Forwards fitness-for-duty Program Performance Data Sheets for Period Covering 980101-0630,per 10CFR26.71(d)
ML20237E787
Person / Time
Site: Pilgrim
Issue date: 08/26/1998
From: Alexander J
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BECO-2.98.114, NUDOCS 9809010174
Download: ML20237E787 (3)


Text

_ - _ _ _ _ _ _ _ _ _ _

10CFR26.71(d) aceton Edlieon Pilgrim Nuclear Power Station Rocky Hill Road j

Plymouth, Massachusetts 02360-5599 August 26,1998 BECo Ltr. #2.98.114

(

U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Docket No. 50-293 License No. DPR-35 Submittal of Fitness-For-Duty Proaram Performance Data for Pilarim Nuclear Power Station The enclosed Fitness-For-Duty Program performance data sheets are submitted in accordance with 10CFR26.71(d). This submittal contains data for the period January 1,1998, through June 30,1998.

Please contact me if you have any questions or comments regarding the enclosed su mittal.

e de Regulatory R lations Group Manager MTUdeg 298114/ letters 2 Attachments cc:

Mr. Alan B. Wang, Project Manager Project Directorate 1-3 Office of Nuclear Reactor Regulation Mail Stop: OWFN 14B20 U. S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike Rockville, MD 20852 i

U. S. Nuclear Regulatory Commission

)

l Region I l

475 Allendale Road King of Prussia, PA 19406 l

f

,. o E [

,\\

l Senior Resident inspector Pilgrim Nuclear Power Station y

9809010174 980826 PDR ADOCK 05000293 R

PDR

I 1

J i

& Boston Edison 800 Boylston Street 4

Boston, Massachusetts 02199 Paul A. Keefe, MD 617-424-2372 July 29,1998 l

l 1

Fitness For Duty Performance Data Summary of Management Actions Six Month Period Ending June 30,1998 l

During the first six months of this year we had three positive tests. One was a contractor who was randomly selected and who failed to report for testing. He was made an administrative positive. The second positive was a contractor who was positive for marijuana at the 50 ng.

limit. The third positive was a Boston Edison employee who was positive in follow-up testing.

The employee has been discharged.

We tested 30.75 percent of our work force during this six month period. Our total positive test l

rate was 0.48 percent. This represents a drop in our positive tests' percentages. We tested six l

people for cause. No one was positive. Four of the 6 people tested for cause were licensee employee's. Eighteen Follow Up tests were performed. One licensee employee was positive.

Integrity checks revealed that there were 3 specimens having creatinine levels ofless than 200 ng. All of these tests were repeated. One of these tests was required to be observed.

There were no reportable events as required by 10CFR26.73.

i LLH f

7/30/98 g

y

PERSONNEL SUBJECT TO 10CFR26 8/7/98 Dits Critsriz: Frrm: 01/01/98 To: 06/30/98 Bost:n Edison Company Pilgrim Nuclear'Fcwer Station Cont:ct Name Dr. Paul Keefe Phone (include area code)

(617)424-2372 BREAKDOWN OF CONFIRMED POSITIVE TESTS FOR SPECIFIC SUBSTANCES oN E' oNk"gE Soong"Imi S50$!mt No"ong mN"

  • n)[nf "

T t easse 0

0 1

0 0

0 0

contractor.

1 0

0 0

6 6

1 T j 1

1 0

0 0

1 I

I 9

1

..t.n..

[ Testing Results l

pcensee Employees l l Contractor Personnel l

Average Number with bT6.14 176.26 Unescorted Access l Categories l

[ Tested l Positive l[ Tested l Positive l

Pre-Access l

l 41l l 0;l 8@ l 1l For Cause l

l 4{ l 4l 2j l Oi Random l

l 201l l O!l 55[l 0{

Follow Up/Other l

l 18i l 1ll 6l l 0;

[ Total l

l 264ll 1] l 149;l 1]

30.75 %

PERCENT OF TOTAL WORKFORCE RANDOMLY TESTED DURING THIS PERIOD

=

0.48 %

PERCENT OF POSITIVES FOR TOTAL WORKFORCE DURING THIS PERIOD

=

. _ _ _ _