personnel documented the performance of

hourly fire watch inspectio,'s of the upper cable spreading room, but later your staff reviewed

security records and determi.ied they did not actually perform the inspections.

'

l-

In accordance with 10 CFR 2.700 of the NRC's " Rules of Practice," a copy of this letter and the

enclosure will be placed in the NRC Public Document Roem.

Encerely,

l

!

3eoffre) E. Grant, Director

Di.!? on of Reactor Projects

i

Docket Nos.: 50-456;50-457-

License Nos.: NPF-72; NPF-77

Enclosure:

Inspection Repost 50-456/98009(DRP);

_

. 50-457/98009(DRP)

See Previous Concurrence

DOCUMENT NAME: G\\BRAl\\ BRA 98009.DRP

T.

i . n .e ** 4

m, h.a.m. in ei. h.s c . c.n whh.m mi h u i

r - c.n whh .ti

h i/ i

u . u.

,

I)FFICE

Rlli

Rlli

l

Rlli

l

Rlll

j6 Rill

l

NAME

Tongue @ L

Gardner

Jacobson

Jordan #f)? W/

Grant

DATE

08/11/98

-

08/ /98

08/ /98

08//7/98 N

08/ /98

OFFICIAL RECORD COPY

- ,

)

.

!

Mr. Oliver D. Kingsley -

'

- President, Nuclear Generation Group

Commonwealth Edison Company

ATTN: Regulatory Services

Executive Towers West 111 -

- 1400 Opus Place, Suite 500

Downers Grove, IL 60515

SUBJECT:

BRAIDWOOD INSPECTION REPORT 50-456/98009(DRP); 50-457/98009(DRP)

Dear Mr. Kingsley:

On July 27,1998, the NRC completed an inspection at your Braidwood Units 1 and 2 reactor

L

facilities. The enclosed report presents the results of that inspection. During the 7 weeks

l '

- covered by this inspection period, your conduct of activities was generally characterized by

safety-conscious operations, sound engineering and maintenance practices, and careful

radiological work controls.

L

Two non-cited violations are discussed in this report.- The first non-cited violation involved an

event wherein a system engineer identified that non-licensed operators and a work center

i

supervisor failed to identify that specific gravity on a safety-related battery did not meet the

L

acceptance criteria identified in the Technical Specification. The second non-cited violation

,

involved an identified event where two fire watch personnel documented the performance of

hourly fire watch inspections of the upper cable spreading room, but was later identified by

r

security records, did not actually perform the inspections.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and the

enclosure will be placed in the NRC Public Document Room.

Sincerely,

Geoffrey E. Grant, Director

Division of Reactor Projects

Docket Nos.: 50-456,50-457-

.

License Nos.: NPF-72; NPF-77

L

L

Enclosure:

' Inspection Report 50-456/98009(DRP);

!.

50-457/98009(DRP)

'

DOCUMENT NAME: G\\BRAl\\ BRA 98009.DRP

v.

h . . m .e ei. 4

m.h.e.m.i. m. h.

c - cm .m

.n h u i

r - cm im .n h.n u i

m - m.

OFFICE -

Rlli

is

Rill

. l

Rill

1l

Rlli

l

Rill

l

NAME

Tongue: M!L Gardner M

Jacob (onT

Jordan

Grant

DATE

08/h/98

08/$/98

'

08/0 /k8 I

08/ /98

08/ /98

OFFICIAL RECORbCOPY